Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishment of new natural and synthetic surfactant chemical manufacturing unit Mouza Kulepairi, P.S. Bagnan, Dist-Howrah, West Bengal by M/s Detergeo Chem (EAST) Private Limited (DCEPL)
(b)Name of the Company / Organisation M/S DETERGEO CHEM (EAST) PRIVATE LIMITED (DCEPL)
(c)Registered Address A-29, Block B1 Ext., Mohan co-operative industrial Estate, New Delhi,,New Delhi,Delhi-110044
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Raman Arora
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address A-29, Block B1, Ext., Mohan co-operative industrial Estate, New Delhi,,Chanakya Puri,New Delhi,Delhi-110064
(d)Pin code 110064
(e)E-mail detergeo2020@gmail.com
(f)STD Code. 11(f)Telephone No. 40664444
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND3/256360/2020
(d)Master Proposal Number(Single Window) SW/256322/2022
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Dag No. 42, 44, 45, 46, 52, 53, 54, 55, 131, 132,
(b)Pincode 711303
(c)Bounded Latitudes (North)
From
Degree 22
Minutes 31
Second 50.466
From
Degree 22
Minutes 31
Second 50.993
(d)Bounded Longitudes (East)
From
Degree 87
Minutes 55
Second 52.718
From
Degree 87
Minutes 55
Second 52.695
(e)Survey of India Topo Sheet No. 73N/14, 73N/15, 79B/2 & 79B/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalHowrahBagnan - IKulepairi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/1/2020-IA-II(I)
(b)Date of Apply of TOR 03 Jan 2020
(c)Date of Issue of TOR / Standard ToR 10 Mar 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jul 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Aug 2021
Distance of Public Hearing Venue from the Proposed Project :3
Sri Krishna Bhawan, Bagnan, Mukunda Dighi Khalna More, PS- Bagnan, Howrah, West Bengal
State :West Bengal
District :Howrah
Tehsil :Bagnan - I
Village :Kulepairi
755OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Neutralization Unit5000 kg/hr1
(2.)Weigh Bridge100 MT1
(3.)Flaker1500 kg/hr1
(4.)Screw Chiller100 TR2
(5.)Reactors with Agitators15 KL4
(6.)Film Sulphonation/Sulphation Reactor5000 kg/hr1
(7.)Water Purification Plant10 kl/hr1
(8.)Waste Heat Recovery Boiler850 Kg/hr1
(9.)Electricity Generator1000KW1
(10.)PumpsAs Per Requirements
(11.)Water Hydrants SystemAs Per Requirements
(12.)LABSA 90% Seperator35 KL1
(13.)Nitrogen Generator200 Nm31
(14.)Sulfur Trioxide Gas Generation Plant1250 kg/hr1
(15.)Vent Gas Treatment System with ESP6000 CMPH1
(16.)Oil Based Boiler2000 kg/hr1
(17.)Air Drying Unit9000 CMPH1
(18.)Cooling Tower700 m3/hr (Total)3
(19.)LABSA 90% Batch Reactor35 KL1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Linear Alkyl Benzene Sulphonic Acid 90%12000OthersMTAOthersMS Tanker
(2.)Sodium Lauryl Sulphate6000OthersMTAOthersSS Tanker
(3.)Cocoamidopropyl Betaine3000OthersMTAOthersTruck
(4.)Ethylene Glycol Distearate3000OthersMTAOthersTruck
(5.)Sodium Sulphate400OthersMTAOthersTanker
(6.)Linear Alkyl Benzene Sulphonic Acid 96%12000OthersMTAOthersMS Tanker
(7.)Ethylene Glycol Monostearate3000OthersMTAOthersTruck
(8.)Sodium Lauryl Ether Sulphate24000OthersMTAOthersSS Tanker
(9.)Cocamide Monoethanolamide3000OthersMTAOthersTruck
(10.)Cocamide Diethanolamide3000OthersMTAOthersTruck
(11.)Dilute Sulphuric Acid12000OthersMTAOthersMS Tanker
(12.)Alpha Olefin Sulphonate1000OthersMTAOthersSS Tanker
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.51
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.19
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 67320
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 67320
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coconut Fatty Acid5028OthersMTAImportOthersISO Tank500 Open MarketCopy of Linkage
(2.)Monochloroacetic acid243OthersMTADomesticOthersTruck500 Open MarketCopy of Linkage
(3.)Sulphuric Acid (98%)12000OthersMTADomesticOthersMS Tanker50 Open MarketCopy of Linkage
(4.)Caustic Soda4052OthersMTADomesticOthersMS Tanker10 Open MarketCopy of Linkage
(5.)Stearic Acid5490OthersMTAImportOthersISO Tank500 Open MarketCopy of Linkage
(6.)Lauryl Alcohol3150OthersMTAImportOthersISO Tanks50 Open MarketCopy of Linkage
(7.)Alpha Olefin560OthersMTAImportOthersISO Tanks500 OthersOpen marketCopy of Linkage
(8.)Monoethanolamine732OthersMTADomesticOthersISO Tank50 Open MarketCopy of Linkage
