Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Panchsheel Primrose Group Housing Complex at Khasra No.804, 805, 806, 807, 808, 809, 812, 813, 814, 815, 816, 817, 819, 820, 821, 838, 839, 840, 851 & 852, Village-Harsaon, NH-24, Ghaziabad by M/s Panchsheel Buildtech Pvt.Ltd.
(b)Name of the Company / Organisation PANCHSHEEL BUILDTECH PRIVATE LIMITED
(c)Registered Address M/s Panchsheel Buildtech Pvt. Ltd. H-169, sector 63, Noida ,,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ravi Kant Seth
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address M/s Panchsheel Buildtech Pvt. Ltd. H-169, sector 63, Noida ,,,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Pin code 201301
(e)E-mail pr@panchsheelgroup.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/MIS/77433/2010
(e)Master Proposal Number(Single Window) SW/275243/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No.804, 805, 806, 807, 808, 809, 812, 813,
(b)Pincode 201002
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 40
Second 38.07
From
Degree 28
Minutes 40
Second 35.42
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 29
Second 9.08
From
Degree 77
Minutes 29
Second 7.31
(e)Survey of India Topo Sheet No. 53h/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 216
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 7.61
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshGhaziabadGhaziabadVillage-Harsaon, NH-24, Ghaziabad
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 1111/SEAC/390/2010/AA(S)
(b)Date of Apply of EC 17 Feb 2010
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per para 3(d) of EIA Notification,2006.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. 1
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot Area61615.28907.362522.58OthersSq.mRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Built Up Area190774.80971665.687262440.496It is expansion project
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Mar 2020
(iv)Valid Upto 23 Nov 2022
(v)File No. 1
(vi)Application No. 1
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 108.73
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.69
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.16
(e) Funds Allocated for Environment Management Capital(%) 0.63
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)00Tons per Annum0Road0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2021 To 28 Feb 2022
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube9770.896.8100
(2.)PM2.5Micro Gram per Meter Cube6540.262.260
(3.)NOxMicro Gram per Meter Cube23.214.522.080
(4.)SO2Micro Gram per Meter Cube9.296.309.1680
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.357.236.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l885.7630.5855001000
(4.)Total Hardnessmg/l271.6205.1200500
(5.)Fluoridemg/l0.60.3811.5
(6.)Heavy MetalsLeadmg/l0.430.420.11
(7.)Chloridesmg/l75.073.7250500
    14.3.     No. of Surface Water Monitoring Locations : 03
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l3.783.50D
(2.)pHNA7.487.19D
(3.)BODmg/l11.3410.50D
(4.)CODmg/l72.967.5D
    14.4.     No. of Ambient Noise Monitoring Locations : 07
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.539.345
(2.)Leq(Day)A-weighted decibels(dB(A))53.750.755
    14.5.     No. of Soil Sample Monitored Locations : 07
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare45.226.2
(2.)N(Nitrogen)Kilogram per hectare6.85.4
(3.)K(Potassium)Kilogram per hectare69.662.6
(4.)Electric ConductivityMillisiemens per Centimetre25.320.6
(5.)pH7.837.38
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.21 To 22.78
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.30 To 21.95
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMuncipal Water Supply328.442.0Copy of Permission LettermodeOthersPipelineOthersMunicpal Water Supply111 May 2022328.44
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Water239.60300STPOthersSewer Line152.2987.31
16.1.
(a)Total Waste Water Generation 239.6
(b)Total Discharged Water 87.31
(c)Total Reused Water 152.29
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste4.30Tons1.0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube651.006560
(2.)SO2Microgram per Meter Cube9.291.00.349.6380
(3.)PM10Microgram per Meter Cube971.03.4100.4100
(4.)NOxMicrogram per Meter Cube23.21.02.926.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD6.00.25PM10,SO2,NOx0.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6000
(b)Source UPPCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 9 DG sets will be provided
(e)Stack Height (in m) 6.0
20.
Land Ownership Pattern:
(a)Forest Land 0.0
(b)Private Land 6.25225
(c)Government Land 0.0
(d)Revenue Land 0.0
(e)Other Land 0.0
    Total Land 6.25225
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 6.25225
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 6.25225
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area262440.496
Total 262440.496
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None within 10 Km radius of the Project
(2.)NPANone0None within 10 Km radius of the Project
(3.)ESAsNone0None within 10 Km radius of the Project
(4.)ESZsNone0.0None within 10 Km radius of the Project
(5.)CorridorsNone0None within 10 Km radius of the Project
(6.)Wildlife CorridorsNone0.0None within 10 Km radius of the Project
(7.)Critically Polluted AreaNone0None within 10 Km radius of the Project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None within 10 km radius of the project site
(2.)Defence InstallationsNone0None within 10 km radius of the project site
(3.)ForestNone0None within 10 km radius of the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0.0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.25
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hindon River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 7.61
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 327
(d)Temporary Employment- During Operation 104
(e)No. of working days 300
(f)Total Manpower 431
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.02.472
(2.)Percentage of Total Project Area039.5239
(3.)No. of Plants0140140
(4.)Funds Allocated02.02
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThis project will improve the surrounding environment by way of green belt development in the surrounding villages
(2.)FinancialThis project will improve the financial status of local village people by way of providing them employment
(3.)SocialThis project will provide the social benefits to the local people by way of health check up camps.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 102
(b)Total No. of Flats to be Build 1606
(c)No. of Buildings 3
(d)Total plot area (sqm) 62522.58
(e)Total built up area (sqm) 262440.496
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 11
    Capacity 252.298
(b)No. of Recharge Pits 9
    Capacity 28.848
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 711
5.
Energy Saving Measures:
(a)Source/Mode Solar Panel
(b)Percentage 40
(c)Quantity 5
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area None
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0047
(ii)Name of the EIA Consultant Ambiental Global Private Limited
(iii)Address Plot No-16, 2nd Floor, Sector-4, Vaishali, Ghaziabad, Uttar Pradesh
(iv)Mobile No. 0989996407
(v)Landline No. 0120451350
(vi)Email Id info@ambientalglobal.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 17 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)29/07/2022Please submit the information/clarification as directed by SEAC in its meeting dated 22/06/2022. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(2.)26/08/2022Dear Sir, We are hereby submitting reply of your ADS dated 29.07.2022 for your kind perusal and further necessary action on granting the Environmental Clearance.ADS Letter
(3.)02/11/2022Please submit the information/clarification as directed by SEAC in its meeting dated 27/09/2022. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(4.)30/12/2022Dear Sir, As, we are hereby submitting the ADS reply for your kind perusal and further action.ADS Letter
(5.)21/02/2023Please submit the information/clarification as directed by SEAC in its meeting dated 10/01/2023. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRavi Kant Seth
DesignationManager
Name of Company (Applicant Name should not be given here)PANCHSHEEL BUILDTECH PRIVATE LIMITED
AddressM/s Panchsheel Buildtech Pvt. Ltd. H-169, sector 63, Noida