Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Sponge Iron Plant from 1,00,000 to 4,50,000 TPA, Steel Melting Shop from 47,000 to 5,42,000 TPA, Rolling Mill from 72,000 to 4,02,000 TPA and Captive Power Plant from 10 to 34 MW
(b)Name of the Company / Organisation VRKP SPONGE AND POWER PLANT LLP
(c)Registered Address Sy. No. 229, 288 & 289, Halakundi village, Bellary Taluk and district, Karnataka-583102,,Bellary,Karnataka-583102
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prateek Agarwal
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Sy.No. 229, 288 and 289, Halakundi village, Bellary taluk and district, Karnataka,,Bellary,Bellary,Karnataka-583102
(d)Pin code 583102
(e)E-mail ea@vsp.vrkp.in
(f)STD Code. 40(f)Telephone No. 23717213
(g)Fax No. 22227106
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/KA/IND/116324/2017
(d)Master Proposal Number(Single Window) SW/191624/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 219, 229, 288, 289, 299, 304, 305, 307, 31
(b)Pincode 583102
(c)Bounded Latitudes (North)
From
Degree 15
Minutes 3
Second 89
From
Degree 15
Minutes 4
Second 76
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 51
Second 48
From
Degree 76
Minutes 52
Second 17
(e)Survey of India Topo Sheet No. 57 A/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBellaryHadagalliHalakundi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA: 31: IND: 2007
(b)Date of Apply of TOR 11 Oct 2017
(c)Date of Issue of TOR / Standard ToR 29 Nov 2017
(d)Date of Apply of EC 23 Aug 2016
(e)Date of Issue of EC 23 Dec 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0
Proposed Project Site
State :Karnataka
District :Bellary
Tehsil :Bellary
Village :Halakundi
190Total 69 participants have given their opinion about the proposed expansion project. Out of that 56 belongs to Halakundi village, 3 from Honnahalli village, 3 from Honnahalli Tanda, one from MincheriOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/SEIAA/143/KAR
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 20 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rolled Products/TMT Bars/Hot Strips/Coils72000330000402000.000Tons per Annum(TPA)Conveyor Belt
(2.)Hot Billets/Steel Billets47000495000542000.000Tons per Annum(TPA)Conveyor Belt
(3.)Electricity102434.000Mega Watt(MW)OthersTransmission
(4.)Sponge Iron90000350000440000.000Tons per Annum(TPA)Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Rolling Mill72,000 TPA3,30,000 TPA4,02,000 TPANil
(2.)Captive Power Plant10 MW (WHRB: 6 MW & AFBC: 4 MW)24 MW (WHRB)34 MW (WHRB: 30 MW & AFBC: 4 MWNil
(3.)DRI Plant90,000 TPA (3x100 TPD)3,50,000 TPA (3x350 TPD)4,40,000 TPA (3x100 TOD + 3x350 TPD)Nil
(4.)Induction Furnace with CCM47,000 TPA (1x12 T)4,95,000 TPA (3x40 T)5,42,000 TPA (1x12 T + 3x40 T)Nil
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Aug 2021
(iv)Valid Upto 30 Jun 2026
(v)File No. AWH-326208
(vi)Application No. 11769
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 570
(b) Funds Allocated for Environment Management (Capital) (in Crores) 45.72
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.85
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.55
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 660000
(b)Existing quantity of raw material/fuel 220000
(c)Total quantity of raw material/fuel 880000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron Ore700000Tons per AnnumNMDC Ltd. Donimalai, BMM Ispat Ltd. BellaryRoad100 Open MarketCopy of Linkage
(2.)LDO/LSHS8320OthersKLLocal MarketRoad100 Open MarketCopy of Linkage
(3.)Scrap70000Tons per Annum(Purchased from Local Area + in-house)Road100 Open MarketCopy of Linkage
(4.)Iron ore pellets490000Tons per AnnumNMDC Ltd. Donimalai, BMM Ispat Ltd. BellaryRoad100 Open MarketCopy of Linkage
(5.)Dolomite17500Tons per AnnumLocal MarketRoad100 Open MarketCopy of Linkage
(6.)Indian Coal455000Tons per AnnumOpen MarketRoad300 Open MarketCopy of Linkage
(7.)Sponge Iron70250Tons per AnnumNearby plants in BellaryRoad100 Open MarketCopy of Linkage
(8.)Pig Iron50000Tons per AnnumLocal MarketRoad100 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube42.922.942.860
(2.)OthersCOMicro Gram per Meter Cube102851410252000
(3.)PM10Micro Gram per Meter Cube75.340.675.1100
(4.)SO2Micro Gram per Meter Cube28.912.428.980
(5.)NOxMicro Gram per Meter Cube25.612.825.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.227.286.58.5
(2.)Total Hardnessmg/l458279300600
(3.)TSSmg/l0.720.31.01.5
(4.)TDSmg/l8895865002000
(5.)Chloridesmg/l4583222501000
(6.)Fluoridemg/l1.20.851.01.5
(7.)Heavy MetalsIronmg/l0.250.110.31.0
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.13.9A
(2.)BODmg/l3.32.6A
(3.)CODmg/l16.510.4A
(4.)pHNA7.77.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.535.470
(2.)Leq(Day)A-weighted decibels(dB(A))70.646.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.947.22
(2.)K(Potassium)Kilogram per hectare391229
(3.)P(Phosphorus)Kilogram per hectare3914
(4.)N(Nitrogen)Kilogram per hectare414115
(5.)Electric ConductivityOthersµS/cm459219
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.68 To 32.51
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.27 To 34.56
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1552.54.8Copy of Permission LetterPipelineIntake WellKGWA/GW/NOC/13/2020-21/246708 Dec 20201552.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)D.M. plant regeneration water6666ETPOthers66660
(2.)Sanitary Wastewater2222ETPOthersSTP220
(3.)Induction Furnace1919ETPOthersDUST SUPPRESSION190
(4.)Rolling Mill2727ETPOthersfor Ash handling270
(5.)Cooling Tower blowdown151151ETPOthersfor Greenbelt development1510
(6.)Boilers blowdown192192ETPOthersfor Dust Suppression1920
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 477
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 477
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mill scales from Rolling MillIndustrial Waste6600Tons100Roadgiven to nearby Sinter Plants / Ferro Alloy units.Othersgiven to nearby Sinter Plants / Ferro Alloy units.
