| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Establishment of 180 KLPD Distillery Unit and 8 MW Co-Gen Power Unit by M/s Someshwar Sugars Limited | | (b)Name of the Company / Organisation | M/S. SOMESHWAR SUGARS LIMITED | | (c)Registered Address | Sy. No 349/3, 350/3,370,385/2 and Others, Kambagi Village, Bableshwar Taluk,Vijayapura District,,Vijayapura,Karnataka-586125 | | (d)Legal Status of the Company | Private | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Gurunath N Joshi | | (b)Designation (Owner/ Partner/ CEO) | Director | | (c)Address | M/s Indian Cane Power Limited, Uttur Village, Mudhol Yadwad Road, Mudhol Taluk, Bagalkot District.,,Bijapur,Bijapur,Karnataka-587313 | | (d)Pin code | 587313 | | (e)E-mail | ssldistillery21@gmail.com | | (f)STD Code. | 8350(f)Telephone No. | 274229 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 5(g) Distilleries
| | Minor Activity | | | (b)Category | A | | (c)Proposal Number | IA/KA/IND2/239948/2021 | | (d)Master Proposal Number(Single Window) | SW/239933/2021 | | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (f)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Sy. Nos. 349/3, 350/3, 370, 385/2 & others of Kamb | | (b)Pincode | 586125 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 16 | | Minutes | 34 | | Second | 40.91 | | From | | | Degree | 16 | | Minutes | 34 | | Second | 53.80 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 75 | | Minutes | 33 | | Second | 20.11 | | From | | | Degree | 75 | | Minutes | 33 | | Second | 2.05 | | (e)Survey of India Topo Sheet No. | 47 P/6, 47 P/7, 47 P/10 & 47 P/11 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 568 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 2 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Karnataka | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Karnataka | Bijapur | Bijapur | Kambagi Village, Bableshwar Taluk, Vijayapura Dist. Karnataka State. | |
|
| 6. | | Details of Terms of Reference (ToR): | | (a)MoEF&CC / SEIAA File Number | No.IA-J-11011/42/2021-IA-II(I) | | (b)Date of Apply of TOR | 01 Feb 2021 | | (c)Date of Issue of TOR / Standard ToR | 17 Feb 2021 | | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 10 Nov 2021 | | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| M/s. Someshwar Sugars Limited Project Site, Kambagi Village, Babaleshwar Taluk, Vijayapura District, Karnataka | | State : | Karnataka | | District : | Bijapur | | Tehsil : | Bijapur | | Village : | Kambagi Village, Bableshwar Taluk, Vijayapura Dist. Karnataka State. |
| 70 | Positive response from public for the proposed project with employement opportunitis to the people of nearby villagers | Deputy Commissioner | | |
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Co-generation Power Plant | 8 MW | | | (2.) | Ethanol/ENA/RS | 180 KLD | | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Rectified Spirit | 189 | Kilo Litre per Day | | Road | | | (2.) | Ethanol | 180 | Kilo Litre per Day | | Road | | | (3.) | Power (Co-generation) | 8 | Mega Watt(MW) | | Road | | | (4.) | Spent wash powder from cane syrup | 14.4 | Others | TPD | Road | | | (5.) | Spent wash powder from BH-Molasses | 69.6 | Others | TPD | Road | | | (6.) | Spent wash powder from C- molasses | 117 | Others | TPD | Road | | | (7.) | ENA | 180 | Kilo Litre per Day | | Road | | | (8.) | CO2 | 141 | Others | TPD | Road | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 281.73 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.71 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.22 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.5 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 2700 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 2700 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | sugarcane syrup/juice | 2700 | Others | TPD | Owm production/shifting from M/s. ICPL Unit | Road | | 45 | Others | From