Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Rauli kalyanpur Granite (Khanda,Gitty,Boulder) and Pahadi Red Morrum Mine
(b)Name of the Company / Organisation PROJECT PROPONENT
(c)Registered Address Resident of -Padri,Shivrampur,Karwi District Chitrakoot (U.P),,Agra,Uttar Pradesh-210205
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant anil singh
(b)Designation (Owner/ Partner/ CEO) proponent
(c)Address Resident of -Padri,Shivrampur,Karwi District Chitrakoot (U.P),Chitrakoot,Uttar Pradesh-210205
(d)Pin code 210205
(e)E-mail anilkmsingh877@gmail.com
(f)Telephone No. 522-4244959
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/UP/MIN/42530/2019
(e)Master Proposal Number(Single Window) SW/117350/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gata no 2131/1
(b)Pincode 210205
(c)Bounded Latitudes (North)
From
Degree 251205.01
Minutes
Second
From
Degree 251259.28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 804251.10
Minutes
Second
From
Degree 804256.42
Minutes
Second
(e)Survey of India Topo Sheet No. 63G7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 181.30
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 13.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshChitrakootKarwiRauli Kalyanpur
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 0311
(b)Date of Apply of TOR 01 May 2019
(c)Date of Issue of TOR / Standard ToR 01 Sep 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason falls under category B 2
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)00not applicable in stone mining project
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)30363 TPA/1.2145 ha30363Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.45
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.03
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.03
(e) Funds Allocated for Environment Management Capital(%) NaN
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1.1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water1.1Kilo Litre per Daytanker/Private agenciesRoad15 Othersno linkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Mili Gram per Meter Cube0000
(2.)SO2Micro Gram per Meter Cube0000
(3.)PM2.5Mili Gram per Meter Cube0000
(4.)NOxNano Gram per Meter Cube0000
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l0000
(3.)Chloridesmg/l0000
(4.)Fluoridemg/l0000
(5.)pHNA0000
(6.)TDSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l00A
(2.)CODmg/l00A
(3.)DOmg/l00A
(4.)BODmg/l00A
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Litre00
(2.)pH00
(3.)K(Potassium)Milligram per Litre00
(4.)N(Nitrogen)Milligram per Litre00
(5.)Electric ConductivityMillisiemens per Centimetre00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20.90 To 8.60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.43 To 2.92
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1.115Copy of Permission LettermodeOthersthrough roadsOtherspurchase of water tankers from concerned bodies000001 Jul 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000Reuse within the Plant & Recycling0
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)0Othersnot applicable0000Tons15RoadOthersnot applicable
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)PM10Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source not applicable
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) not applicable
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 1.2145
(e)Other Land 0
    Total Land 1.2145
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 1.2145
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 1.2145
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Othersnot applicable0
Total 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsnot available0it does not come in 10 km of area
(2.)Wildlife Corridorsnot available0it does not come in 10 km of area
(3.)Critically Polluted Areanot available0it does not come in 10 km of area
(4.)ESZsnot available0it does not come in 10 km of area
(5.)Corridorsnot available0it does not come in 10 km of area
(6.)NPAnot available0it does not come in 10 km of area
(7.)WLSnot available0it does not come in 10 km of area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnot applicable0not in 10 kms of area
(2.)Othersnot applicablenot applicable00
(3.)Forestnot applicable0not in 10 kms of area
(4.)Defence Installationsnot applicable0not in 10 kms of area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 11
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 12
(e)No. of working days 300
(f)Total Manpower 23
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.401
(b)Percentage of Total Project Area 33.02
(c)No. of Plants to be Planted 642
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialemployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)granite(khanda,gitty,boulder)and pahadi red morrumMinor
2.
Mine Capacity in ROM (Run of Mine) 30363
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 771/M.plan/2016
(b)Date of Approval 13 Aug 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1.2145
(f)Approved Capacity 30363
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 894362.5
(b)Mineable Reserves (Million Ton) 30363
(c)Extractable Reserves(Million Ton) 30363
(d)Percent(%) of Extraction 60
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 8
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.2145
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 22 Jun 2019
(iii)Validity of LOI 20
(iv)Reference No. of LOI 1270/khanij/2019-20
(c)Whether Lease Deed Executed ? No
(i)Reason thereof FRESH/NEW LEASE
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof FRESH/NEW LEASE
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 1.2145 (hectare) at a Depth of 6.0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.2145
13.
Details of Transportation:
(a)In Pit/Underground to Surface NA
(b)Surface to Siding/Loading transported to the market
(c)Transportation / Conveyor Details TRUCKS DUMPERS
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)SETTLEMENTS000
(3.)AGRICULTURE LAND000
(4.)SURFACE WATER BODIES000
(5.)WASTE LAND1.214501.2145
(6.)GRAZING LAND000
TOTAL1.214501.2145
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT63400634
(2.)EXCAVATION/QUARRY0000
(3.)EXTERNAL OB DUMPS0000
(4.)BUILT UP AREA (COLONY/OFFICE)0000
(5.)ROADS0000
(6.)INTERNAL OB DUMPS0000
(7.)TOP SOIL STORAGE0000
(8.)VIRGIN AREA0000
TOTAL634000634
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 1.2145
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 1.2145
(d)Safety Zone(in hectare) 0.001
(e)Final Void of 1.2145 (hectare) at a Depth of 6.0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 634
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.401
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA006
(ii)Name of the EIA Consultant COGNIZANCE RESEARCH INDIA PRIVATE LIMITED
(iii)Address GT-20,SECTOR-117 NOIDA-201301
(iv)Mobile No. 8826287364
(v)Landline No. 0114353475
(vi)Email Id subh2enviro@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)18/11/2019Please submit the information/clarification as directed by SEAC in its meeting dated 23/10/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(2.)21/11/2019Please consider above mentioned file in next upcoming agenaADS Letter
(3.)20/01/2020Please submit the information/clarification as directed by SEAC in its meeting dated 12/12/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(4.)03/12/2020Please consider above mentioned file in next upcoming agenaADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantanil singh
Designationproponent
Name of Company (Applicant Name should not be given here)PROJECT PROPONENT
AddressResident of -Padri,Shivrampur,Karwi District Chitrakoot (U.P)