(9.)Lauryl Ether13200OthersMTAImportOthersISO Tanks500 OthersOpen marketCopy of Linkage
(10.)Sulfur3487OthersMTADomestic/importOthersTruck10 Open MarketCopy of Linkage
(11.)Dimethylaminopropylamine264OthersMTAImportOthersISO Tank500 Open MarketCopy of Linkage
(12.)Ethylene Glycol870OthersMTADomesticOthersMS Tanker50 OthersOpen marketCopy of Linkage
(13.)Linear Alkaline Benzene (LAB)17215OthersMTAImportOthersMS Tanker500 Open MarketCopy of Linkage
(14.)Di Ethanolamine1029OthersMTADomesticOthersISO Tank50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube552754.0860
(2.)NOxMicro Gram per Meter Cube281227.0880
(3.)SO2Micro Gram per Meter Cube16415.5480
(4.)OthersCOMili Gram per Meter Cube0.970.580.9502
(5.)PM10Micro Gram per Meter Cube985296100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.716.736.58.5
(2.)TSSmg/l0000
(3.)Total Hardnessmg/l458224200600
(4.)Fluoridemg/l1.150.3311.5
(5.)TDSmg/l8384095002000
(6.)Chloridesmg/l2621112501000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.15.9A
(2.)CODmg/l16686A
(3.)pHNA7.486.80A
(4.)BODmg/l2816A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.437.870
(2.)Leq(Day)A-weighted decibels(dB(A))68.442.375
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Othersmg/100gm24.218.4
(2.)Electric ConductivityOthersmicro mhos/cm386246
(3.)K(Potassium)OthersMG/100gm2.90.9
(4.)pH7.917.18
(5.)P(Phosphorus)Othersmg/100gm0.960.76
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.4 To 18.69
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.39 To 14.75
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWater tanker/Ground water2035Copy of Permission LettermodeOtherswater tankerOthersbore well/water tanker12314 Feb 2022203
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling Tower Blowdown311ETPOthersReused for Scrubber and gardening purpose30
(2.)RO Reject411ETPOthersReused for Scrubber and gardening purpose40
(3.)Equipment Wash0.711ETPOthersReused for Scrubber and gardening purpose0.70
(4.)Boiler Blow down211ETPOthersReused for Scrubber and gardening purpose20
(5.)Softner Regeneration111ETPOthersReused for Scrubber and gardening purpose10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Industrial wasteOthersETP Sludge (Category 35.3)1.0Tons100RoadOthersGive to TSDF
(2.)Industrial WasteOthersSpent Oil(Category 5.1)0.02Kilolitre180RoadOthersSell to authorized oil reclamation plant
(3.)Industrial WasteOthersSulphur Ash1.0Tons140RoadOthersSell to fertilizer industry
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube000060
(2.)PM10Microgram per Meter Cube982.90.0098.00100
(3.)NOxMicrogram per Meter Cube282.80.0428.0480
(4.)SO2Microgram per Meter Cube1630.0016.0080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source West Bengal State Electricity Distribution Company
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 No. of DG sets each of capacity 910 KVA, 500 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.3260
    Total Land (ha.) 1.3260
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22796
(b)Waste/Barren Land (ha.) 406
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2523
(e)Settlements (ha.) 6970
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Vegetation 688
    Total (ha.) 33383.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.4358Production Shed, Tank Farm, DG Room, etc
(2.)Green belt0.6602Green Belt & Roads
(3.)OthersOthers(Future Projects)0.2300For future development
Total (ha.) 1.326
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None
(2.)Wildlife CorridorsNone0None
(3.)ESAsNone0None
(4.)NPANone0None
(5.)CorridorsNone0None
(6.)WLSNone0None
(7.)ESZsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0None
(2.)ForestNone0None
(3.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.33
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired None
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gaighata Khal
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 160
(d)Temporary Employment- During Operation 0
(e)No. of working days 245
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.46
(b)Percentage of Total Project Area 34.69
(c)No. of Plants to be Planted 690
(d)Funds Allocated for Plantation 1600000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt development have been proposed in 34.71% of plot area.
