Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? Yes
Details of Project:
Type of Appraised Select
Details of Project:
Type of Violation Started the work onsite without prior EC under EIA notification,2006.
Details of Violation Operating the mines without EC since 2006.
Upload document of Damage Assessment Report
Upload document of Remediation Plan and Natural & Community augmentation plan
Upload TOR Letter(if issued earlier)
Upload EC Letter(if issued earlier)
Details of Project:
(a)Name of the project(s) Chettichavadi Jaghir Magnesite & Dunite Mines
(b)Name of the Company / Organisation DALMIA BHARAT SUGAR AND INDUSTRIES LTD.,
(c)Registered Address C/O Dalmia Magnesite Corporation,,Salem,Tamil Nadu-636012
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kalidass PG
(b)Designation (Owner/ Partner/ CEO) MinesManager
(c)Address C/O Dalmia Magnesite Corporation,,Salem,Salem,Tamil Nadu-636012
(d)Pin code 636012
(e)E-mail dalmiamagnesitemines@gmail.com
(f)STD Code. 427(f)Telephone No. 2346762
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/MIN/241375/2018
(d)Master Proposal Number(Single Window) SW/241372/2021
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 6
(b)Pincode 636012
(c)Bounded Latitudes (North)
From
Degree 11
Minutes 43
Second 09.71
From
Degree 11
Minutes 44
Second 36.233
(d)Bounded Longitudes (East)
From
Degree 78
Minutes 07
Second 23.268
From
Degree 78
Minutes 09
Second 13.068
(e)Survey of India Topo Sheet No. 58I/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 400
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 35
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduSalemSalemChettichavadi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of TOR NIL
(c)Date of Issue of TOR / Standard ToR NIL
(d)Previous TOR Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Aug 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :0.1
M/s. Dalmia Old Colony, Canteen Building
State :Tamil Nadu
District :Salem
Tehsil :Salem
Village :Chettichavadi
99Mr.Govindaraj, Chettichavadi Village Expressed support to operate the mine without any impact to the publicDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Jack Hammers R658-SL Atlas Copco-6 Nos
(2.)D155-A-1(Bull dozer )BEML 400 t/hr2
(3.)Water Tankers--2 Nos
(4.)Tractors60 HP @ 1300 RPM2 Nos
(5.)Atlas Copco XAH210 (Diesel Air Compr.)445 CFM 10.0 kg/m32 Nos
(6.)Motor Grader BEMLBEML1 No
(7.)Atlas Copco BVB 25 ( Wagon Drill )100-104 mm dia2 Nos
(8.)1420-FEL (Loader)BEML 2.0 m3 bucket1 No
(9.)BH 40 DumperBEML 36.20 t7
(10.)2071-FEL(Loader)HM 5.7 m3 bucket(boom ht 6.7 m)1 No
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Dunite140000OthersMT/annumRoad
(2.)Magnesite61000OthersMT/annumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 08 Nov 2012
(iv)Valid Upto 31 Mar 2013
(v)File No. 421
(vi)Application No. SLM0006/RL/DEE/TNPCB/SLM 2012
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 19.57
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.34
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.20
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel300000OtherslitersLocal petrol bunkRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 28 Feb 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube603959.44100
(2.)PM2.5Micro Gram per Meter Cube331932.8660
(3.)SO2Micro Gram per Meter Cube13412.8680
(4.)NOxMicro Gram per Meter Cube19818.7280
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)FluorideNA0000
(2.)pHNA9.487.436.58.5
(3.)Heavy MetalsIronmg/l0.120.050.30.3
(4.)Total Hardnessmg/l280190200600
(5.)Chloridesmg/l58222501000
(6.)TDSmg/l9063345002000
(7.)TSSNA0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODNA00E
(2.)pHNA00E
(3.)DONA00E
(4.)BODNA00E
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))41.834.1Residential - 45dB(A) Industrial - 70 dB(A)
(2.)Leq(Day)A-weighted decibels(dB(A))46.240.8Residential - 55dB(A) Industrial - 75dB(A)
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)00
(2.)K(Potassium)Percent123100
(3.)Electric ConductivityOthersMicromhos/cm16482
(4.)P(Phosphorus)00
(5.)pH8.647.46
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 47 To 49
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 45 To 47
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater700.1Copy of Permission LettermodeOthersWater TankerTube WellOT8/AG-2/176/NOC/Salem/202117 Nov 202170
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage11.2511.25SettlingOthersSeptic tank and Soak pit011.25
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 11.25
(b)Total Discharged Water (Kilolitre per Day) 11.25
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)LatrineMunicipal Solid Waste9Tons0.1RoadAuthorized Recyclers
(2.)RejectOthersMineral Reject1204000Tons0.5RoadOthersDumped
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube33003360
(2.)SO2Microgram per Meter Cube13001380
(3.)PM10Microgram per Meter Cube540.0525.579.5100
(4.)NOxMicrogram per Meter Cube19001980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NilNil00OthersNil0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 46
(b)Source TNEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 No - 35 KvA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 449.364
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 449.364
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining Lease area 449.364
