| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Expansion of Molasses based Distillery from 75 to 110 KLPD for Ethanol production by using C / B Heavy Molasses/ Cane Syrup with 3 MW Captive Power Plant (CPP) including expansion of cane crushing from 10,000 to 12,000 TCD along with Co-generation Plant from 20 to 30 MW by Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Ltd (SDVSSKL) At: Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur, MS. | | (b)Name of the Company / Organisation | SHRI DUDHGANGA VEDGANGA SAHAKARI SAKHAR KARKHANA LIMITED | | (c)Registered Address | Bidri (Mouninagar), Tal. Kagal, Dist. Kolhapur,,Kolhapur,Maharashtra-416208 | | (d)Legal Status of the Company | Others | | (e)Joint Venture | No | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Krishna S Chaugale | | (b)Designation (Owner/ Partner/ CEO) | MD | | (c)Address | Bidri, Mouninagar, Tal. Kagal, Dist. Kolhapur,,Kagal,Kolhapur,Maharashtra-416208 | | (d)Pin code | 416208 | | (e)E-mail | purchase.bidri@yahoo.in | | (f)STD Code. | 2325(f)Telephone No. | 254922 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a.I)Project/Activity | 5(g) Distilleries
| | Minor Activity | 5(j) Sugar Industry
| | (b)Category | B2 | | Reason for Applying at Ministry | Other | | Other Reason for Applying at Ministry | Project to be appraised as B2 as per Notification S.O. 980 (E) 02.03.2021 under EBP program | | (c)Proposal Number | IA/MH/IND2/231257/2021 | | (d)Master Proposal Number(Single Window) | SW/231256/2021 | | (e)EAC concerned (for category A Projects only) | NIL | | (f)Project Type | Expansion under para 7(ii) |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Gat No. 1042, 1043, 1044, 1045, 1050, 1051/1, 1051 | | (b)Pincode | 416208 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 16 | | Minutes | 25 | | Second | 30.15 | | From | | | Degree | 16 | | Minutes | 25 | | Second | 53.35 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 74 | | Minutes | 7 | | Second | 59.70 | | From | | | Degree | 74 | | Minutes | 8 | | Second | 59.03 | | (e)Survey of India Topo Sheet No. | 47L2, 47L3 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 568 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | | (j)Seismic Zone | 4 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Maharashtra | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Maharashtra | Kolhapur | Kagal | Bidri (Mouninagar) | |
|
| 6. | | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
| 4. | | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
| 8. | | Details of Project Configuration/Product: | | Details Not Applicable | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | (a)Details of certified report on compliance of earlier environmental clearance condition | | (i)Certified Compliance By | Regional | | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | | (iii)Letter No. | EC-1247/RON/2020-NGP/7596 | | (iv)Status of Compliance | Compiled | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | | (vi)Date of site visit | Oct 15 2020 12:00AM | | (b)Details of Capacity Expansion | |
|
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Electric Power from Incineration Boiler | 0 | 3 | 3 | Mega Watt(MW) | | Others | Grid | | (2.) | Electricity | 20 | 10 | 30 | Mega Watt(MW) | | Others | Grid | | (3.) | CO2 gas | 1680 | 1050 | 2730 | Others | MT/M | Others | Cylinder | | (4.) | Ethanol (Sugarcane Syrup) | 0 | 110 | 110 | Kilo Litre per Day(KLD) | | Pipe Conveyor | | | (5.) | Pressmud | 12000 | 2400 | 14400 | Others | MT/M | Road | Grid | | (6.) | RS/ENA (B & C Heavy Molasses) | 75 | 0 | 75 | Kilo Litre per Day(KLD) | | Road | | | (7.) | Ethanol (B & C Heavy Molasses) | 75 | 35 | 110 | Kilo Litre per Day(KLD) | | Road | | | (8.) | Molasses | 12000 | 2400 | 14400 | Others | MT/M | Road | Grid | | (9.) | Bagasse | 90000 | 18000 | 108000 | Others | MT/M | Conveyor Belt | Grid | | (10.) | Sugar | 36000 | 7200 | 43200 | Others | MT/M | Road | Grid | |
| | | (c)Details of Configuration | |
|
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
|---|
| (1.) | Ditsillery | 75 KLPD | 35 KLPD | 110 KLPD | Expansion of Molasses based Distillery from 75 to 110 KLPD for Ethanol production | | (2.) | Sugar Factory | 10000 TCD | 2000 TCD | 12000 TCD | Expansion of cane crushing from 10,000 to 12,000 TCD | | (3.) | Co-generation Plant | 20 MW | 10 MW | 30 MW | Expansion of Co-gen Power Plant from 20 to 30 MW | |
