Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EC and CRZ validity extension of Multipurpose Terminal at Karanja creek Taluka Uran of Raigad district
(b)Name of the Company / Organisation KARANJA TERMINAL & LOGISTICS PVT LTD
(c)Registered Address A411, Hermis Atrium, 4th floor, CBD belapur, Navi Mumbai,,Thane,Maharashtra-400614
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sonal Gadhave
(b)Designation (Owner/ Partner/ CEO) VPEnvironment
(c)Address A411, Hermis Atrium, 4th floor, CBD Belapur, Navi Mumbai,,Thane,Thane,Maharashtra-400614
(d)Pin code 400614
(e)E-mail sonal.gadhave@mercpl.com
(f)STD Code. 22(f)Telephone No. 62233659
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/NCP/271050/2010
(d)Master Proposal Number(Single Window) SW/269814/2022
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No.
(b)Pincode
(c)Bounded Latitudes (North)
From
Degree
Minutes 51
Second 09
From
Degree
Minutes 51
Second 27
(d)Bounded Longitudes (East)
From
Degree
Minutes 50
Second 50
From
Degree
Minutes 51
Second 08
(e)Survey of India Topo Sheet No.
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL)
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area
(j)Seismic Zone
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadUranChanje
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 11-59/2010-IA.III
(b)Date of Apply of TOR 10 Sep 2010
(c)Date of Issue of TOR / Standard ToR 16 Jun 2011
(d)Date of Apply of EC 11 Sep 2012
(e)Date of Issue of EC 21 Aug 2013
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Already Public Hearing Carried Out. The previous Public Haering details attached.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By NIL
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on NIL
(iii)Letter No.
(iv)Status of Compliance
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 25 2025 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)5000000 TPA8080160.000Hectares(ha)Otherscombination of all three modes
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANANA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ?
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue NA
(iv)Valid Upto NA
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores)
(b) Funds Allocated for Environment Management (Capital) (in Crores)
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores)
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores)
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA00 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Mar 2011 To 02 May 2011
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube644755.580
(2.)OthersCOMicro Gram per Meter Cube1.20.70.882
(3.)PM2.5Micro Gram per Meter Cube45.63641.2160
(4.)SO2Micro Gram per Meter Cube312023.6280
(5.)PM10Micro Gram per Meter Cube685461.38100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.47.588.58.5
(2.)TDSmg/l280138.2500500
(3.)Chloridesmg/l10130.2250250
(4.)Total Hardnessmg/l17072.4300300
(5.)TSSNA0000
(6.)FluorideNA0000
(7.)Heavy MetalsNANA0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA00C
(2.)BODNA00C
(3.)pHNA00C
(4.)CODNA00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))433840.25
(2.)Leq(Day)A-weighted decibels(dB(A))544951.5
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)00
(2.)K(Potassium)00
(3.)Electric Conductivity00
(4.)pH00
(5.)N(Nitrogen)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWater Tanker0.238 Not Appliacble modeOthersWater TankerOthersNANA02 Nov 2020229.2
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste3040STP(40 CMD)OthersReuse for Green Belt area255
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 30
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 25
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste0.60Tons6.2RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube61.38185.5146.88100
(2.)PM2.5Microgram per Meter Cube41.21155.4496.6560
(3.)SO2Microgram per Meter Cube24.87165.4490.3180
(4.)NOxMicrogram per Meter Cube57168.45125.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set on project siteDiesel20.05OthersTPM,SO2-
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source MSEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 nos. of DG sets each of 500 KVA
(e)Stack Height (in m) 2.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 80
    Total Land (ha.) 80
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 80
(j)Others (ha.) : ITZ 0
    Total (ha.) 80.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant80
Total (ha.) 80
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0--
(2.)Critically Polluted AreaNA0--
(3.)WLSNA0--
(4.)NPANA0--
(5.)ESAsNA0--
(6.)ESZsNA0--
(7.)Wildlife CorridorsNA0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0--
(2.)Archaeological SitesNA0--
(3.)OthersNANA0--
(4.)Defence InstallationsNA0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction
(b)Permanent Employment-During Operation
(c)Temporary Employment- During Construction
(d)Temporary Employment- During Operation
(e)No. of working days
(f)Total Manpower
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.10.10.2
(2.)Percentage of Total Project Area0.10.10.2
(3.)No. of Plants9286178
(4.)Funds Allocated320004500077000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IB
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any
(d)Area of Mangroves Land (hectare)
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies No terrestrial ecosystem is involved at present in
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 20 Dec 2011
(iv)Period of Study To (EIA Terrestrial) 23 May 2012
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 31 Dec 1899
(iv)Period of Study to (EIA Marine) 31 Dec 1899
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps IRS
(ii)Please Specify with salient features Port
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IB
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? No
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? No
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? No
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared No
(f)NOC from State Pollution Control Boards Obtained No
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed ---
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) --
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 9
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 139.355
(e)Total built up area (sqm) 150
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 30
5.
Energy Saving Measures:
(a)Source/Mode Installation of LED Lights
(b)Percentage 0.01
(c)Quantity 30
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ?
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ?
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document?
(i)Accreditation No.
(ii)Name of the EIA Consultant
(iii)Address
(iv)Mobile No.
(v)Landline No.
(vi)Email Id
(vii)Category of Accreditation
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSonal Gadhave
DesignationVPEnvironment
Name of Company (Applicant Name should not be given here)KARANJA TERMINAL & LOGISTICS PVT LTD
AddressA411, Hermis Atrium, 4th floor, CBD belapur, Navi Mumbai
Print