    Total (ha.) 449.3640
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area366.89Magnesite and Dunite
(2.)OB Dump Area48.303
(3.)Built Up Area1.0
(4.)Green belt21.73
(5.)OthersOthers11.441
Total (ha.) 449.364
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil
(2.)ESAsNil0Nil
(3.)ESZsNil0Nil
(4.)Wildlife CorridorsNil0Nil
(5.)CorridorsNil0Nil
(6.)WLSNil0Nil
(7.)NPANil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNagaramalai R.F0.1The project does not involve forest land.
(2.)Archaeological SitesNil within 10km radius0Nil
(3.)Defence InstallationsNil within 10km radius0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vellakalpatti lake
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1.12
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 175
(e)No. of working days 300
(f)Total Manpower 225
32.
Green Belt in Ha:
(a)Total Area of Green Belt 104.03
(b)Percentage of Total Project Area 23.15
(c)No. of Plants to be Planted 10000
(d)Funds Allocated for Plantation 1350000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen belt development within the lease area.
(2.)SocialProviding direct and indirect employment to minimum of 2000 people in the nearest village.
(3.)FinancialGive a boost to economic development in the region.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)MagnesiteMajor
(2.)DuniteMajor
2.
Mine Capacity in ROM (Run of Mine) 1404662
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. TN/SLM/MG&DU/ROMP-1646.MDS
(b)Date of Approval 30 Mar 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 449.364
(f)Approved Capacity 201000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 43.18114
(b)Mineable Reserves (Million Ton) 43.18114
(c)Extractable Reserves(Million Ton) 43.18114
(d)Percent(%) of Extraction 14
(e)Grade of Coal /Ore /Mineral Refractory grade
(f)Stripping Ratio 1 : 19.56
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 100
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 449.364
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 11 Mar 1997
(iii)Validity of LOI 20
(iv)Reference No. of LOI G.O.Ms.No.74
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 531.72
(iii)Validity of the lease deed From : 20 Aug 1986 To : 19 Aug 2006
(iv)Date of Execution of Mining Lese 20 Aug 1986
(v)Reference Number G.O.Ms.No.74
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 11 Mar 1997 From : 20 Aug 1986 To : 19 Aug 2006 Copy of Earlier LeaseG.O.Ms.No.74 531.72 1st renewal lease order
(2.)Renewal 11 Jul 2005 From : 20 Aug 2006 To : 19 Aug 2026 Copy of Earlier LeaseSL.Go:55200(1) 449.364 second renewal application
(3.)Initial 01 Jan 1900 From : 25 Feb 1966 To : 24 Feb 1986 Copy of Earlier LeaseG.O Ms 903 574.89 Initial lease
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 9
(ii)Total Area (in Hectare) 48.303
(iii)Height (in meter) 30
(iv)Quantity (in Million Cubic meter) 34.225
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 366.89
(b)Depth (in meter) 40
(c)Volume (in Million Cubic meter) 146.756
12.
Details of Quarry:
(a)Final Void of 366.89 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 366.89
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper
(b)Surface to Siding/Loading Excavator
(c)Transportation / Conveyor Details Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND000
(3.)OTHERS(Specify)Mining lease area449.3640449.364
(4.)SETTLEMENTS000
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
(7.)WASTE LAND000
TOTAL449.3640449.364
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)GREEN BELT21.730021.73
(3.)EXCAVATION/QUARRY0366.890366.89
(4.)TOP SOIL STORAGE0.5000.5
(5.)VIRGIN AREA6.050006.05
(6.)INTERNAL OB DUMPS48.3030048.303
(7.)ROADS004.894.89
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL76.583366.894.890448.363
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 6
(h)Total afforestation plant (in hectare) 6
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court NGT
(c)Name of the Sub Court NGT Southern Zone
(d)Case No. 213 of 2021
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Court formed a committee to inspect and report abo
(f)Case Details A environmental activist filed a case against PP f
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Violation of EPA
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions case to be filed in regional court
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0103
(ii)Name of the EIA Consultant S.Suriyakumar
(iii)Address 3/216, K.S.V Nagar, Narasothipatti, Alagapuram Post, Salem -636004, Tamil Nadu.
(iv)Mobile No. 9842729655
(v)Landline No. 0427244429
(vi)Email Id suriyakumarsemban@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 10 Jan 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Our Proposal was appraised for grant of Environmental Clearance in the 28th EAC Meeting (Non-Coal Mining), held on 14.03.2024, Agenda Item No. 1.1. Hon’ble EAC deliberated on our proposal and it was deferred for want of additional information. With reference to the same we are hereunder submitting our responses along with Annexures for further consideration. We would therefore most humbly request your good selves to issue EC at the earliest time possible. Thanking You. Yours Faithfully, For Dalmia Bharat Sugar & Industries Ltd, P G Kalidass, Agent and Mines Manager 09 Apr 2024
2.NA

