Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion-cum-modernization of Bokaro Steel Plant from 4.5 MTPA hot metal to 5.77 MTPA hot metal at Bokaro Steel City, Jharkhand
(b)Name of the Company / Organisation SAIL/BOKARO STEEL PLANT
(c)Registered Address ENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT,ENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT,Bokaro,Mizoram-827001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Navin Prakash Srivastava
(b)Designation (Owner/ Partner/ CEO) DY. GENERAL MANAGER
(c)Address ENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT,ENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT,,Bokaro,Mizoram-827001
(d)Pin code 827001
(e)E-mail kspp1955@rediffmail.com
(f)STD Code. 6542(f)Telephone No. 246605
(g)Fax No. 242099
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/IND/6949/2008
(d)Master Proposal Number(Single Window) SW/98087/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 49
(b)Pincode 827001
(c)Bounded Latitudes (North)
From
Degree 23.6459
Minutes
Second
From
Degree 23.7174
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.0671
Minutes
Second
From
Degree 86.1439
Minutes
Second
(e)Survey of India Topo Sheet No. F45C1, F45C2, F45B13, F45B14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 243
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandBokaroChasBokaro Steel City
(2.)OrissaSundargarhHemgirGopalpur (Telendih), Ratansara
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/99/2007-IA.II(I)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 29 Jul 2008
(c)Date of Issue of EC 16 Oct 2008
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :4.3
Bokaro Steel City
State :Jharkhand
District :Bokaro
Tehsil :Chas
Village :Bokaro Steel City
130Repair & maintenance of handpumps, reopening of schools, development of roads, plantation in villages, plastic pollution control, promotion of solar energy etc.OthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-211/08/EPE/3026
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 10 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hot Metal450000012700005770000Tons per Annum(TPA)OthersIn-Plant Transfer
(2.)Crude Steel42000004560004656000Tons per Annum(TPA)Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Hot Rolled Coil Finishing (HRCF) complexHR shearing+slitting+HR packaging Lines0HR shearing+slitting+HR packaging LinesNo Change
(2.)Blast Furnace4 x 2000 m3 + 1 x 2586 m3 = 5.77 MTPA04 x 2000 m3 + 1 x 2586 m3 = 5.77 MTPANo Change
(3.)Coke Oven8 (6W+2S) 5 m tall X69 Ovens = 3.442 MTPA0.77 MTPA4.212 MTPAAddition
(4.)Hot Strip Mill4x260t RHF+Tandem Mill+HRC conveying= 4.5 MTPA04x260t RHF+Tandem Mill+HRC conveying= 4.5 MTPANo Change
(5.)Raw Water Supply SystemTenu Canal from Damodar RiverAlternate water pipeline systemTenu Canal along with alternate water pipelineAddiiton
(6.)Refractory Materials Plant3X270 + 1X270 t/d Dolomite Kilns=0.2449 MTPANew Kiln of 450 TPD (0.1642 MTPA)0.4091 MTPAAddition
(7.)Cold Rolling Mills1.2 MTPA CRM I&II + 1.2 MTPA CRM-III)Debottlenecking of existing CRMs to 2.86 MTPA2.86 MTPAModernization
(8.)Slabbing Mill7 working soaking pit batteries07 working soaking pit batteriesNo Change
(9.)Sinter Plant2 x 252 m2 + 312 m2 sintering m/c = 5 MTPAAddition of new Sinter Plant of 3.7 MTPA8.7 MTPAAddition
(10.)Pellet Plant0Installation of new 2.0 MTPA pellet plant2.0 MTPANew
(11.)Oxygen Plant4 x 450 TPD + 1 x 550 TPD ASU + 1250 TPD O2 (BOO)Addition of 1 x 1250 TPD O2 Plant (BOO)3950 TPDAddition
(12.)Steel Melting ShopsSMS1=1.5, SMS2=3.3, Tot=4.8 MTPASMS1=1.306, SMS2=3.35, Total=4.656MTPASMS1=1.306, SMS2=3.35, Total=4.656MTPAModernization
