1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Integrated Steel Plant by Shri Bajrang Power & Ispat Limited | (b)Name of the Company / Organisation | SHRI BAJRANG POWER ISPAT LIMITED | (c)Registered Address | Borjhara, Urla - Guma Road
Raipur (CG),,Raipur,Chhattisgarh-493221 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shravan Kumar Goyal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Borjhara, Urla - Guma Road
Raipur,,Raipur,Raipur,Chhattisgarh-493221 | (d)Pin code | 493221 | (e)E-mail | bajrangtelang@gmail.com | (f)STD Code. | 771(f)Telephone No. | 4288019 | (g)Fax No. | 2323601 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/260531/2007 | (d)Master Proposal Number(Single Window) | SW/260524/2022 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 173, 174, 175, 176, 177 & 178 | (b)Pincode | 493221 | (c)Bounded Latitudes (North) | | From | | Degree | 21 | Minutes | 18 | Second | 23.02 | From | | Degree | 21 | Minutes | 18 | Second | 46.34 | (d)Bounded Longitudes (East) | | From | | Degree | 81 | Minutes | 35 | Second | 11.75 | From | | Degree | 81 | Minutes | 35 | Second | 43.21 | (e)Survey of India Topo Sheet No. | 64 G/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 277 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 2.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | Raipur | Raipur | Borjhara | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SBPIL/07-08/2814 | (b)Date of Apply of TOR | 22 Jan 2007 | (c)Date of Issue of TOR / Standard ToR | 07 Mar 2007 | (d)Date of Apply of EC | 14 Nov 2017 | (e)Date of Issue of EC | 17 Jan 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 21 Dec 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.50 |
| Saamudayik Building,Gram Panchayat Naya Bendri | State : | Chhattisgarh | District : | Raipur | Tehsil : | Raipur | Village : | Borjhara |
| 100 | 1.Employment to locals. 2.To develop local school as Smart School. 3.To provide Vocational Training Institute. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Raipur | (iii)Letter No. | 5-23/2008(ENV)/-1057 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 14 2022 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sponge Iron Plant | 210000 | 0 | 210000.000 | Tons per Annum(TPA) | | Road | | (2.) | Captive Power Plant | 26 MW 18 WHRB + 8 MW Biomass & Dolachar based CPP | 0 | 26.000 | Mega Watt(MW) | | Others | Grid | (3.) | Steel Melting Shop | 129600 | 81600 | 211200.000 | Tons per Annum(TPA) | | Road | | (4.) | Rolling Mill | 150000 | 60000 | 210000.000 | Tons per Annum(TPA) | | Road | | (5.) | Titanium Slag Plant | 0 | 36000 | 36000.000 | Tons per Annum(TPA) | | Road | | (6.) | Pig Iron Plant | 0 | 20000 | 20000.000 | Tons per Annum(TPA) | | Road | | (7.) | Iron Ore Washery Plant | 0 | 400000 | 400000.000 | Tons per Annum(TPA) | | Road | | (8.) | Coal Washery | 600000 | 0 | 600000.000 | Tons per Annum(TPA) | | Road | | (9.) | Ferro Alloys | 14400 | 5400 | 19800.000 | Tons per Annum(TPA) | | Road | | (10.) | Pellet Plant with Coal Gasifier | 0 | 600000 | 600000.000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Captive Power Plant | 26 MW | 0 | 26 MW | No change in capacity & No change in Fuel Mix. | (2.) | Rolling Mill | 150000 TPA | 60000 TPA | 210000 TPA | Optimization of production capacity of Rolling Mill by curtailing Idle running hours. | (3.) | Coal Washery | 6,00,000 TPA | 0 | 6,00,000 TPA | No change in capacity. | (4.) | Titanium Slag Plant | Nil | 36,000 TPA | 36,000 TPA | New unit 4 X 4.5 MVA SAF will be installed to produce Titanium slag | (5.) | Pellet plant with coal gasifier | Nil | 6,00,000 TPA | 6,00,000 TPA | Pellet Plant will be installed with coal gasifier of 9000 Nm3/hr | (6.) | Sponge Iron Pant | 2 x 350 TPD | - | 2 x 350 TPD | No Change | (7.) | Pig Iron Plant | Nil | 20000 TPA | 20000 TPA | installation of Pig Iron caster of 20,000 TPA capacity attached to Titanium Slag Plant. | (8.) | Ferro Alloy Plant | 2 x 4 MVA (SAF) | 1 x 5 MVA + 1 x 6 MVA (SAF) | 1 x 5 MVA + 1 x 6 MVA (SAF) | Existing furnaces 4 MVA – 2 Nos. will be replaced by higher capacity transformer 1X5 MVA+1X6 MVA | (9.) | Steel Melting Shop | 5 x 8T Induction Furnace | 5 X 15T Induction Furnace | 5 X 15T Induction Furnace | Two more induction furnaces of 15 T each will be installed. | (10.) | Iron Ore Washery Plant | Nil | 4,00,000 TPA | 4,00,000 TPA | - | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Mar 2023 | (iv)Valid Upto | 31 Mar 2024 | (v)File No. | 8545/TS/CECB/ 2023 | (vi)Application No. | 11320803 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 186 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 12.92 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.82 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.61 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1832284 | (b)Existing quantity of raw material/fuel | 972007 | (c)Total quantity of raw material/fuel | 2804291 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron Ore | 315000 | Tons per Annum | | Mines- Hahaladdi, NMDC, Bailadila | Road | | 420 | Captive | | Copy of Linkage | (2.) | Coal | 260440 | Tons per Annum | | SECL, Imported | Road | | 250 | Linkage | | Copy of Linkage | (3.) | Dolomite | 10380 | Tons per Annum | | Mines-Mandla, Katni | Road | | 285 | Open Market | | Copy of Linkage | (4.) | Rice Husk | 125004 | Tons per Annum | | Local Rice Mill | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Pig Iron | 8784 | Tons per Annum | | Own Plant | Road | | 0 | Captive | | Copy of Linkage | (6.) | Scrap | 22176 | Tons per Annum | | Own Plant | Road | | 0 | Captive | | Copy of Linkage | (7.) | Fe-Mn Slag | 19800 | Tons per Annum | | Own Plant | Road | | 0 | Captive | | Copy of Linkage | (8.) | Iron ore fines and concentrate | 612000 | Tons per Annum | | Mines- Hahaladdi, Orissa Own Plant at Tilda | Road | | 600 | Captive | | Copy of Linkage | (9.) | Limestone | 9000 | Tons per Annum | | Katni | Road | | 450 | Open Market | | Copy of Linkage | (10.) | Bentonite | 4800 | Tons per Annum | | Bhuj and local market | Road | | 1450 | Open Market | | Copy of Linkage | (11.) | Coal for gasification system | 27000 | Tons per Annum | | SECL, Imported | Road | | 250 | Linkage | | Copy of Linkage | (12.) | Ilmenite | 72900 | Tons per Annum | | IREL & Other Suppliers | Road | | 600 | Open Market | | Copy of Linkage | (13.) | Coke Titanium Slag | 12600 | Tons per Annum | | Nagpur & Jharkhand | Road | | 644 | Open Market | | Copy of Linkage | (14.) | Sponge Iron | 215388 | Tons per Annum | | Own Plant | Road | | 0 | Captive | | Copy of Linkage | (15.) | Manganese ore | 35640 | Tons per Annum | | Mines-Garividi, MOIL- Balaghat | Road | | 512 | Linkage | | Copy of Linkage | (16.) | Coke Pellet | 21000 | Tons per Annum | | Nagpur & Jharkhand | Road | | 644 | Open Market | | Copy of Linkage | (17.) | Dolochar | 66000 | Tons per Annum | | Own Plant | Road | | 0 | Captive | | Copy of Linkage | (18.) | Graphite | 900 | Tons per Annum | | Imported/Indigenous | Road | | 500 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 05 May 2021 To 05 Jun 2021 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 30.8 | 11.3 | 29.8 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 88.0 | 43.5 | 87.2 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 38.5 | 17.9 | 38.5 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 16.3 | 10.5 | 16.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 07 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.33 | 7.14 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 196 | 146 | 200 | 600 | (3.) | TSS | | | mg/l | | 5 | 0 | 0 | 0 | (4.) | Fluoride | | | mg/l | | 0.14 | 0.08 | 1 | 1.5 | (5.) | TDS | | | mg/l | | 581.4 | 314.3 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 56.9 | 18.9 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 08 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.51 | 6.55 | A | (2.) | BOD | | mg/l | | 4.2 | 3.0 | B | (3.) | COD | | mg/l | | 34 | 08 | B | (4.) | DO | | mg/l | | 5.2 | 3.8 | C | |
14.4. No. of Ambient Noise monitoring locations : 08 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 72 | 34 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 68 | 30 | 70 | |