ICPL Industry | Copy of Linkage | | (2.) | H c l | 660 | Others | Kgs | Local Market | Road | | 10 | Open Market | | Copy of Linkage | | (3.) | Urea | 660 | Others | Kgs | Local Market | Road | | 10 | Open Market | | Copy of Linkage | | (4.) | Caustic lye | 660 | Others | Kgs | Local Market | Road | | 10 | Open Market | | Copy of Linkage | | (5.) | Anti-foam Agent | 360 | Others | Kg | Local Market | Road | | 10 | Open Market | | Copy of Linkage | | (6.) | Sulfuric Acid | 360 | Others | Liters | Local Market | Road,Others | Lorry tanker | 515 | Others | From Mumbai | Copy of Linkage | | (7.) | DAP | 180 | Others | Kgs | Local Market | Road | | 10 | Open Market | | Copy of Linkage | | (8.) | Bagasse as fuel | 501 | Others | TPD | From Own Production/Nearby Industries | Road,Conveyor Belt | | 10 | Others | From Own Production/Nearby Industries | Copy of Linkage | | (9.) | Molasses:B-Grade Heavy | 591 | Others | TPD | Own Production/Shifting from M/s. ICPL Unit | Road | | 45 | Others | From ICPL Industry | Copy of Linkage | | (10.) | Yeast | 330 | Others | Kgs | From Manufacturers | Road | | 10 | Open Market | | Copy of Linkage | | (11.) | Molasses C | 756 | Others | TPD | Own Production/Shifting from M/s. ICPL Unit | Road | | 45 | Others | From ICPL Industry | Copy of Linkage | | (12.) | Biogas | 48 | Others | TPD | Through pipeline from gas holder | Road,Pipe Conveyor | | 0 | Others | From Own Production | Copy of Linkage | | (13.) | Imported Coal | 64.80 | Others | TPD | Local Market | Road,Conveyor Belt | | 10 | Open Market | | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 02 Mar 2021 To 31 May 2021 | | (b)Season | Summer | |
|
| 14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM10 | | Micro Gram per Meter Cube | 74.2 | 56.6 | 74.11 | 100 | | (2.) | NOx | | Micro Gram per Meter Cube | 21.42 | 12.72 | 21.41 | 80 | | (3.) | Others | NH3 | Micro Gram per Meter Cube | 14.8 | 5.06 | 11.49 | 400 | | (4.) | PM2.5 | | Micro Gram per Meter Cube | 28.3 | 14.5 | 28.21 | 60 | | (5.) | SO2 | | Micro Gram per Meter Cube | 8.61 | 4.85 | 8.52 | 80 | |
| 14.2. No. of Ground Water monitoring locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | Total Hardness | | | mg/l | | 580 | 128 | 200 | 600 | | (2.) | TDS | | | mg/l | | 1256 | 370 | 500 | 2000 | | (3.) | Chlorides | | | mg/l | | 234.82 | 78.27 | 250 | 1000 | | (4.) | Fluoride | | | mg/l | | 0.61 | 0.21 | 1 | 1.5 | | (5.) | pH | | | Others | - | 7.46 | 7.07 | 6.5 | 8.5 | | (6.) | Others | Iron | | mg/l | | 0.09 | 0.00 | 1 | 1 | | (7.) | Others | Nitrate as NO3 | | mg/l | | 31.99 | 11.98 | 45 | 45 | | (8.) | Heavy Metals | | Copper | mg/l | | 0.00 | 0.00 | 0.05 | 1.5 | | (9.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | | (10.) | Heavy Metals | | Copper | mg/l | | 0.00 | 0.00 | 0.05 | 1.5 | | (11.) | Heavy Metals | | Zinc as Zn | mg/l | | 2.76 | 0.01 | 5 | 15 | |
| 14.3. No. of Surface Water monitoring locations : 4 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | pH | | Others | - | 8.41 | 7.78 | A | | (2.) | Others | Total Coliform | Others | MPN/100ml | 350 | 170 | C | | (3.) | BOD | | mg/l | | 32 | 4.1 | D | | (4.) | COD | | mg/l | | 108 | 12 | C | | (5.) | DO | | mg/l | | 5.3 | 4.3 | B | |
| 14.4. No. of Ambient Noise monitoring locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61 | 37.75 | 70 | | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 72 | 48.42 | 75 | |