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Jun 2016
(iv)Valid Upto 31 Dec 2019
(v)File No. JSPCB/HO/RNC/CT0-63953/2016/98
(vi)Application No. Application dated 21-11-2015
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5219.1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 365
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 17.22
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 91.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 689847
(b)Existing quantity of raw material/fuel 16911300
(c)Total quantity of raw material/fuel 17601147
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Non coking coal for PCI577000Tons per AnnumImportedRail350 LinkageCopy of Linkage
(2.)Limestone312260Tons per AnnumCaptive minesRail1600 CaptiveCopy of Linkage
(3.)Iron Ore fines10785290Tons per AnnumCaptive minesRail250 CaptiveCopy of Linkage
(4.)Dolomite363870Tons per AnnumCaptive/Purchased from BhutanRoad,Rail300 OthersCaptive/Purchased from BhutanCopy of Linkage
(5.)Iron ore lump (BF grade)956300Tons per AnnumCaptive minesRail250 CaptiveCopy of Linkage
(6.)Coking coal4582667Tons per AnnumBCCL & imported from Australia, via Haldia portRail350 MoUCopy of Linkage
(7.)Bentonite23760Tons per AnnumPurchased from Kachch region in GujaratRoad1500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube39.57.732.380
(2.)PM2.5Micro Gram per Meter Cube59275760
(3.)NOxMicro Gram per Meter Cube62.822.555.680
(4.)PM10Micro Gram per Meter Cube994998100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.578.58.5
(2.)Total Hardnessmg/l464108200600
(3.)Fluoridemg/l1.370.2611.5
(4.)TSSNA0000
(5.)Heavy MetalsIronmg/l0.4880.0511
(6.)TDSmg/l7482245002000
(7.)Chloridesmg/l202392501000
(8.)OthersManganesemg/l0.0590.010.10.3
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l31C
(2.)CODNA00A
(3.)pHNA7.87.3A
(4.)DOmg/l6.65.2A
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.840.565
(2.)Leq(Night)A-weighted decibels(dB(A))48.337.855
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare502213
(2.)P(Phosphorus)Kilogram per hectare11.51.1
(3.)Electric ConductivityMillisiemens per Centimetre0.610.042
(4.)K(Potassium)Kilogram per hectare54990
(5.)pH6.96.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.54 To 11
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.2 To 8.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4080005Copy of Permission LettermodeOthersCanal and Pipeline(Alternate)OthersDam & Intake well for pipelineTDC/SAIL/RAGT - I/113/09-1023 Mar 2010555373
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Steel plant process3600036000ZLD systems with Primary and secendary treatment systemsReuse within the Plant & Recycling36000
(2.)Steel plant process1680016800Primary & secondary treatmentDischarge into Surface Water Body16800
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 52800
(b)Total Discharged Water (Kilolitre per Day) 16800
(c)Total Reused Water (Kilolitre per Day) 36000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BOF SlagIndustrial Waste512159Tons0RailOthers80% in sinter plant rest for bricks with fly ash
(2.)Ferric OxideIndustrial Waste7557Tons0RoadOthers100% sold as scrap
(3.)Coke BreezeIndustrial Waste459784Tons0Conveyor BeltOthers100% will be reused in sinter plant
(4.)BF sludgeIndustrial Waste28850Tons500RoadOthersSold in secondary market
(5.)BF SlagIndustrial Waste2192750Tons0RailOthers100% utilization in cement plants
(6.)Mill scaleIndustrial Waste85645Tons0RoadOthers100% utilization in Sinter plant