14.5. No. of Soil Sample Monitored locations : 08 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.28 | 6.18 | (2.) | N(Nitrogen) | Kilogram per hectare | | 4264.5 | 282.6 | (3.) | Electric Conductivity | Others | µS/cm | 428.6 | 124.6 | (4.) | K(Potassium) | Kilogram per hectare | | 864.6 | 246.0 | (5.) | P(Phosphorus) | Kilogram per hectare | | 86.4 | 22.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3507 | 11 | Copy of Permission Letter | Pipeline | | Others | Intake Point | 5010/302/JS/TS/AJP/03-D-4 | 26 Oct 2004 | 4166 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Captive Power Plant | 67 | 67 | Neutralization Tank | Others | Sent to sponge iron plant cooling | 67 | 0 | (2.) | Coal Gasifier | 4 | 4 | ETP | Others | Sent to ABC of Sponge Iron Kiln | 4 | 0 | (3.) | Iron Ore Washery Plant | 60 | 60 | Settling tank | Others | Recycled back as fresh water | 60 | 0 | (4.) | Domestic | 22 | 30 | STP | Green Belt Renewal Plant | | 22 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 153 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 153 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Fly ash (SID) | Industrial Waste | | 69300 | Tons | 0 | Road | | Others | Bricks manufacturing unit & Cement Plant | (2.) | Slag from SMS unit | Industrial Waste | | 17000 | Tons | 0 | Road | | Others | Bricks manufacturing | (3.) | Iron Ore Washery Reject (Fines) | Industrial Waste | | 40000 | Tons | 30 | Road | | Others | Slimes will be given to cement plants, | (4.) | Rejects from Coal Washery | Industrial Waste | | 240000 | Tons | 30 | Road | | Others | Used in our AFBC Gondwara unit | (5.) | Dolochar from SID | Industrial Waste | | 66000 | Tons | 30 | Road | | Others | Used in our AFBC Gondwara unit | (6.) | Ash from Coal Gasifier | Industrial Waste | | 7920 | Tons | 0 | Road | | Others | Disposal to Red bricks manufacturing unit. | (7.) | Tar | Industrial Waste | | 1320 | Tons | 0 | Road | | Others | Used in Pellet Plant | (8.) | Fly ash (power plant) | Industrial Waste | | 58680 | Tons | 0 | Road | | Others | Bricks manufacturing unit & Cement Plant | (9.) | Slag from Ferro Alloys unit | Industrial Waste | | 17280 | Tons | 0 | Road | | Others | Bricks manufacturing | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 88.0 | 0 | 3.0 | 91.0 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 38.5 | 0 | 3.0 | 41.5 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 16.3 | 0 | 2.0 | 18.3 | 80 | (4.) | NOx | | Microgram per Meter Cube | 30.8 | 0 | 0.7 | 31.5 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Ferro Alloys Plant | Electricity | 32 | 1.81 | PM10 | | 0.83 | (2.) | SMS Induction Furnace | Electricity | 30 | 0.85 | PM10 | | 0.61 | (3.) | Coal Washery | - | 30 | 0.35 | PM10 | | 0.15 | (4.) | Pellet Plant | Coal | 50 | 2.8 | PM10 | | 3.5 | (5.) | Combined sponge iron +WHRB+ biomass power plant | Coal | 80 | 3.73 | PM10 | | 2.35 | (6.) | Titanium Slag Plant | Electricity | 36 | 1.0 | PM10 | | 0.44 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 26000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | one 1000kVA + one 2000kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 31.8 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 31.8 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 14725.25 | (b)Waste/Barren Land (ha.) | 4866.01 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2100.25 | (e)Settlements (ha.) | 6498.75 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mining/Ind./ Quarry | 3225.08 | Total (ha.) | 31415.3400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 10.49 | | (2.) | Built Up Area | | 11.46 | | (3.) | Others | Parking Bay, open area and roads | 9.85 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None within 10 km radius | 0 | NA | (2.) | Wildlife Corridors | None within 10 km radius | 0 | NA | (3.) | Critically Polluted Area | Urla Growth Centre, Raipur | 0 | Project is located in Critically Polluted Area | (4.) | Corridors | None within 10 km radius | 0 | NA | (5.) | WLS | None within 10 km radius | 0 | NA | (6.) | ESZs | None within 10 km radius | 0 | NA | (7.) | NPA | None within 10 km radius | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None within 10 km radius | 0 | NA | (2.) | Archaeological Sites | | None within 10 km radius | 0 | NA | (3.) | Defence Installations | | None within 10 km radius | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 31.8 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharun River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 2.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 200 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 10.49 | 2.5 | 12.99 | (2.) | Percentage of Total Project Area | 33 | 7.8 | 40.8 | (3.) | No. of Plants | 27000 | 5600 | 32600 | (4.) | Funds Allocated | 1000000 | 2800000 | 3800000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | • Employment generation