Deferred

22 Mar 2024
3. ADS Reply LetterDear Sir, Our subject Proposal cited under Ref.No-1 was appraised for grant of Environmental Clearance (Violation category) in the EAC (Non-Coal Mining) Meeting cited under Ref.No-2. Hon’ble EAC deliberated on our proposal and it was deferred for want of additional detail as mentioned hereinbelow. With reference to the same we are hereunder submitting the additional details desired by Hon’ble Committee for further consideration. The said demands were being contested by the company before Hon’ble High Court of Madras in W.A.834 of 2020 (w.r.t to Rs.11.44 Crore demand) and W.P.32057 of 2023 (w.r.t to Rs.7.24 Crore demand). In this context, we are herewith submitting order of the Honorable Madras High Court dated 15.02.2024 in respect of W.A.834 of 2020 (w.r.t to Rs.11.44 Crore demand) and W.P.32057 of 2023 (w.r.t to Rs.7.24 Crore demand) heard along with W.A.671 and batch.(Judgement Enclosed). Based on the above aforesaid demands which were earlier imposed without opportunity of hearing have now been quashed. The aforesaid demands have now been kept in abeyance till the concerned State authorities pass fresh orders for payment of such demands upon submission of reply by us. Further, we have already furnished our affidavit to pay the aforesaid demands once it is finally confirmed. We would therefore most humbly request your goodself to process our application for issuance of the Environmental Clearance as early as possible. Yours faithfully, For M/s. Dalmia Bharat Sugar and Industries Ltd. P.G. Kalidass (Authorized Signatory) 19 Feb 2024
4.NA

Deferred

29 Sep 2023
5. ADS Reply LetterDear Sir, Please find attached the Point wise reply of ADS along with all annexures as raised based on Minutes of 9th EAC Meeting (Non-Coal Mining), Meeting ID-IA/MIN/13425/17/01/2023 held on 17.01.2023, Agenda Item No. 1.3. Due to file size constraint, complete set of ADS reply with all annexures, Approved Mining Plan and Final EIA/EMP Report Vol-I & II has been provided in the downloadable link in the last page of the ADS Reply for your kind consideration. We kindly request your good self to process our application for issuance of the Environmental Clearance. Thanking you, For M/s. Dalmia Bharat Sugar and Industries Ltd. 01 Sep 2023
6.NA

Deferred

25 Jan 2023
7. ADS Reply LetterReply dt 21.12.2022 for ADS Query dated 22.11.2022. 21 Dec 2022
8.NASir, Please submit valid lease document as per condition of TOR. 22 Nov 2022
9. ADS Reply LetterReply dated 14.10.2022 for AD query dated 04.10.2022 14 Oct 2022
10.NAPl. comply the TOR and submit the valid mine lease document. 04 Oct 2022
11. ADS Reply LetterOur Reply dt 20.09.2022 to your ADS query dated 12.09.2022. 20 Sep 2022
12.NATheresponse of PP is not clear Pl. provide valid mine lease document for further consideration before EAC(non-coal) meeting. 12 Sep 2022
13. ADS Reply LetterReply to your ADS query dated 22.08.2022 wrt Chettichavadi Jaghir Magnesite & Dunite Mines of Dalmia Bharat Sugar & Ind Ltd, Salem, Tamilnadu. 31 Aug 2022
14.NAPl. provide valid lease document for further consideration before EAC(non-coal) meeting. 22 Aug 2022
15. ADS Reply LetterSubmission of ADS sought as per your correspondence dated 27.04.2022 and 12.05.2022, for your kind consideration for issue of EC. 20 May 2022
16.NAThe proposal for Amendment in Terms of Reference dated 05.02.2021 was considered in the 46th EAC meeting held during 15th to 17th February 2022. The official of DMG, Tamil Nadu also submitted that currently as per the documents, this mine lease is not valid and does not come under deemed extension of mine lease validity as the project proponent is not fulfilling the required conditions. The Committee was of the opinion to wait for the clear-cut decision of the Hon’ble court in the matter before considering the request of amendment of removal of specific condition (xviii) of ToR letter dated 05.02.2021 i.e. Valid mine lease documents from the State Department of mines needs to be submitted with EC application. The proposal to be consider after compliance of all TOR conditions. Pl. provide valid lease document for further consideration before EAC(non-coal) meeting. Thanks. 27 Apr 2022
17. ADS Reply LetterADS-Revised Damage Assessment and Remediation Plan as per observation and recommendation of 43rd EAC Meeting held on 15.12.2021 under item 43.2.1. 11 Mar 2022
18.NA

Deferred

24 Dec 2021
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKalidass PG
DesignationMinesManager
Name of Company (Applicant Name should not be given here)DALMIA BHARAT SUGAR AND INDUSTRIES LTD.,
AddressC/O Dalmia Magnesite Corporation
Print