1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Molasses based Distillery from 30 to 105 KLPD for Ethanol production by using B / C Heavy Molasses/ Cane Syrup including Expansion of Cane Crushing from 4,500 to 7,500 TCD with Co-generation Plant from 15 to 22 MW by Vishwasrao Naik Sahakari Sakhar Karkhana Ltd. | (b)Name of the Company / Organisation | VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD | (c)Registered Address | Yashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli,,Sangli,Maharashtra-415408 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ramchandra Shivajirao Patil | (b)Designation (Owner/ Partner/ CEO) | ManagingDirector | (c)Address | Yashwantnagar,A/p.Chikhali,Tal.Shirala,Dist.Sangli,,Shirala,Sangli,Maharashtra-415408 | (d)Pin code | 415408 | (e)E-mail | rama.patil12@gmail.com | (f)STD Code. | 2345(f)Telephone No. | 272138 | (g)Fax No. | 231006 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | B2 | Reason for Applying at Ministry | Other | Other Reason for Applying at Ministry | As per Notification S.O. 980 (E) 02.03.2021 under EBP Program | (c)Proposal Number | IA/MH/IND2/260360/2022 | (d)Master Proposal Number(Single Window) | SW/260350/2022 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | R. S. No. 182, 224, 223, 175, 189, 183, 162 | (b)Pincode | 415408 | (c)Bounded Latitudes (North) | | From | | Degree | 16 | Minutes | 56 | Second | 11 | From | | Degree | 16 | Minutes | 56 | Second | 30 | (d)Bounded Longitudes (East) | | From | | Degree | 74 | Minutes | 4 | Second | 55 | From | | Degree | 74 | Minutes | 5 | Second | 21 | (e)Survey of India Topo Sheet No. | 47K4, 47L1, 47H13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 560 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Sangli | Shirala | Yashwantnagar Chikhali | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 5-34/2003/ENV 3319 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 23 2021 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sugar Factory | 4500 | 3000 | 7500.000 | Tons Crushed per Day(TCD) | | Road | | (2.) | Cogeneration Plant | 15 | 7 | 22.000 | Mega Watt(MW) | | Others | Grid | (3.) | Distillery | 30 | 75 | 105.000 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Ethanol (Sugarcane Syrup) | 0 | 3150 KL/M | 3150 KL/M | Sugarcane syrup Distillery | (2.) | Electricity | 15 MW/Hr | 7 MW/Hr | 22 MW/Hr | Expansion of Cogeneration Plant from 15 MW to 22 MW | (3.) | Sugar | 16,872 T/M | 10,128 T/M | 27,000 T/M | Expansion of Sugar Factory from 4500 TCD to 7500 TCD | (4.) | Ethanol (B & C Heavy Molasses) | 600 KL/M | 2550 KL/M | 3150 KL/M | Expansion of Molasses Distillery from 30 KLPD to 105 KLPD | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 03 Feb 2022 | (iv)Valid Upto | 22 Aug 2022 | (v)File No. | CR 2202000283 | (vi)Application No. | 0000119064 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 182 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 20.30 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.40 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.56 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 11670 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 11670 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Molasses (B/ C Heavy Molasses) | 11670 | Others | MT/M | Own sugar factory/outside purchase | Road | | 15 | Open Market | | Copy of Linkage | (2.) | Yeast | 8 | Others | MT/M | Local Vendors | Road | | 10 | Open Market | | Copy of Linkage | (3.) | Lime | 405 | Others | MT/M | Nearby Market | Road | | 10 | Open Market | | Copy of Linkage | (4.) | Sugarcane for Juice | 495000 | Others | MT/M | Own sugar factory/outside purchase | Road | | 30 | Open Market | | Copy of Linkage | (5.) | Urea | 120 | Others | MT/M | Local Vendors | Road | | 10 | Open Market | | Copy of Linkage | (6.) | De-Foaming Oil | 360 | Others | MT/M | Local Vendors | Road | | 10 | Open Market | | Copy of Linkage | (7.) | Sugarcane | 225000 | Others | MT/M | Near by Farms | Road | | 30 | Open Market | | Copy of Linkage | (8.) | Sulphur | 135 | Others | MT/M | Nearby Market | Road | | 10 | Open Market | | Copy of Linkage | (9.) | Lubricant | 32 | Others | MT/M | Nearby Market | Road | | 10 | Open Market | | Copy of Linkage | (10.) | Bagasse | 48600 | Others | MT/M | Own Sugar Factory | Conveyor Belt | | 1 | Captive | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.35 To 16.45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.2 To 11 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 119 | 5.55 | Copy of Permission Letter | Pipeline | | Barrage | | 4748/2021 | 30 Aug 2021 | 604 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Effluent-Sugar & Cogen | 577 | 600 | Treated in existing ETP having primary,secondary & tertiary treatment units | Green Belt Renewal Plant | | 577 | | (2.) | Domestic Effluent (Sugar, Cogen & Distillery)) | 26 | 30 | Treated in Proposed STP | Green Belt Renewal Plant,Others | Flushing & Gardening | 26 | 0 | (3.) | Raw Spentwash (Molasses distillery) | 840 | 1000 | Concentrated in MEE & dried in ATFD to form powder | Others | Powder given as manure | 840 | 0 | (4.) | Distillery Other Effluent | 