• Development of Infrastructure under CER | (2.) | Financial | Revenue generation in form of GST, IT and Other Taxes for State and Central Government. | (3.) | Environmental | Greenbelt Development | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/ SA 0165 | (ii)Name of the EIA Consultant | Pollution and Ecology Control Services | (iii)Address | Near Dhantoli Police Station, Dhantoli Nagpur-440012 | (iv)Mobile No. | 9373128182 | (v)Landline No. | 0712229322 | (vi)Email Id | pecs_nagpur@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 10 Apr 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | Eds Raise Letter | Please respond to the attached EDS points | 11 Mar 2022 | 2. | Eds Reply Letter | EDS reply has been uploaded. | 09 Apr 2022 | 3. | NA | The project is located in Critically Polluted Area. As per directions of Hon'ble Supreme Court expansion/new industry cannot be set up in SPA/CPA. | 19 Apr 2022 | 4. | Eds Reply Letter | EDS Reply as per Office Memorandum of MoEFCC, New Delhi vide F. No. 22-23/2018-IA.III [E 115231] dated 5th July, 2022. | 19 Aug 2022 | 5. | NA | Dear Sir, Your proposal has been examined and following are the deficiencies needs to be rectified and to be uploaded/submitted on Parivesh Portal:(i) Date of site visit in CCR is 04/06/2021, A Certified Compliance Report (CCR) issued by the concerned Authority shall be valid for a period of one year from the date of inspection as per MoEFCC OM dated 8th June, 2022, please upload a valid document. | 22 Aug 2022 | 6. | Eds Reply Letter | The EDS reply has been uploaded. | 14 Oct 2022 | 7. | NA | EDS has been raised on 11.03.2022, 19.04.2022 and 22.04.2022. PP was asked to submit a valid CCR as the previous CCR validity expired in pursuance to MoEF&CC OM dated 8th June, 2022. PP has submitted the CCR along-with the ATR on the partially complied conditions. However, closure report from IRO is not submitted. | 21 Oct 2022 | 8. | Eds Reply Letter | EDS Reply uploaded | 04 Mar 2023 | 9. | NA | Dear Sir,
On perusal of your application still a lot of deficiencies and PP is unable to submit the details:
(i) CCR closure report has not been submitted by the PP which was earlier sought. This is not good practice on behalf of the PP/Consultant.
(ii) This is the violation case and PP has not submitted the Revised EIA/EMP Report alongwith Copy of Remediation Plan and details of Penalty as per the provisions of the SOP dated 07.07.2021. In this regard, the Ministry has already communicated to PP; However PP has not submitted the details of violation and tried to hide the information.
(iii) Thoush it is a violation case and PP has submitted its application under SOP dated 07.07.2021.
(iv) Details of credible action as per SOP dated 07.07.2021 needs to be uploaded. PP immediately needs to stop the operation of the violated part of the implementation.
(v) In view of the above violation case, PP needs to submit the Revised EIA/EMP Report as per SOP dated 07.07.2021 immediately for further appraisal by the EAC. | 16 Mar 2023 | 10. | Eds Reply Letter | The reply of EDS raised on 16th March 2023 has been uploaded. | 31 Mar 2023 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | Dear Sir,
It may be mentioned that in the meantime in WP (Civil) No. 1394/2023 in Vanshakti Vs UoI, Hon'ble Supreme Court vide its order dated 02.01.2024 has inter-alia ordered that "Until further orders, there shall be stay of operation of the Office Memoranda dated 7th July 2021 and 28th January 2022 issued by the Ministry of Environment, Forest and Climate Change." In pursuance to the same, the instant proposal may be kept in abeyance till further orders, since the instant proposal was submitted under violation category as per the provisions contained in the MoEF&CC Standard Operating Procedure (SOP) dated 07.07.2021. MoEFCC vide letter dated 8th January 2024 has already issued the OM in this regard. | 18 Jan 2024 | 2. | ADS Reply Letter | With reference to your ADS raised on 29.12.2023. We apologies for the documents submitted on dated 12/12/2023 in reply to ADS raised on 29.07.2023 were not legible and properly scanned. We would like to inform that CECB has forwarded credible action taken report to MoEF&CC as per instruction. We are attaching herewith legible and adequately scanned document, for the same is attached as Annexure I.
