Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Setting up of a Greenfield Integrated Steel Plant for production of capacity 13.2 MTPA Crude Steel with 10 MTPA Cement grinding unit and 900 MW Captive Power Plant near Paradeep
(b)Name of the Company / Organisation JSW UTKAL STEEL LIMITED
(c)Registered Address JSW Utkal Steel Limited Plot No. 3, Forest Park, Bhubaneshwar, Odisha,,Khordha,Orissa-751009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shankarpratap Singh
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address JSW Utkal Steel Limited, Plot No. 3, Forest Park, Bhubaneshwar,,Saheednagar,Khordha,Orissa-751009
(d)Pin code 751009
(e)E-mail mm@jsw.in
(f)STD Code. 674(f)Telephone No. 2596117
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/OR/IND/74396/2018
(d)Master Proposal Number(Single Window) SW/234584/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Please see Appendix 1-1 of Common EIA report
(b)Pincode 754141
(c)Bounded Latitudes (North)
From
Degree 20
Minutes 11
Second 58
From
Degree 20
Minutes 14
Second 08
(d)Bounded Longitudes (East)
From
Degree 86
Minutes 30
Second 53
From
Degree 86
Minutes 35
Second 38
(e)Survey of India Topo Sheet No. 73L/12, F45U12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 13
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJagatsinghapurErsama-
(2.)OrissaJagatsinghapurErsama-
(3.)OrissaJagatsinghapurErsama
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/524/2017-IA-II(I)
(b)Date of Apply of TOR 13 Aug 2018
(c)Date of Issue of TOR / Standard ToR 19 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0.8
Badadanda, in front of Jagannath temple
State :Orissa
District :Jagatsinghapur
Tehsil :Ersama
Village :Gadkujanga
732Environmental Issues like air,water pollution and ground water contamination.Demand for employment.Demand for setting up hospital.Demand for establishment of skill development centre. etcOthersDist Magistrate & Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Dolo Calcining Plant1 x 600 TPD-
(2.)Cold Rolling Mill2 x 2.3 MTPAPLTCM, CAL, CGL, CCL
(3.)Air Separation Plant (BOOT)6 x 2100 TPD-
(4.)Tar Processing Plant (BOOT)300000 TPA-
(5.)Lime Calcining Plant6 x 600 TPD-
(6.)Lime Calcining Plant6 x 600 TPD-
(7.)Cement Plant (BOOT)10 MTPAGrinding and mixing of slag fly ash and clinker
(8.)Hot strip mill2 x 5.5 MTPATinplate coil and Si steel - 2 x 0.25 MTPA each
(9.)Air Separation Plant (BOOT)6 x 2100 TPD-
(10.)Pellet Plant4 x 8.0 MTPA, 32 MTPAWith 180 TPH grinding unit
(11.)DRI Plant1.2 MTPACOG Gas based
(12.)Wire Rod Mill1 x 0.6 MTPA-
(13.)Sinter Plant1 x 500 sq m, 5.775 MTPAWith sinter cooler waste heat recovery system
(14.)LF3 x 350 t + 2 x 180 t-
(15.)Caster shopSlab - 3 x 2, billet - 1 x 8, Billet/bloom - 1 x 613.2 MTPA
(16.)Caster shopSlab - 3 x 2, billet - 1 x 8, Billet/bloom - 1 x 613.2 MTPA
(17.)BOF3 x 350 t + 2 x 180 t13.49 MTPA
(18.)Plate Mill1.5 MTPA-
(19.)Captive Power Plant (BOOT)3 x 300 MWBy product gas and coal based
(20.)Slurry Dewatering system30.0 MTPAThickener, Filtration with water recovery system
(21.)Benzol refining Plant (BOOT)100000 TPA-
(22.)Coke Ovens6 MTPA, 8 x 62 ovenStamp charged with CDQ
(23.)Coke Ovens6 MTPA, 8 x 62 ovenStamp charged with CDQ
(24.)RH3 x 350 t + 1 x 180 t-
(25.)DRI Plant1.2 MTPACOG Gas based
(26.)Hot strip mill2 x 5.5 MTPATinplate coil and Si steel - 2 x 0.25 MTPA each
(27.)Medium Section Mill1.0 MTPA-
(28.)Rebar Mill1 x 1.2 MTPA-
(29.)Blast Furnace3 x 5350 cu m, 13.5 MTPA-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Long Products2800000Tons per AnnumRoad,Rail,OthersSea