| 14.5. No. of Soil Sample Monitored locations : 7 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | Others | - | 8.33 | 6.77 | | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 644 | 163 | | (3.) | K(Potassium) | Kilogram per hectare | | 1705.05 | 229.50 | | (4.) | P(Phosphorus) | Kilogram per hectare | | 1126.84 | 246.09 | | (5.) | N(Nitrogen) | Kilogram per hectare | - | 508.03 | 246.96 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.75 To 24.15 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.75 To 18.87 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | Krishna River | 2830 | 12.5 | Copy of Permission Letter | Pipeline | | Others | Pipeline | A.No.02,KBJNNL | 21 Oct 2016 | 4000 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Process wastewater | 1390 | 1400 | CPU | Reuse within the Plant & Recycling | | 1390 | | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 1390 | | (b)Total Discharged Water (Kilolitre per Day) | 0 | | (c)Total Reused Water (Kilolitre per Day) | 1390 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Bottom ash | Bottom Ash | | 5940 | Tons | 10 | Road | | Others | Sold out to brick manufacturers | | (2.) | Yeast Sludge | Industrial Waste | | 1782 | Tons | 0 | Road | | Others | Used as Manure | | (3.) | Sludge From | Industrial Waste | | 14.85 | Tons | 0 | Road | | Others | Used as Manure | | (4.) | Fly ash | Fly Ash | | 2640 | Tons | 10 | Road | | Others | Sold out to brick manufacturers | | (5.) | Oil soaked cotton waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.1 | Tons | 0 | Road | | Authorized Recyclers | | | (6.) | Domestic Solid Waste | Municipal Solid Waste | | 15.67 | Tons | 0 | Road | | Others | Handed Over to Nearest Municipalities | | (7.) | Used oil from DG sets | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | PM2.5 | | Microgram per Meter Cube | 21 | 1 | 0 | 21 | 60 | | (2.) | SO2 | | Microgram per Meter Cube | 6.99 | 1 | 0.05 | 7.04 | 80 | | (3.) | NOx | | Microgram per Meter Cube | 17.26 | 1 | 0.08 | 17.34 | 80 | | (4.) | PM10 | | Microgram per Meter Cube | 65.30 | 1 | 0.12 | 65.42 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | 60 TPH Boiler | Bagasse/Biofuel/Coal | 75 | 2.1 | PM10 | | - | | (2.) | 1250 KVA DG set | HSD | 32 | 1 | Others | PM, NOx, SOx | - | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 5037.5 | | (b)Source | Inhouse | | (c)Uploaded Copy of Agreement | Copy of Agreement | | (d)Standby Arrangement (Details of DG Sets) | 1250 KVA | | (e)Stack Height (in m) | 32 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 0 | | (b)Private Land (ha.) | 14.568 | | (c)Government Land (ha.) | 0 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 0 | | Total Land (ha.) | 14.568 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 15542 | | (b)Waste/Barren Land (ha.) | 12664 | | (c)Grazing/ Community Land (ha.) | 0 | | (d)Surface Water Bodies (ha.) | 611 | | (e)Settlements (ha.) | 529 | | (f)Industrial (ha.) | 0 | | (g)Forest (ha.) | 0 | | (h)Mangroves (ha.) | 0 | | (i)Marine Area (ha.) | 0 | | (j)Others (ha.) : Plantation and Scrub Land | 2082 | | Total (ha.) | 31428.0000 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Green belt | | 4.85 | | | (2.) | Others | Other Activities | 0.72 | Future development | | (3.) | Main Plant | | 8.98 | Process area, Roads, etc. | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Critically Polluted Area | NA | 0 | NA | | (2.) | NPA | NA | 0 | NA | | (3.) | Corridors | Nil | 0 | There is no ESZs within 10 Km Radius of the study area | | (4.) | Wildlife Corridors | Nil | 0 | NA | | (5.) | WLS | Yedahalli Wild Life Santuary | 23 | - | | (6.) | ESZs | Nil | 0 | There is no ESZs within 10 Km Radius of the study area | | (7.) | ESAs | Nil | 0 | NA | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Others | River | Krishna River | 12.5 | SW | | (2.) | Archaeological Sites | | Nil | 0 | - | | (3.) | Defence Installations | | Nil | 0 | - | | (4.) | Forest | | RF near Mamadapur | 5.1 | - | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 0 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | Present land use pattern of the project is Indust | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | | | (b)No. of Households | | | (c)No. of PDFs (Project Displaced Families) | | | (d)No. of PAFs (Project Affected Families) | | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | | (f)Status of