Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Molasses based Distillery from 30 to 105 KLPD for Ethanol production by using B / C Heavy Molasses/ Cane Syrup including Expansion of Cane Crushing from 4,500 to 7,500 TCD with Co-generation Plant from 15 to 22 MW by Vishwasrao Naik Sahakari Sakhar Karkhana Ltd.
(b)Name of the Company / Organisation VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD
(c)Registered Address Yashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli,,Sangli,Maharashtra-415408
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramchandra Shivajirao Patil
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Yashwantnagar,A/p.Chikhali,Tal.Shirala,Dist.Sangli,,Shirala,Sangli,Maharashtra-415408
(d)Pin code 415408
(e)E-mail rama.patil12@gmail.com
(f)STD Code. 2345(f)Telephone No. 272138
(g)Fax No. 231006
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category B2
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry As per Notification S.O. 980 (E) 02.03.2021 under EBP Program
(c)Proposal Number IA/MH/IND2/260360/2022
(d)Master Proposal Number(Single Window) SW/260350/2022
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. R. S. No. 182, 224, 223, 175, 189, 183, 162
(b)Pincode 415408
(c)Bounded Latitudes (North)
From
Degree 16
Minutes 56
Second 11
From
Degree 16
Minutes 56
Second 30
(d)Bounded Longitudes (East)
From
Degree 74
Minutes 4
Second 55
From
Degree 74
Minutes 5
Second 21
(e)Survey of India Topo Sheet No. 47K4, 47L1, 47H13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 560
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSangliShiralaYashwantnagar Chikhali
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 5-34/2003/ENV 3319
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 23 2021 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugar Factory450030007500.000Tons Crushed per Day(TCD)Road
(2.)Cogeneration Plant15722.000Mega Watt(MW)OthersGrid
(3.)Distillery3075105.000Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Ethanol (Sugarcane Syrup)03150 KL/M3150 KL/MSugarcane syrup Distillery
(2.)Electricity15 MW/Hr7 MW/Hr22 MW/HrExpansion of Cogeneration Plant from 15 MW to 22 MW
(3.)Sugar16,872 T/M10,128 T/M27,000 T/MExpansion of Sugar Factory from 4500 TCD to 7500 TCD
(4.)Ethanol (B & C Heavy Molasses)600 KL/M2550 KL/M3150 KL/MExpansion of Molasses Distillery from 30 KLPD to 105 KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Feb 2022
(iv)Valid Upto 22 Aug 2022
(v)File No. CR 2202000283
(vi)Application No. 0000119064
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 182
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20.30
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.40
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.56
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 11670
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 11670
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses (B/ C Heavy Molasses)11670OthersMT/MOwn sugar factory/outside purchaseRoad15 Open MarketCopy of Linkage
(2.)Yeast8OthersMT/MLocal VendorsRoad10 Open MarketCopy of Linkage
(3.)Lime405OthersMT/MNearby MarketRoad10 Open MarketCopy of Linkage
(4.)Sugarcane for Juice495000OthersMT/MOwn sugar factory/outside purchaseRoad30 Open MarketCopy of Linkage
(5.)Urea120OthersMT/MLocal VendorsRoad10 Open MarketCopy of Linkage
(6.)De-Foaming Oil360OthersMT/MLocal VendorsRoad10 Open MarketCopy of Linkage
(7.)Sugarcane225000OthersMT/MNear by FarmsRoad30 Open MarketCopy of Linkage
(8.)Sulphur135OthersMT/MNearby MarketRoad10 Open MarketCopy of Linkage
(9.)Lubricant32OthersMT/MNearby MarketRoad10 Open MarketCopy of Linkage
(10.)Bagasse48600OthersMT/MOwn Sugar FactoryConveyor Belt1 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.35 To 16.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.2 To 11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1195.55Copy of Permission LetterPipelineBarrage4748/202130 Aug 2021604
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Effluent-Sugar & Cogen577600Treated in existing ETP having primary,secondary & tertiary treatment unitsGreen Belt Renewal Plant577
(2.)Domestic Effluent (Sugar, Cogen & Distillery))2630Treated in Proposed STPGreen Belt Renewal Plant,OthersFlushing & Gardening260
(3.)Raw Spentwash (Molasses distillery)8401000Concentrated in MEE & dried in ATFD to form powderOthersPowder given as manure8400