(2.)Hot Rolled Coils3630000Tons per AnnumRoad,Rail,OthersSea
(3.)DRI380000Tons per AnnumRoad,Rail
(4.)Benzol Refining products100000Tons per AnnumRoad,Rail
(5.)Pellet14810000Tons per AnnumOthersSea
(6.)Cement10000000Tons per AnnumRoad,Rail,OthersSea
(7.)Silicon Steel500000Tons per AnnumRoad,Rail,OthersSea
(8.)Tinplate450000Tons per AnnumRoad,Rail,OthersSea
(9.)Tar distillation products300000Tons per AnnumRoad,Rail
(10.)Cold Rolled Products3980000Tons per AnnumRoad,Rail,OthersSea
(11.)Plates1180000Tons per AnnumRoad,Rail,OthersSea
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 65000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2856
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 196.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 200
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 62529700
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 62529700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)PCI2700000Tons per AnnumImport - Australia/South Africa/IndonesiaOtherssea0 Open MarketCopy of Linkage
(2.)Anthracite coal192000Tons per AnnumImport - South Africa/Vietnam/IndonesiaOtherssea0 Open MarketCopy of Linkage
(3.)GYPSUM232000Tons per AnnumRajasthan, GujaratRoad,Rail1900 Open MarketCopy of Linkage
(4.)Dolomite2350100Tons per AnnumImport - Australia Domestic - OdishaRoad,Rail,Otherssea350 Open MarketCopy of Linkage
(5.)Bentonite320000Tons per AnnumImport - Russia/International marketOtherssea0 Open MarketCopy of Linkage
(6.)Limestone4934500Tons per AnnumKarnataka, OmanRoad,Rail,Otherssea1600 Open MarketCopy of Linkage
(7.)Quartzite270000Tons per AnnumRajasthan, BrazilRoad,Rail,Otherssea1900 CaptiveCopy of Linkage
(8.)Iron Ore fines4695300Tons per AnnumJoda Barbil Koira regionRail330 LinkageCopy of Linkage
(9.)Clinker5116000Tons per AnnumImport - Mozambique/Australia/CanadaOtherssea0 Open MarketCopy of Linkage
(10.)Coke/Steam coal2700000Tons per AnnumMahanadi Coal FieldsRoad,Rail,Otherssea450 Open MarketCopy of Linkage
(11.)Iron ore lump1187900Tons per AnnumJoda Barbil Koira regionRoad,Rail330 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2019 To 29 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube43.823.842.260
(2.)SO2Micro Gram per Meter Cube23.8421.580
(3.)PM10Micro Gram per Meter Cube92.556.589.6100
(4.)NOxMicro Gram per Meter Cube457.842.580
(5.)OthersCOMili Gram per Meter Cube0.680.10.632
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l27608355002000
(2.)OthersArsenicmg/l0.010.010.010.05
(3.)Fluoridemg/l0.30.111.5
(4.)Chloridesmg/l835.163.52501000
(5.)Heavy MetalsChromiummg/l0.050.050.050.05
(6.)Total Hardnessmg/l1120124200600
(7.)TSSmg/l101000
(8.)pHNA7.16.56.58.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.16.7D
(2.)DOmg/l5.63.25D
(3.)OthersCr6+mg/l0.10.1D
(4.)BODmg/l57.55.0D
(5.)CODmg/l288.839.0D
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))7552.865
(2.)Leq(Night)A-weighted decibels(dB(A))67.242.255
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersds/m3.81.8
(2.)pH7.27.1
(3.)K(Potassium)Milligram per Kilogram950720
(4.)N(Nitrogen)Milligram per Kilogram890680
(5.)P(Phosphorus)Milligram per Kilogram685410
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface22320084.22Copy of Permission LetterPipelineIntake WellWS-IWS-236/2021 2580630 Sep 2021244168
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Slurry dewatering3600036000Discharge with interim periodDischarge into Seawater Body36000