(2.)Social1. Total 200 people are expected to be employed directly and indirectly from this project. Out of which 40 will be permanent employee. 2. A provision of Rs. 3 lakhs has been made under Public Hearing Budget towards provision of scheme of Zero Liquid Discharge (ZLD) (1 lakhs) and for awareness and training programme for local employment (2 lakhs) based on the commitment made under Public hearing meeting held on 23.08.2021
(3.)FinancialThere will be economic development because of this project.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA0205
(ii)Name of the EIA Consultant Mantec Consultants Pvt Ltd Noida
(iii)Address D-36,Industrial Area, Udhyog Marg, E Block, Sector 6, Noida, U.P-201301
(iv)Mobile No. 9312284682
(v)Landline No. 0120421500
(vi)Email Id envmantec@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 20 Apr 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYour proposal has been examined and following are the deficiencies needs to be rectified and to be uploaded/submitted on Parivesh Portal: (i) In Form 2 at S.No.15(i), PP has not uploaded the CGWA application, however it is mentioned that the CGWA will be taken before the commencement of the Unit. Since the Unit is not in Industrial Estate, PP needs to apply first the CGWA application. It is also not clear that PP got TOR in March 2020 and still they had not applied for Water Approval. (ii) Details of land conversion document for industrial purpose needs to be uploaded on parivesh portal as the instant Unit is not in notified industrial area. (iii) Details of PH proceedings is not legible which were uploaded at S.No. 7.1 of Form 2. Please resubmit the same with legible copy alongwith all the documents. Also upload the Action Plan with budgetary provisions and time lines on the issues raised during PH. (iv) Details of onsite/offsite emergency plan/DMP and its approval needs to be submitted. PP in chapter 7, has submitted very generic DMP. Please revise accordingly. (v) Copy of undertaking w.r.t. not proposing any banned products, needs to be submitted. (vi) Details of court cases and SCN issued by the SPCB, if any, needs to be submitted. (vii) As per s.no. 39 of form 2, presentation is not uploaded as per template provided by the EAC. Please revise the same. (viii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted at S. No. 13.1 of Form 2. (ix) Membership of TSDF please upload on portal. (x) All old CTEs/CTOs/ HW Authorization to be uploaded to verify the violation, if any. The details of products need to be submitted in tabular form showing its details of CTO/EC vis-à-vis production capacity. (xi) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal by the EAC. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 21 Feb 2022
2. Eds Reply LetterLetter for relisting of the project has been uploaded. 07 Feb 2024
3.NAIt is noted that PP has not submitted the information desired on 21.02.2022. Please submit the same. As per OM dated 8.06.2022, PP should submit the latest baseline data for 3 months to be submitted. Accordingly, Please comply with the above observations. 21 Feb 2024
4. Eds Reply LetterThe EDS is attached with the EIA Report and uploaded as additional documents. 09 Mar 2024
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRaman Arora
DesignationOwner
Name of Company (Applicant Name should not be given here)M/S DETERGEO CHEM (EAST) PRIVATE LIMITED (DCEPL)
AddressA-29, Block B1 Ext., Mohan co-operative industrial Estate, New Delhi
Print