(7.)BF flue dustIndustrial Waste64643Tons0RailOthers100% utilization in Sinter plant
(8.)BOF sludgeIndustrial Waste37248Tons500RoadOthersSold in secondary market
(9.)Waste refractoryIndustrial Waste8151Tons0RoadOthers100% utilization in refractory/mortar production
(10.)ESP (RMP) dustIndustrial Waste18972Tons0RoadOthers100% utilization in Sinter plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube478.30.447.4160
(2.)NOxMicrogram per Meter Cube458.31.246.2180
(3.)PM10Microgram per Meter Cube885.8.888.81100
(4.)SO2Microgram per Meter Cube214.33.224.2180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)COB9Mixed Gas1203OthersPM,SO2,NOx3.6,7.2,7.2 g/s
(2.)BF3 StoveMixed Gas703.5OthersPM,SO2,NOx1.1,2.7,0.8 g/s
(3.)SP2 DedustingDedusting805OthersPM16.7 g/s
(4.)BF1 Stock HouseDedusting508.2OthersPM7.7 g/s
(5.)RMP7Mixed Gas511.2OthersPM,SO2,NOx0.6,4.7,3.2 g/s
(6.)BF5 StoveMixed Gas703.5OthersPM,SO2,NOx1.0,2.8,1.2 g/s
(7.)HSM RHF 1&2Mixed Gas1207.2OthersPM,SO2,NOx4.4,39.3,13.1 g/s
(8.)BF4 StoveMixed Gas703.5OthersPM,SO2,NOx1.1,3.1,1.3 g/s
(9.)SMS2 LF1Mixed Gas801.25OthersPM0.9 g/s
(10.)SMS2 LF1Mixed Gas801.25OthersPM1.0 g/s
(11.)BF1 StoveMixed Gas703.5OthersPM,SO2,NOx1.1,2.9,1.2 g/s
(12.)Pellet ProcessMixed Gas553OthersPM,SO2,NOx3.9,7.8,7.8 g/s
(13.)BF2 StoveMixed Gas703.5OthersPM,SO2,NOx1.0,3.2,1.4 g/s
(14.)BF2 & BF3 Stock HouseDedusting508.2OthersPM7.6 g/s
(15.)SMS1Mixed Gas1004.3OthersPM,SO2,NOx10.9,13.6,9.2 g/s
(16.)BF4&BF5 Stock HouseDedusting508.2OthersPM7.8 g/s
(17.)HSM RHF3&4Mixed Gas1207.2OthersPM,SO2,NOx4.8,38.4,12.8 g/s
(18.)Pellet DedustingDedusting351.5OthersPM1.3 g/s
(19.)SP2 ProcessMixed Gas, Coke Breeze1007OthersPM,SO2,NOx25,100,50 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 256300
(b)Source BPSCL Captive power plant and balance from DVC
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Purchase from DVC
(e)Stack Height (in m) 180
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 6973.68
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 6973.68
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 38299
(b)Waste/Barren Land (ha.) 867
(c)Grazing/ Community Land (ha.) 2018
(d)Surface Water Bodies (ha.) 2621
(e)Settlements (ha.) 5221.32
(f)Industrial (ha.) 6973.68
(g)Forest (ha.) 1738
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open Land 1712
    Total (ha.) 59450
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3489.53
(2.)Area for Solid Waste Management360.17
(3.)Green belt1923.99
(4.)Water Reservoir1199.99Cooling ponds
Total (ha.) 6973.68
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None
(2.)ESAsNone0None
(3.)ESZsNone0None
(4.)CorridorsNone0None
(5.)Critically Polluted AreaNil0Nil
(6.)Wildlife CorridorsNone0None
(7.)WLSNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPF near Narra and along Damodar river5Degraded forest
(2.)Defence InstallationsNone0None
(3.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 785
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 785
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1923.99141.642065.63
(2.)No. of Plants45731502150004788150
(3.)Funds Allocated0186.75186.75
(4.)Percentage of Total Project Area33.320.3533.67
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImplementation of Zero Liquid Discharge scheme, Revamping of Existing ESPs and Installation of high efficiency ESPs in new units, Implementation of latest state of the art technologies pollution reduction and energy conservation.
(2.)SocialEmployment generation and expenditure of CER budget towards development and improvement of social infrastructure in the area.