(2.)End cuttings from Rolling millIndustrial Waste9900Tons0OthersReused In SMSOthersReused In SMS
(3.)Ash from DRIIndustrial Waste63000Tons0OthersOwn Brick Making Plant.OthersOwn brick making plant
(4.)DolocharIndustrial Waste70000Tons0Othersused in AFBC power plantOthersused in AFBC power plant
(5.)Kiln Accretion SlagIndustrial Waste3150Tons0OthersOwn Brick Making Unit.OthersOwn brick making plant
(6.)SMS SlagIndustrial Waste49500Tons0OthersOwn Brick Making Plant.OthersOwn brick making plant
(7.)Wet Scraper SludgeIndustrial Waste16100Tons0OthersOwn Brick Making Plant.OthersOwn brick making plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube42.91.30.9243.8260
(2.)SO2Microgram per Meter Cube28.92.07.3736.2780
(3.)Others(Specify)COMicrogram per Meter Cube10281.43.561031.562000
(4.)PM10Microgram per Meter Cube75.31.31.5476.84100
(5.)NOxMicrogram per Meter Cube25.61.410.2335.8380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DRI kiln with WHRB (1 x 350 TPD)Coal722.5OthersPM, SO2, NOx.1.45 g/s, 63.2 g/s, 9.6 g/s
(2.)Induction Furnace (3x 40 T)Electricity452.1OthersPM, NOx.1.2 g/s, 8.2 g/s
(3.)DRI kiln with WHRB (2 x 350 TPD)Coal882.5OthersPM, SO2, NOx.1.45 g/s, 63.2 g/s, 9.6 g/s.
(4.)Re-heating furnace attached to 1000 TPDLDO581.7OthersPM, SO2, NOx.0.7 g/s, 30.6 g/s, 4.5 g/s.
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 61500
(b)Source Captive Power Plant & State grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 88.15
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 53.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17992.2
(b)Waste/Barren Land (ha.) 3768
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1538.6
(e)Settlements (ha.) 2072.4
(f)Industrial (ha.) 1224.6
(g)Forest (ha.) 4207.6
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining area 596.6
    Total (ha.) 31400.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt29.38
(2.)Main Plant55.94Storage area, Internal Roads, parking area others
(3.)Water Reservoir2.83Water Reservoir & RWH
Total (ha.) 88.15
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10 Km radius
(2.)ESAsNil0Nil within 10 Km radius
(3.)Wildlife CorridorsNil0Nil within 10 Km radius
(4.)CorridorsNil0Nil within 10 Km radius
(5.)WLSNil0Nil within 10 Km radius
(6.)ESZsNil0Nil within 10 Km radius
(7.)NPANil0Nil within 10 Km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBellary RF0.6Nil
(2.)Archaeological SitesBellary Fort9.0Nil
(3.)Defence InstallationsNil0Nil within 10 Km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 88.15
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tungabhadra High level canal
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 40
(b)Permanent Employment-During Operation 791
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 333
(f)Total Manpower 831
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt029.3829.38
(2.)Percentage of Total Project Area03333
(3.)No. of Plants142556000074255
(4.)Funds Allocated01.21.2
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEnvironmental: Greenbelt development Social: Employment, Infrastructural facilities Financial: Generation of income to the Government in the form of taxes; income generation to stake holders
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1922/ SA 0148
(ii)Name of the EIA Consultant M/s. Pioneer Enviro Laboratories & Consultants Pri
(iii)Address Plot No. B15 & 16, Industrial Estate, Sanath Nagar, Hyderabad - 500 018, Telangana
(iv)Mobile No. 9440677333
(v)Landline No. 0402311427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 21 Sep 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: • Column no.6 in Form II regarding existing EC details shall be furnished. • RO certified report is of June, 2018 which is more than a year old. Recent RO report shall be submitted. • Water source is mentioned as municipal wastewater. Relevant permission copy from the Competent Authority shall be furnished. 13 Sep 2019
2.NAThe correction have been made as per the instruction received 13 Mar 2020
3.NAProposal is returned due to the following: Form 2: • In s.no. 9, certified compliance report is of June 2018 which more than one year old. Fresh report from RO is required. EIA report: • In the declaration part by the consultant, it is mentioned that period of involvement of the consultant for the preparation of report is mentioned as 10 days to 2 months only which may please be explained by the PP and the consultant. . Water withdrawal permission may please be submitted. 27 Mar 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrateek Agarwal
DesignationPartner
Name of Company (Applicant Name should not be given here)VRKP SPONGE AND POWER PLANT LLP
AddressSy. No. 229, 288 & 289, Halakundi village, Bellary Taluk and district, Karnataka-583102
Print