1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | EC and CRZ validity extension of Multipurpose Terminal at Karanja creek Taluka Uran of Raigad district | (b)Name of the Company / Organisation | KARANJA TERMINAL & LOGISTICS PVT LTD | (c)Registered Address | A411, Hermis Atrium, 4th floor, CBD belapur, Navi Mumbai,,Thane,Maharashtra-400614 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sonal Gadhave | (b)Designation (Owner/ Partner/ CEO) | VPEnvironment | (c)Address | A411, Hermis Atrium, 4th floor, CBD Belapur, Navi Mumbai,,Thane,Thane,Maharashtra-400614 | (d)Pin code | 400614 | (e)E-mail | sonal.gadhave@mercpl.com | (f)STD Code. | 22(f)Telephone No. | 62233659 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/NCP/271050/2010 | (d)Master Proposal Number(Single Window) | SW/269814/2022 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Modernization |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | | (b)Pincode | | (c)Bounded Latitudes (North) | | From | | Degree | | Minutes | 51 | Second | 09 | From | | Degree | | Minutes | 51 | Second | 27 | (d)Bounded Longitudes (East) | | From | | Degree | | Minutes | 50 | Second | 50 | From | | Degree | | Minutes | 51 | Second | 08 | (e)Survey of India Topo Sheet No. | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | | (j)Seismic Zone | | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Raigad | Uran | Chanje | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 11-59/2010-IA.III | (b)Date of Apply of TOR | 10 Sep 2010 | (c)Date of Issue of TOR / Standard ToR | 16 Jun 2011 | (d)Date of Apply of EC | 11 Sep 2012 | (e)Date of Issue of EC | 21 Aug 2013 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Already Public Hearing Carried Out. The previous Public Haering details attached. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | NIL | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | NIL | (iii)Letter No. | | (iv)Status of Compliance | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 25 2025 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 5000000 TPA | 80 | 80 | 160.000 | Hectares(ha) | | Others | combination of all three modes | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | NA | NA | NA | NA | NA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | NA | (iv)Valid Upto | NA | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | | (b) Funds Allocated for Environment Management (Capital) (in Crores) | | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | NA | NA | Others | NA | 00 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Mar 2011 To 02 May 2011 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 64 | 47 | 55.5 | 80 | (2.) | Others | CO | Micro Gram per Meter Cube | 1.2 | 0.7 | 0.88 | 2 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 45.6 | 36 | 41.21 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 31 | 20 | 23.62 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 68 | 54 | 61.38 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.4 | 7.58 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 280 | 138.2 | 500 | 500 | (3.) | Chlorides | | | mg/l | | 101 | 30.2 | 250 | 250 | (4.) | Total Hardness | | | mg/l | | 170 | 72.4 | 300 | 300 | (5.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (6.) | Fluoride | | | NA | | 0 | 0 | 0 | 0 | (7.) | Heavy Metals | | NA | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | NA | | 0 | 0 | C | (2.) | BOD | | NA | | 0 | 0 | C | (3.) | pH | | NA | | 0 | 0 | C | (4.) | COD | | NA | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 43 | 38 | 40.25 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54 | 49 | 51.5 | |
14.5. No. of Soil Sample Monitored locations : 0 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | | | 0 | 0 | (2.) | K(Potassium) | | | 0 | 0 | (3.) | Electric Conductivity | | | 0 | 0 | (4.) | pH | | | 0 | 0 | (5.) | N(Nitrogen) | | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Water Tanker | 0.23 | 8 | Not Appliacble | modeOthers | Water Tanker | Others | NA | NA | 02 Nov 2020 | 229.2 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste | 30 | 40 | STP(40 CMD) | Others | Reuse for Green Belt area | 25 | 5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 30 | (b)Total Discharged Water (Kilolitre per Day) | 5 | (c)Total Reused Water (Kilolitre per Day) | 25 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 0.60 | Tons | 6.2 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 61.38 | 1 | 85.5 | 146.88 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 41.21 | 1 | 55.44 | 96.65 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 24.87 | 1 | 65.44 | 90.31 | 80 | (4.) | NOx | | Microgram per Meter Cube | 57 | 1 | 68.45 | 125.45 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set on project site | Diesel | 2 | 0.05 | Others | TPM,SO2 | - | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | MSEB | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 nos. of DG sets each of 500 KVA | (e)Stack Height (in m) | 2.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 80 | Total Land (ha.) | 80 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 80 | (j)Others (ha.) : ITZ | 0 | Total (ha.) | 80.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 80 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | -- | (2.) | Critically Polluted Area | NA | 0 | -- | (3.) | WLS | NA | 0 | -- | (4.) | NPA | NA | 0 | -- | (5.) | ESAs | NA | 0 | -- | (6.) | ESZs | NA | 0 | -- | (7.) | Wildlife Corridors | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | -- | (2.) | Archaeological Sites | | NA | 0 | -- | (3.) | Others | NA | NA | 0 | -- | (4.) | Defence Installations | | NA | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | | (b)Permanent Employment-During Operation | | (c)Temporary Employment- During Construction | | (d)Temporary Employment- During Operation | | (e)No. of working days | | (f)Total Manpower | | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.1 | 0.1 | 0.2 | (2.) | Percentage of Total Project Area | 0.1 | 0.1 | 0.2 | (3.) | No. of Plants | 92 | 86 | 178 | (4.) | Funds Allocated | 32000 | 45000 | 77000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IB | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | | (d)Area of Mangroves Land (hectare) | | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | No terrestrial ecosystem is involved at present in | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 20 Dec 2011 | (iv)Period of Study To (EIA Terrestrial) | 23 May 2012 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 31 Dec 1899 | (iv)Period of Study to (EIA Marine) | 31 Dec 1899 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | IRS | (ii)Please Specify with salient features | Port | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IB | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | No | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | No | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | No | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | No | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | --- | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | -- | |
|
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 9 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 139.355 | (e)Total built up area (sqm) | 150 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 30 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Installation of LED Lights | (b)Percentage | 0.01 | (c)Quantity | 30 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | | (i)Accreditation No. | | (ii)Name of the EIA Consultant | | (iii)Address | | (iv)Mobile No. | | (v)Landline No. | | (vi)Email Id | | (vii)Category of Accreditation | | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sonal Gadhave | Designation | VPEnvironment | Name of Company (Applicant Name should not be given here) | KARANJA TERMINAL & LOGISTICS PVT LTD | Address | A411, Hermis Atrium, 4th floor, CBD belapur, Navi Mumbai |
|