(4.)Distillery Other Effluent9351000Treated in Proposed CPUReuse within the Plant & Recycling935
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2378
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2378
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste187Tons0.5RoadOthersUsed as Manure
(2.)Yeast SludgeIndustrial Waste6270Tons0.5RoadOthersUsed as Manure
(3.)CPU SludgeIndustrial Waste308Tons0.5RoadOthersUsed as Manure
(4.)Boiler Ash (Bagasse)Bottom Ash13200Tons0.5RoadOthersTo Brick/ cement manufacturing / as manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube31.12.281.9133.0180
(2.)NOxMicrogram per Meter Cube37.42.271.1138.5180
(3.)PM10Microgram per Meter Cube69.82.260.3170.11100
(4.)PM2.5Microgram per Meter Cube28.32.290.0728.3760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)80 TPH (Proposed Boiler)Bagasse761.8PM100
(2.)80 TPH (Existing Boiler)Bagasse761.8PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9000
(b)Source Own 22 MW Cogeneration Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Sets of 700 & 300 KVA
(e)Stack Height (in m) 2
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 52.52
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 52.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11933.6
(b)Waste/Barren Land (ha.) 2516.96
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 580.93
(e)Settlements (ha.) 2124.08
(f)Industrial (ha.) 0
(g)Forest (ha.) 4204
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow+Scrub 10055.93
    Total (ha.) 31415.5000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt22.40Existing Green Belt
(2.)Built Up Area6.44Existing + Expansion Built up Area
(3.)OthersRoad+Parking+Open Space23.68Road+Parking+Open Space
Total (ha.) 52.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo0There is no presence of WLS in 10 Km radius of project
(2.)NPANo0There is no presence of NPA's in 10 Km radius of project
(3.)ESZsNo0There is no presence of ESZs in 10 Km radius of project
(4.)Wildlife CorridorsNo0There is no presence of Wildlife Corridors in 10 Km radius of project
(5.)ESAsNo0There is no presence of ESAs in 10 Km radius of project
(6.)Critically Polluted AreaNo0There is no presence of CPA's in 10 Km radius of project
(7.)CorridorsNo0There is no presence of Corridors in 10 Km radius of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNo0There is no presence of forest land in 10 Km radius of project
(2.)Archaeological SitesNo0There is no presence of Archaeological sites in 10 Km radius of project
(3.)Defence InstallationsNo0There is no presence of defence installation in 10 Km radius of project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 52.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Industry already owned the land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Warana
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 45
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 25
(e)No. of working days 330
(f)Total Manpower 125
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt22.40022.4
(2.)Percentage of Total Project Area42042
(3.)No. of Plants74723732844800
(4.)Funds Allocated3070100
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImplementation of Green Belt & Rain Water Harvesting system in Command Area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0135
(ii)Name of the EIA Consultant Equinox Environments (India) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 B, E, Sykes Extension, Opposite Kamla College, Kolhapur 416001
(iv)Mobile No. 9857865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Apr 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPl Submit: 1.Certified CTO compliance from RO, SPCB for sugar mill. 2.CCR mentions major non-compliance and partially compliance points. Please obtain Certified ATR from RO, MOEFCC for further consideration. 3. Also, submit clarification/justification against such major non-compliance and partially compliance points. 4. Legible copy of CTO of both distillery and sugar mill. 5. Complete translated version of surface water permission mentioning validity. 6. Correct self certified affidavit as per Notification dated 16th June, 2021. 10 Mar 2022
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamchandra Shivajirao Patil
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD
AddressYashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli
Print