(2.)Captive power plant31200000Temperature to be controlledDischarge into Seawater Body3120000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3156000
(b)Total Discharged Water (Kilolitre per Day) 3156000
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly AshFly Ash940000Tons0Road,Pipe ConveyorOthersused in cement plant
(2.)Steelmaking slagIndustrial Waste2095000Tons70RoadOthersused for construction after metal recovery
(3.)ZLD SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)11000Tons120RoadAuthorized Recyclers
(4.)Bottom AshBottom Ash240000Tons70RoadOthersSale for making pavement block
(5.)Mill scale & sludgeIndustrial Waste150000Tons0RoadOthersused in sinter plant
(6.)Zinc DrossHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30000Tons500RoadAuthorized Recyclers
(7.)BF SlagIndustrial Waste4050000Tons0RoadOthersused in cement plant
(8.)Chrome SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)80Tons500RoadAuthorized Recyclers
(9.)Flue dustIndustrial Waste300000Tons0RoadOthersused in sinter plant
(10.)Used and waste oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1500Tons500RoadAuthorized Recyclers
(11.)Decanter tank and tar storage tank sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)800Tons0RoadOthersreused in coke ovens
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube52.06.23.555.560
(2.)NOxMicrogram per Meter Cube44.36.28.953.280
(3.)PM10Microgram per Meter Cube906.27.797.7100
(4.)SO2Microgram per Meter Cube21.56.26.628.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BF2#2SHNA703.0PM102.05
(2.)BF3#1SHNA706.0PM1010.89
(3.)MSM-RHF#1By-product gas76.53.0PM100.75
(4.)MSM-RHF#1By-product gas76.53.0SO25
(5.)TinL#1By-product gas653NOx1.67
(6.)COB#3COG1404.5SO227.78
(7.)COB#3COG1404.5NOx11.11
(8.)COB#1CDQNA252.4PM101.11
(9.)COB#1DENA252.5PM101.67
(10.)COB#3DENA252.5PM101.67
(11.)PLP3#1DENA553.0PM102.5
(12.)PLP4#2DENA553.0PM102.5
(13.)SP#WGCoke breeze1204.8NOx23.61
(14.)BF#1STOVEBy-product gas805.0NOx33.125
(15.)PLP2#2DENA553.0PM102.5
(16.)BF3#1STOVEBy-product gas805.0SO214.72
(17.)CPP#1Coal1003.5PM108.33
(18.)CPP#1Coal1003.5SO227.78
(19.)COB#4COG1404.5PM102.78
(20.)COB#2CDQNA252.4PM101.11
(21.)PLP2#1DENA553.0PM102.5
(22.)PLP1#WASTE GASBy-product gas1206.0PM1015
(23.)BF1#1CH2NA703.5PM104.44
(24.)BF3#1STOVEBy-product gas805.0PM102.94
(25.)Lime Kiln#4NA551.6PM101.125
(26.)COB#4COG1404.5SO227.78
(27.)COB#4COG1404.5NOx11.11
(28.)SP#WGCoke breeze1204.8PM102.36
(29.)BF3#1STOVEBy-product gas805.0NOx14.72
(30.)SMS1#Primary1(Flare)By-product gas802.2PM102.17
(31.)SMS1#SENA999.6PM1027.33
(32.)SMS2#Primary 2 (Flare)By-product gas801.9PM101.48
(33.)HSM-RHF#2By-product gas703.1SO28.33
(34.)CRM-CGL#1By-product gas653.0NOx2.78
(35.)CPP#2Coal1003.5NOx27.78
(36.)PPC#1By-product gas603.5PM105.83
(37.)PLP1#WASTE GASBy-product gas1206.0NOx50
(38.)BF1#2SGPNA303.0PM101.11
(39.)COB#2DENA252.5PM101.67
(40.)BF3#1SHNA706.0PM1010.89
(41.)BF3#1CH1NA703.5PM104.44
(42.)DR#FlueCOG604.2PM100.69
(43.)COB#1COG1404.5SO227.78
(44.)COB#2COG1404.5NOx11.11
(45.)BF3#2SGPNA303.0PM101.11
(46.)BF1#1CH1NA703.5PM104.44
(47.)Lime Kiln#3NA551.6PM101.125
(48.)PLP1#1DENA553.0PM102.5
(49.)BF2#1STOVEBy-product gas805.0PM102.94
(50.)BF3#2SHNA703.0PM102.05
(51.)DR#ScreenNA301.5PM100.05
(52.)Lime Kiln#6NA551.6PM101.125
(53.)SMS1#Primary 3 (Flare)By-product gas802.2PM102.17
(54.)WRM-RHF#1By-product gas703.1SO24.44
(55.)CPP#2Coal1003.5SO227.78
(56.)PSC#1By-product gas604.0PM107.5
(57.)PSC#2By-product gas604.0PM107.5
(58.)PSC#3By-product gas604.0PM107.5
(59.)PSC#4By-product gas604.0PM107.5
(60.)SP#WGCoke breeze1204.8SO223.61
(61.)DR#FlueCOG604.2SO20.69