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | 05 Nov 2020 | | (iv)Valid Upto | 31 Jul 2021 | | (v)File No. | Format1.0/CAC/UAN No. MPCB-CONSENT-0000093042/CR-2 | | (vi)Application No. | MPCB-CONSENT-0000093042 | | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in Crores) | 50 | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.30 | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.5 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.44 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 12210 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 12210 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Sugar cane | 360000 | Others | MT/M | Near by Farm | Road | | 40 | Open Market | | Copy of Linkage | | (2.) | Lime | 660 | Others | MT/M | Near by Market | Road | | 25 | Open Market | | Copy of Linkage | | (3.) | Sulfur | 216 | Others | MT/M | Near by Market | Road | | 25 | Open Market | | Copy of Linkage | | (4.) | Sugarcane for Juice | 47130 | Others | MT/M | Own factory/ outside purchase | Pipe Conveyor | | 0 | Open Market | | Copy of Linkage | | (5.) | Yeast | 14.67 | Others | MT/M | Local vendor | Road | | 30 | Open Market | | Copy of Linkage | | (6.) | Urea | 3.67 | Others | MT/M | Local vendor | Road | | 30 | Open Market | | Copy of Linkage | | (7.) | Bagasse | 60120 | Others | MT/M | Own Sugar Factory | Conveyor Belt | | 0 | Captive | | Copy of Linkage | | (8.) | De-Foaming Oil | 10.27 | Others | MT/M | Local vendor | Road | | 30 | Open Market | | Copy of Linkage | | (9.) | molasses | 12210 | Others | MT/M | Own factory/ outside purchase | Road | | 20 | Open Market | | Copy of Linkage | | (10.) | Lubricant | 50.4 | Others | MT/M | Near by Market | Road | | 25 | Others | Agreement | Copy of Linkage | |
|
| 16. | | Baseline Data | Not Applicable | |
|
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 16.28 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 8 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Surface | | 455 | 0.5 | Copy of Permission Letter | Pipeline | | Jack Well | | 468 | 22 Jul 2021 | 1636 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Domestic (Sugar, Cogen & Distillery | 25 | 25 | Proposed STP | Reuse within the Plant & Recycling | | 25 | | | (2.) | Industrial (Distillery Raw Spentwash) | 880 | 1000 | Raw Spentwash shall be conc. in Multi Effect Evaporator (MEE). Conc. Spentwash shall be burnt in existing 30 TPH incineration boiler | Others | Incinerate in incineration boiler | 880 | 0 | | (3.) | Other Effluent (Distillery) | 902 | 1000 | Proposed CPU | Reuse within the Plant & Recycling | | 902 | | | (4.) | Industrial Effluent (Sugar & Co-gen) | 713 | 1200 | Existing ETP which is recently upgraded | Green Belt Renewal Plant | | 713 | | |
|
| 16.1. | | (a)Total Waste Water Generation (Kilolitre per Day) | 2520 | | (b)Total Discharged Water (Kilolitre per Day) | 0 | | (c)Total Reused Water (Kilolitre per Day) | 2520 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Yeast Sludge | Industrial Waste | | 7590 | Tons | 0 | Road | | Others | Burnt in Incineration Boiler | | (2.) | CPU Sludge | Industrial Waste | | 308 | Tons | 0 | Road | | Others | Burnt in Incineration Boiler | | (3.) | ETP Sludge | Industrial Waste | | 126 | Tons | 0 | Road | | Others | Used as Manure | | (4.) | Boiler Ash (Bagasse) | Bottom Ash | | 9000 | Tons | 0 | Road | | Others | Used as Manure | | (5.) | Boiler Ash (Spentwash+Coal) | Bottom Ash | | 16830 | Tons | 0 | Road | | Others | Brick making | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | SO2 | | Microgram per Meter Cube | 30.14 | 1.98 | 6.93 | 37.08 | 80 | | (2.) | NOx | | Microgram per Meter Cube | 34.71 | 1.96 | 5.00 | 39.72 | 80 | | (3.) | PM2.5 | | Microgram per Meter Cube | 24.57 | 1.95 | 1.06 | 25.64 | 60 | | (4.) | PM10 | | Microgram per Meter Cube | 34.71 | 1.95 | 3.34 | 38.06 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | 120 TPH (Existing Boiler) | Bagasse | 80 | 3.4 | PM10 | | 0 | | (2.) | 60 TPH (Proposed Boiler) | Bagasse | 80 | 2.6 | PM10 | | 0 | | (3.) | 30 TPH (Existing incineration boiler) | Spentwash + Coal | 71 | 1.2 | PM10 | | 0 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 20000 | | (b)Source | Own Co-gen Plant & CPP | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | DG Sets 1500 KVA (2 Nos)+ 250 KVA (1 No) | | (e)Stack Height (in m) | 0.15 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land (ha.) | 0 | | (b)Private Land (ha.) | 72.60 | | (c)Government Land (ha.) | 0 | | (d)Revenue Land (ha.) | 0 | | (e)Other Land (ha.) | 0 | | Total Land (ha.) | 72.60 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area (ha.) | 8489 | | (b)Waste/Barren Land (ha.) | 0 | | (c)Grazing/ Community Land (ha.) | 0 | | (d)Surface Water Bodies (ha.) | 310 | | (e)Settlements (ha.) | 1638 | | (f)Industrial (ha.) | 0 | | (g)Forest (ha.) | 1290 | | (h)Mangroves (ha.) | 0 | | (i)Marine Area (ha.) | 0 | | (j)Others (ha.) : Scrub Land, Maning Area, Fallow land | 19688 | | Total (ha.) | 31415.0000 | |
|
| 22. Land requirement for various activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
|---|