935 | 1000 | Treated in Proposed CPU | Reuse within the Plant & Recycling | | 935 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2378 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2378 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Industrial Waste | | 187 | Tons | 0.5 | Road | | Others | Used as Manure | (2.) | Yeast Sludge | Industrial Waste | | 6270 | Tons | 0.5 | Road | | Others | Used as Manure | (3.) | CPU Sludge | Industrial Waste | | 308 | Tons | 0.5 | Road | | Others | Used as Manure | (4.) | Boiler Ash (Bagasse) | Bottom Ash | | 13200 | Tons | 0.5 | Road | | Others | To Brick/ cement manufacturing / as manure | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 31.1 | 2.28 | 1.91 | 33.01 | 80 | (2.) | NOx | | Microgram per Meter Cube | 37.4 | 2.27 | 1.11 | 38.51 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 69.8 | 2.26 | 0.31 | 70.11 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 28.3 | 2.29 | 0.07 | 28.37 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 80 TPH (Proposed Boiler) | Bagasse | 76 | 1.8 | PM10 | | 0 | (2.) | 80 TPH (Existing Boiler) | Bagasse | 76 | 1.8 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 9000 | (b)Source | Own 22 MW Cogeneration Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Sets of 700 & 300 KVA | (e)Stack Height (in m) | 2 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 52.52 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 52.52 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 11933.6 | (b)Waste/Barren Land (ha.) | 2516.96 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 580.93 | (e)Settlements (ha.) | 2124.08 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 4204 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow+Scrub | 10055.93 | Total (ha.) | 31415.5000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 22.40 | Existing Green Belt | (2.) | Built Up Area | | 6.44 | Existing + Expansion Built up Area | (3.) | Others | Road+Parking+Open Space | 23.68 | Road+Parking+Open Space | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | No | 0 | There is no presence of WLS in 10 Km radius of project | (2.) | NPA | No | 0 | There is no presence of NPA's in 10 Km radius of project | (3.) | ESZs | No | 0 | There is no presence of ESZs in 10 Km radius of project | (4.) | Wildlife Corridors | No | 0 | There is no presence of Wildlife Corridors in 10 Km radius of project | (5.) | ESAs | No | 0 | There is no presence of ESAs in 10 Km radius of project | (6.) | Critically Polluted Area | No | 0 | There is no presence of CPA's in 10 Km radius of project | (7.) | Corridors | No | 0 | There is no presence of Corridors in 10 Km radius of project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | No | 0 | There is no presence of forest land in 10 Km radius of project | (2.) | Archaeological Sites | | No | 0 | There is no presence of Archaeological sites in 10 Km radius of project | (3.) | Defence Installations | | No | 0 | There is no presence of defence installation in 10 Km radius of project | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 52.52 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Industry already owned the land | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | River Warana | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 2.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 45 | (c)Temporary Employment- During Construction | 25 | (d)Temporary Employment- During Operation | 25 | (e)No. of working days | 330 | (f)Total Manpower | 125 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 22.40 | 0 | 22.4 | (2.) | Percentage of Total Project Area | 42 | 0 | 42 | (3.) | No. of Plants | 7472 | 37328 | 44800 | (4.) | Funds Allocated | 30 | 70 | 100 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Implementation of Green Belt & Rain Water Harvesting system in Command Area | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0135 | (ii)Name of the EIA Consultant | Equinox Environments (India) Pvt. Ltd. | (iii)Address | F-11, Namdev Nest, 1160 B, E, Sykes Extension, Opposite Kamla College, Kolhapur 416001 | (iv)Mobile No. | 9857865122 | (v)Landline No. | 0231253123 | (vi)Email Id | projects@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 10 Apr 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Pl Submit:
1.Certified CTO compliance from RO, SPCB for sugar mill.
2.CCR mentions major non-compliance and partially compliance points. Please obtain Certified ATR from RO, MOEFCC for further consideration.
3. Also, submit clarification/justification against such major non-compliance and partially compliance points.
4. Legible copy of CTO of both distillery and sugar mill.
5. Complete translated version of surface water permission mentioning validity.
6. Correct self certified affidavit as per Notification dated 16th June, 2021. | 10 Mar 2022 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ramchandra Shivajirao Patil | Designation | ManagingDirector | Name of Company (Applicant Name should not be given here) | VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD | Address | Yashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli |
|