Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Satellite Town Ring Road (STRR) Phase-I newly declared National Highway NH-48A from Dabaspet (km 0.000) to Ramanagara (km 82.200) in Bangalore Rural and Ramanagara Districts in Karnataka under Bharatmala Pariyojna.
(b)Name of the Company / Organisation NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
(c)Registered Address 718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru,,Bangalore Urban,Karnataka-560070
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S P Somashekar
(b)Designation (Owner/ Partner/ CEO) Project Director
(c)Address Sy. no .13, 14th km, Nagasandra, Bengaluru - Tumkur Road (NH-4) , Bengaluru 560073,PIU Banglore,Bangalore North,Bangalore Urban,Karnataka-560073
(d)Pin code 560073
(e)E-mail piubngexpressway2022@gmail.com
(f)STD Code. 80(f)Telephone No. 26694383
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/MIS/75227/2018
(d)Master Proposal Number(Single Window) SW/252569/2022
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. attached separately
(b)Pincode 562159
(c)Bounded Latitudes (North)
From
Degree 12
Minutes 40
Second 10.25
From
Degree 13
Minutes 14
Second 56.80
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 18
Second 29.26
From
Degree 77
Minutes 19
Second 50.23
(e)Survey of India Topo Sheet No. 57G3,57G4, 57G7, 57G8, 57H1, 57H5, 57H6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1467
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBangalore RuralNelamangala
(2.)KarnatakaBangalore RuralNelamangalaObalapura, Manne, Kannohalli, Dasenahalli, Thattekere, Karimanne, Maddenahalli, Nijagal Kempohalli, Lakkuru, Agalakuppa, etc.
(3.)KarnatakaRamanagaraMagadiGoruru, Parvathapalya, Kannasandra, Beeravara, Gudemaranahalli, Uddandahalli, Harthi, Rangenahalli, Singripalya, etc.
(4.)KarnatakaRamanagaraMagadi
(5.)KarnatakaRamanagaraRamanagar
(6.)KarnatakaRamanagaraRamanagarKempavaderahalli, Lakshmipura, Melehalli, Bommachanahalli, Harisandra, Mayaganahalli, Madapura, Kethohalli, Balaguli, etc.
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-33/2018-IA.III
(c)Date of Apply of TOR 06 Jun 2018
(d)Date of Issue of TOR / Standard ToR 23 Jan 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :4
Basava Sri Shivashri Kalyana Mantapa Chanadanahodalli Village, Shivagange road, Bengaluru Rural District
State :Karnataka
District :Bangalore Rural
Tehsil :Nelamangala
Village :Kalyana Mantapa Chanadanahodalli village
50Land relatedOthersADC & ADM
(2.)
Date of Advertisement :01 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :3
National Highway Authority of India, Project Office premises, Basavanapura (Ramadevarapada), Ramanagara 562128
State :Karnataka
District :Ramanagara
Tehsil :Ramanagar
Village :Ramaagara
54Land Compensation, project configuration, C&D waste managementDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Highway Project Including Structures82.200Greenfield Highway
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)National Highway82.20KilometersRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4112
(b) Funds Allocated for Environment Management (Capital) (in Crores) 17.23
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 16.27
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.36
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 14423179
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 14423179
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Soil9781942OthersCumIdentified Borrow AreasRoad4 Open MarketCopy of Linkage
(2.)Cement229976OthersTonsIdentified nearest Cement FactoryRoad40 Open MarketCopy of Linkage
(3.)Steel50138OthersTonsIdentified Steel PlantsRoad20 Open MarketCopy of Linkage
(4.)Fly Ash778305OthersCumNearby Thermal Power StationRoad300 Open MarketCopy of Linkage
(5.)Aggregate2760907OthersCumIdentified QuarriesRoad30 Open MarketCopy of Linkage
(6.)Sand781870OthersCumIdentified Sand QuarriesRoad30 Open MarketCopy of Linkage
(7.)Bitumen40041OthersTonsNearby Approved SourceRoad40 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jun 2018 To 30 Jun 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube90.230.587.02100
(2.)SO2Micro Gram per Meter Cube9.36.58.7280
(3.)OthersCOMili Gram per Meter Cube1.050.060.914
(4.)NOxMicro Gram per Meter Cube28.813.524.2880
(5.)PM2.5Micro Gram per Meter Cube43.46.432.0860
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.157.436.58.5
(2.)TSSmg/l0000
(3.)Heavy MetalsArsenicmg/l000.010.05
(4.)Total Hardnessmg/l540160200600
(5.)Chloridesmg/l244.1729.772501000
(6.)Fluoridemg/l1.010.7111.5
(7.)TDSmg/l13104535002000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.24.8A
(2.)pHNA8.257.87C
(3.)BODmg/l8.26.0A
(4.)CODmg/l4832.0C
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))66.6353.3965