| (1.) | Built Up Area | | 6.39 | | | (2.) | Green belt | | 23.96 | | | (3.) | Others | Open Area | 42.25 | Open + Parking+Road | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | ESZs | Radhanagari Wildlife Sanctuary | 9.9 | Project site is located at 9.9 Km from ESZ of Radhanagari Wildlife Sanctuary | | (2.) | NPA | Nil | 0 | There is no presence of NPA's in 10 Km radius of project | | (3.) | Wildlife Corridors | Nil | 0 | There is no presence of Wildlife Corridors in 10 Km radius of project | | (4.) | Critically Polluted Area | Nil | 0 | There is no presence of CPA's in 10 Km radius of project | | (5.) | WLS | Radhanagari Wildlife Sanctuary | 12.2 | Project site is located at 12.2 Km from extremeboundary of Radhanagari Wildlife Sanctuary | | (6.) | ESAs | Nil | 0 | There is no presence of any ESAs in 10 Km radius of project | | (7.) | Corridors | Nil | 0 | There is no presence of Corridors in 10 Km radius of project | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Archaeological Sites | | NA | 0 | There is no presence of Archaeological sites in 10 Km radius of project | | (2.) | Defence Installations | | NA | 0 | There is no presence of defense installation in 10 Km radius of project | | (3.) | Forest | | Reserve Forest | 1.5 | 4.11 % of total studyarea s under reservedforest scatteredaround the projectsite. | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 72.60 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | Industry already owned the land | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | | | (b)No. of Households | | | (c)No. of PDFs (Project Displaced Families) | | | (d)No. of PAFs (Project Affected Families) | | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | | (f)Status of R&R | NA | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | No | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Dudhganga River (0.7 Km) & Vedganga River (5.8 Km) | | (ii)Direction of Water Bodies in Buffer Area | South East | | (iii)Distance of Water Bodies in Buffer Area | 5.8 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 34 | | (c)Temporary Employment- During Construction | 0 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 330 | | (f)Total Manpower | 34 | |
|
|
| S. No. | Description | Existing | Proposed | Total |
|---|
| (1.) | Total Area of Green Belt | 9.44 | 14.52 | 23.96 | | (2.) | Percentage of Total Project Area | 13 | 20 | 33 | | (3.) | No. of Plants | 34735 | 25178 | 59913 | | (4.) | Funds Allocated | 50 | 50 | 100 | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Social | About 34 no of workers would be appointed under Expansion of distillery unit. Preference will be is given to persons from local area thereby creating better employment opportunities | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details : NOT APPLICABLE |
| 35. Sector Specific Details For Industrial Projects - 2 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1821/RA0135 | | (ii)Name of the EIA Consultant | Equinox Environments (I) Pvt. Ltd. | | (iii)Address | F-11, Namdev Nest, 1.160 āEā ward, Opp. Kamala College, Sykes Extension, K | | (iv)Mobile No. | 9657865122 | | (v)Landline No. | 0231253123 | | (vi)Email Id | projects@equinoxenvi.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 2 | | (ix)Validity of Accreditation | 21 Oct 2021 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Detail Sought: |
|---|
| Sno. | EDS Letter | Remarks | Date of EDS |
|---|
| 1. | NA | Name of applicant, authorizing person and authorized person are all different. Kindly clarify and resubmit.
Land use break up of study area shall be corrected and filled in Hectares not percentage.
Radhanagari Wildlife Sanctuary is falling beyond 10 km. submit final notification for ESZ and google earth map showing position of plant site and ESZ of sanctuary. Also submit undertaking that no sanctuary is lying in study area.
Accreditation of consultants is going to expire in this month only. Submit extension certificate while applying for EDS reply.
Submit plagiarism certificate in EIA.
Self certified affidavit shall be submitted in compliance to Notification dated 16th June, 2021. | 04 Oct 2021 | | 2. | Eds Reply Letter | The correction have been made as per the instruction received | 06 Oct 2021 | |
| Additional Detail Sought: |
|---|
| Sno. | ADS Letter | Remarks | Date of ADS |
|---|
| 1. | ADS Reply Letter | ADS reply has been submitted. | 01 Feb 2022 | | 2. | ADS Raise Letter | Factual Report is to be submitted as per attachment pl. | 01 Feb 2022 | | 3. | ADS Reply Letter | ADS reply has been submitted. | 31 Jan 2022 | | 4. | ADS Raise Letter | Factual report required from IRO for further n/a. | 27 Dec 2021 | | 5. | ADS Reply Letter | ADS reply has been submitted. | 22 Dec 2021 | | 6. | ADS Raise Letter | Pl see the attachment sent to IRO for information. | 29 Nov 2021 | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Krishna S Chaugale | | Designation | MD | | Name of Company (Applicant Name should not be given here) | SHRI DUDHGANGA VEDGANGA SAHAKARI SAKHAR KARKHANA LIMITED | | Address | Bidri (Mouninagar), Tal. Kagal, Dist. Kolhapur |
|