(3.)FinancialRevenue generation for Central and state exchequer. Reduction in import of Automative grade steel.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0068
(ii)Name of the EIA Consultant MECON Limited
(iii)Address Vivekanand Path, Doranda, Ranchi, Jharkhand - 834002
(iv)Mobile No. 9470193793
(v)Landline No. 0651248324
(vi)Email Id envenggranchi@meconlimited.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 02 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Closure report of non-compliances from Regional Office shall be furnished. 2. Authenticated English translation of the Public Consultation proceedings shall be furnished. 3. HIRA is not project specific and inadequate and it has not covered all the hazards associated with the facilities and activities. Accordingly, DMP shall be incorporated with the on-site emergency response systems. 4. Socioeconomic study including need based assessment shall be furnished. CER table may be re-worked out and basis for CER shall be evolved. 16 Apr 2019
2.NAThe correction have been made as per the instruction received 15 May 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAThe proposal cited above was considered during the 7th meeting of Reconstituted Expert Appraisal Committee [REAC] (Industry-I) held on 29-31st May, 2019. As per the minutes of the meeting, the committee observed that the project proponent had not clearly presented the salient aspects of the implementation status of the existing EC, associated conditions thereof and status of compliance of the conditions. The Committee further noted the mismatch between plant configuration and contents of the ToRs. Moreover, ToRs points have not been adequately addressed in the EIA/EMP report. The project proponent requested for more time to address the lacunae in the present proposal, and sought additional time to review and revise its proposal. In view of the aforesaid, and after detailed deliberations, the Committee recommended to return the proposal in its present form to the project proponent to enable them review and revise the same. In view of the above, it is requested to apply through PARIVESH as per the EAC recommendations. 17 Aug 2020
2. ADS Reply LetterThe point-wise replies to the ADS is submitted for kind consideration of the Hon'ble MoEFCC. 17 Aug 2020
3.NAThe proposal cited above was considered during the 7th meeting of Reconstituted Expert Appraisal Committee [REAC] (Industry-I) held on 29-31st May, 2019. As per the minutes of the meeting, the committee observed that the project proponent had not clearly presented the salient aspects of the implementation status of the existing EC, associated conditions thereof and status of compliance of the conditions. The Committee further noted the mismatch between plant configuration and contents of the ToRs. Moreover, ToRs points have not been adequately addressed in the EIA/EMP report. The project proponent requested for more time to address the lacunae in the present proposal, and sought additional time to review and revise its proposal. In view of the aforesaid, and after detailed deliberations, the Committee recommended to return the proposal in its present form to the project proponent to enable them review and revise the same. In view of the above, it is requested to apply as per the EAC recommendations. 17 Aug 2020
4.NAThe proposal cited above was considered during the 7th meeting of Reconstituted Expert Appraisal Committee [REAC] (Industry-I) held on 29-31st May, 2019. As per the minutes of the meeting, the committee observed that the project proponent had not clearly presented the salient aspects of the implementation status of the existing EC, associated conditions thereof and status of compliance of the conditions. The Committee further noted the mismatch between plant configuration and contents of the ToRs. Moreover, ToRs points have not been adequately addressed in the EIA/EMP report. The project proponent requested for more time to address the lacunae in the present proposal, and sought additional time to review and revise its proposal. In view of the aforesaid, and after detailed deliberations, the Committee recommended to return the proposal in its present form to the project proponent to enable them review and revise the same. In view of the above, it is requested to apply as per the EAC recommendations. 17 Aug 2020
5.NAThe proposal cited above was considered during the 7th meeting of Reconstituted Expert Appraisal Committee [REAC] (Industry-I) held on 29-31st May, 2019. As per the minutes of the meeting, the committee observed that the project proponent had not clearly presented the salient aspects of the implementation status of the existing EC, associated conditions thereof and status of compliance of the conditions. The Committee further noted the mismatch between plant configuration and contents of the ToRs. Moreover, ToRs points have not been adequately addressed in the EIA/EMP report. The project proponent requested for more time to address the lacunae in the present proposal, and sought additional time to review and revise its proposal. In view of the aforesaid, and after detailed deliberations, the Committee recommended to return the proposal in its present form to the project proponent to enable them review and revise the same. In view of the above, it is requested to apply as per the EAC recommendations. 17 Aug 2020
6. ADS Reply LetterPoint-wise reply to Observations of EAC raised during 7th REAC(Ind-1) meeting of 31.05.2019. 13 Aug 2020
7.NAKindly furnish the addition information sought by the EAC. 18 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNavin Prakash Srivastava
DesignationDY. GENERAL MANAGER
Name of Company (Applicant Name should not be given here)SAIL/BOKARO STEEL PLANT
AddressENVIRONMENT CONTROL DEPARTMENT,BOKARO STEEL PLANT