(2.)Leq(Night)A-weighted decibels(dB(A))59.4043.3455
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare242.56150.52
(2.)P(Phosphorus)Kilogram per hectare456.41151.22
(3.)K(Potassium)Kilogram per hectare89.6044.80
(4.)Electric ConductivityOthersµs/cm20963.4
(5.)pH6.705.57
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.24 To 3.26
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.47 To 42.05
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWater Tanker34360 Not Appliacble modeOthersWater TankerOthersWater Tanker0021 Jan 20223436
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA000Green Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste185Tons0RoadOthersComposting for Biodegradable & landfill for others
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube15.40.5021.63760
(2.)PM10Microgram per Meter Cube53.70.5015.271.9100
(3.)Others(Specify)COMicrogram per Meter Cube0.190.5026472647.192000
(4.)SO2Microgram per Meter Cube000080
(5.)NOxMicrogram per Meter Cube20.300.50370391.380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) .
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) .
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 619.294
(c)Government Land (ha.) 66.073
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 685.367
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 7089.76
(b)Waste/Barren Land (ha.) 11.64
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 48.24
(e)Settlements (ha.) 178.62
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation 952.24
    Total (ha.) 8280.5000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNational Highway Development685.367ROW Including Rest Area and green belt development
Total (ha.) 685.367
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsRamadevarabetta Vulture Sanctuary0.20
(2.)NPARamadevarabetta Vulture Sanctuary1.50
(3.)CorridorsNA00
(4.)WLSRamadevarabetta Vulture Sanctuary1.20
(5.)ESAsRamadevarabetta Vulture Sanctuary1.50
(6.)Critically Polluted AreaNA00
(7.)Wildlife CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000
(2.)Defence Installations000
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 22207
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 685.37
(b)Land yet to be acquired(Ha) 685.37
(c)Status of Land acquisition if not acquired under progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 61
(b)No. of Households 468
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 468
(e)Funds Allocated for R&R(in INR) (in Lacs) 203454.24
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Tiger, Leopard, Elephant, Gaur, Pangolin, Sloth bear
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2500000
(iii)Period of Implementation During Construction & Operation of the Project
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Arkavathi River and Ponds
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 1500
(d)Temporary Employment- During Operation 500
(e)No. of working days 730
(f)Total Manpower 2250
32.
Green Belt in Ha:
(a)Total Area of Green Belt 75.43
(b)Percentage of Total Project Area 11.01
(c)No. of Plants to be Planted 77011
(d)Funds Allocated for Plantation 149674455
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialgeneration of direct and indirect employment opportunities. The strong regional connectivity proposed through the Project will further increase regional trade and economic growth.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage .
(b)Capacity .
(c)No. of Recharge Pits 100
(d)Capacity .
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking .
5.
Energy Saving Measures:
(a)Source/Mode Solar Panels, LED etc.
(b)Percentage .
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Bridges have been proposed on all water bodies.For
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 82.200
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 18
(b)Total No. of ROB 3
(c)Total No. of Interchanges 6
(d)Total No. of Flyovers 10
(e)Total No. of Vehicle Underpass 32
(f)Total No. of Pedestrian Underpass 0
(g)Details of other utilities rail and road corridors 0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA0064 (Rev. 01)
(ii)Name of the EIA Consultant Louis Berger Consulting Pvt. Ltd.
(iii)Address Plot No.3, IFFCO Tower, 5th Floor, Sector-32, Gurugram, Haryana-122001
(iv)Mobile No. 9560678639
(v)Landline No. 00
(vi)Email Id Mohammad.Akhtar@wsp.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 04 Nov 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS P Somashekar
DesignationProject Director
Name of Company (Applicant Name should not be given here)NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
Address718, 11th Cross, 20th Main, Padmanabha Nagara, Bengaluru
Print