R&R | NA | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | Black Kite, Brahminy Kite and Indian peafowl recorded in the study area | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | | (i)Uploaded copy of conservation plan | Copy of conservation plan | | (ii)Fund Provision made | 5 Lakhs | | (iii)Period of Implementation | 1 year | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Hire Halla | | (ii)Direction of Water Bodies in Buffer Area | West | | (iii)Distance of Water Bodies in Buffer Area | 6.6 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 270 | | (b)Permanent Employment-During Operation | 100 | | (c)Temporary Employment- During Construction | 30 | | (d)Temporary Employment- During Operation | 90 | | (e)No. of working days | 330 | | (f)Total Manpower | 490 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt | 4.85 | | (b)Percentage of Total Project Area | 33.29 | | (c)No. of Plants to be Planted | 4800 | | (d)Funds Allocated for Plantation | 480000 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Social | Employment opportunities for local populations and infrastructure development in nearby villages | | (2.) | Environmental | Greenbelt Development around the periphery of the project site. | | (3.) | Financial | Employment opportunities to local population will improve the financial status of the surrounding area | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details : NOT APPLICABLE |
| 35. Sector Specific Details For Industrial Projects - 2 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | QCI/NABET/EIA/1821/SA 0123 | | (ii)Name of the EIA Consultant | M/s Environmental Health and Safety Consultants Pv | | (iii)Address | No 174/New No .13/2, 14th 'E' Cross, Industrial Town, Agrahara Dasarahalli, Bangalore - 560 044 | | (iv)Mobile No. | 9886599677 | | (v)Landline No. | 0802301620 | | (vi)Email Id | ehscblr@yahoo.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 2 | | (ix)Validity of Accreditation | 18 Jan 2022 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | 1.Submit forwarding letter to MoEFCC in PH proceedings.
2. Submit valid surface water permission as it is issued in 2016 and valid for 5 years.
3. Resubmit conservation plan along with submission receipt.
4.Submit land documents and land conversion documents. Also submit undertaking mentioning khasra no. under possession and also stating that land conversion is completed.
5. Submit plagiarism certificate. | 24 Nov 2021 | | 2. | Eds Reply Letter | The EDS raised bi the ministry is uploaded on 25.11.2021 | 25 Nov 2021 | |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | Dear Sir,
As mentioned in our letter Dated 20.01.2022, CFO has not obtained so far from KSPCB for 2500 TCD and 15 MW Cogen and also for expansion of the industry from 2500 TCD to 15000 TCD and 15 MW to 70 MW since project work has not started at site. Hence application has not submitted for CFO.
Kindly issue the EC for Distillery at the earliest.
Thanks and Regards
Gurunath N.Joshi
General Manager | 24 Jan 2022 | | 2. | NA | Reply is not as per ADS raised dt 20.01.2022.Pl furnish quickly. | 21 Jan 2022 | | 3. | ADS Reply Letter | Uploaded on 20.01.2022 | 20 Jan 2022 | | 4. | NA | As per details submitted, it appears that sugar unit of 2500 TCD is operated on CTO. If so, please submit CTO compliance of 2500 TCD of Sugarcane & 15MW Co-gen power plant and CFE-Expansion compliance for increase in Crushing capacity from 2500 TCD to 15000 TCD of Sugarcane and Co-generation power plant capacity from 15 MW to 70 MW. Pl submit quickly to process the case further. | 20 Jan 2022 | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Gurunath N Joshi | | Designation | Director | | Name of Company (Applicant Name should not be given here) | M/S. SOMESHWAR SUGARS LIMITED | | Address | Sy. No 349/3, 350/3,370,385/2 and Others, Kambagi Village, Bableshwar Taluk,Vijayapura District |
|