We request you to kindly process our application for the grant of Environmental Clearance | 02 Jan 2024 | 3. | NA | Dear Sir,
On perusal of documents which you have uploaded on the portal. The PP/Consultant has not adequately scanned the documents & uploaded correctly. The documents are not legible properly. In this context, since the whole process is online on portal, PP needs to upload the correct and proper scanned documents which are legible in nature quickly. The information shall be uploaded immediately for further processing please. | 29 Dec 2023 | 4. | ADS Reply Letter | Submission of ADS reply raised on date 29.07.2023. | 12 Dec 2023 | 5. | ADS Raise Letter | Sir,
This is with reference to an earlier email dated 8th June 2023 regarding the request for
credible action taken against the Project Proponent as per SOP dated 07.07.2021 for a
proposed project " Expansion of Integrated Steel Plant by M/s Shri Bajrang Power & Ispat
Limited, located at Village-Borjhara, Urla – Guma Road, Urla Growth Center, Raipur
District, Chhattisgarh- Consideration of Environmental Clearance under violation
category".
It may be mentioned that the document submitted by PP/SPCB has been examined by the
PD in the Ministry and it was observed that the SPCB has filed the court case under the
Water Prevention and Control of Pollution Act 1974, not as per E (P) Act, 1986. The PP
has to submit the documents/credible action taken/court case filed against the PP under
the provisions of the Environment (Protection) Act, 1986 as per the provisions of Ministry’s
OM dated 07.07.2021 for Violation.
In view of the above, the undersigned has been directed to request you kindly submit the
information regarding the credible action taken/court case files against M/sShri Bajrang
Power & Ispat Limited and others for the offence committed u/s 19 of Environment
(Protection) Act, 1986. | 29 Jul 2023 | 6. | ADS Raise Letter | Sir,
This is with reference to an earlier email dated 8th June 2023 regarding the request for
credible action taken against the Project Proponent as per SOP dated 07.07.2021 for a
proposed project " Expansion of Integrated Steel Plant by M/s Shri Bajrang Power & Ispat
Limited, located at Village-Borjhara, Urla – Guma Road, Urla Growth Center, Raipur
District, Chhattisgarh- Consideration of Environmental Clearance under violation
category".
It may be mentioned that the document submitted by PP/SPCB has been examined by the
PD in the Ministry and it was observed that the SPCB has filed the court case under the
Water Prevention and Control of Pollution Act 1974, not as per E (P) Act, 1986. The PP
has to submit the documents/credible action taken/court case filed against the PP under
the provisions of the Environment (Protection) Act, 1986 as per the provisions of Ministry’s
OM dated 07.07.2021 for Violation.
In view of the above, the undersigned has been directed to request you kindly submit the
information regarding the credible action taken/court case files against M/sShri Bajrang
Power & Ispat Limited and others for the offence committed u/s 19 of Environment
(Protection) Act, 1986. | 29 Jul 2023 | 7. | ADS Reply Letter | We are forwarding the letter sent by Head Office regarding the credible action taken against our industry for violation case. | 14 Jun 2023 | 8. | ADS Raise Letter | Dear Sir,
The matter has been examined in the Ministry and accordingly the SPCB, vide email dated 26.05.2023, has been requested for submitting the details of credible action/court case against the PP as per SOP dated 07.07.2021. Copy of the Email dated 26.05.2023 is attached herewith. | 26 May 2023 | 9. | ADS Reply Letter | Submission of ADS reply | 04 May 2023 | 10. | NA | Dear Sir,
The proposal was considered by the EAC in its meeting held during April 12-13 & 17, 2023 wherein the EAC and after detailed deliberations, recommended the instant proposal for grant of Environment Clearance. The PP needs to upload the written submission on Parivesh portal as the whole process is online on Portal.
2. In view of the above, PP is kindly requested to upload the information based on the recommendation of the EAC for further necessary action by the Ministry. | 01 May 2023 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shravan Kumar Goyal | Designation | Director | Name of Company (Applicant Name should not be given here) | SHRI BAJRANG POWER ISPAT LIMITED | Address | Borjhara, Urla - Guma Road
Raipur (CG) |
|