(62.)DR#Day binNA301.5PM100.05
(63.)Lime Kiln#1NA551.6PM101.125
(64.)WRM-RHF#1By-product gas703.1PM100.67
(65.)WRM-RHF#1By-product gas703.1NOx4.44
(66.)CPP#2Coal1003.5PM108.33
(67.)CPP#3Coal1003.5SO227.78
(68.)COB#1COG1404.5NOx11.11
(69.)COB#2COG1404.5SO227.78
(70.)PLP4#1DENA553.0PM102.5
(71.)COB#4DENA252.5PM101.67
(72.)COB#4CDQNA252.4PM101.11
(73.)BF1#1SHNA705.0PM1010.89
(74.)BF2#1SGPNA303.0PM101.11
(75.)SMS2#Primary 1 (Flare)By-product gas801.9PM101.48
(76.)SMS2#Primary 3 (Flare)By-product gas801.9PM101.48
(77.)SMS2#SENA806.8PM1013.86
(78.)HSM-RHF#1By-product gas703.1SO28.33
(79.)HSM-RHF#1By-product gas703.1NOx8.33
(80.)CRM-CGL#2By-product gas653.0NOx2.78
(81.)CPP#3Coal1003.5NOx27.78
(82.)COB#1COG1404.5PM102.78
(83.)BF2#1CH2NA703.5PM104.44
(84.)Lime Kiln#2NA551.6PM101.125
(85.)SMS1#Primary 2 (Flare)By-product gas802.2PM102.17
(86.)HSM-RHF#2By-product gas703.1PM101.25
(87.)PLP3#2DENA553.0PM102.5
(88.)BF3#1SGPNA303.0PM101.11
(89.)BF#1STOVEBy-product gas805.0SO233.125
(90.)HSM-RHF#3By-product gas703.1SO28.33
(91.)PM-RHF#1By-product gas703.0SO26.11
(92.)CRM-CAL#1By-product gas653.0NOx5.55
(93.)CPP#1Coal1003.5NOx27.78
(94.)COB#3CDQNA252.4PM101.11
(95.)BF2#1STOVEBy-product gas805.0NOx14.72
(96.)BF2#1CH1NA703.5PM104.44
(97.)BF3#1CH2NA703.5PM104.44
(98.)DR#FlueCOG604.2NOx6.94
(99.)Dolo Kiln#1NA551.6PM101.125
(100.)PLP1#2DENA553.0PM102.5
(101.)BF2#1SHNA706.0PM1010.89
(102.)BF2#2SGPNA303.0PM101.11
(103.)BF3#2SHNA703.0SO22.05
(104.)BF3#1CH1NA703.5PM104.44
(105.)HSM-RHF#2By-product gas703.1NOx8.33
(106.)PM-RHF#1By-product gas703.0NOx6.11
(107.)COB#2COG1404.5PM102.78
(108.)COB#3COG1404.5PM102.78
(109.)PLP1#WASTE GASBy-product gas1206.0SO225
(110.)BF#1STOVEBy-product gas805.0PM102.94
(111.)Lime Kiln#5NA551.6PM101.125
(112.)SP#1DECoke breeze403.5PM108.89
(113.)BF1#2SHNA705.0PM102.05
(114.)HSM-RHF#1By-product gas703.1PM101.25
(115.)HSM-RHF#3By-product gas703.1NOx8.33
(116.)PM-RHF#1By-product gas703.0PM100.92
(117.)RBM-RHF#1By-product gas653.3SO24.72
(118.)CRM-CGL#1By-product gas653.0PM100.42
(119.)CRM-CGL#2By-product gas653.0PM100.42
(120.)CPP#3Coal1003.5PM108.33
(121.)PPC#2By-product gas603.5PM105.83
(122.)BF1#1SGPNA303.0PM101.11
(123.)BF2#1STOVEBy-product gas805.0SO214.72
(124.)DR#PrdtNA301.0PM100.24
(125.)HSM-RHF#3By-product gas703.1PM101.25
(126.)RBM-RHF#1By-product gas653.3PM100.71
(127.)RBM-RHF#1By-product gas653.3NOx4.72
(128.)MSM-RHF#1By-product gas76.53.0SO25
(129.)CRM-CAL#1By-product gas653.0PM100.83
(130.)TinL#1By-product gas653.0PM100.25
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1230000
(b)Source Captive (1121000 kVA) and Grid (109000 kVA)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 5
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1069.581
(b)Private Land (ha.) 0
(c)Government Land (ha.) 55.703
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1125.284
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13631
(b)Waste/Barren Land (ha.) 3291
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2519
(e)Settlements (ha.) 3140
(f)Industrial (ha.) 1395
(g)Forest (ha.) 655
(h)Mangroves (ha.) 1909
(i)Marine Area (ha.) 17222
(j)Others (ha.) : Fisheries 1704
    Total (ha.) 45466.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant701.284Including storage areas
(2.)Green belt37233% greenbelt
(3.)Area for Solid Waste Management0.25TSDF
(4.)Water Reservoir18.75-
(5.)OthersRail, road &CRZ32CRZ IA-Sand dunes
Total (ha.) 1124.284
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)ESZsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)Archaeological SitesNA0NA
(3.)ForestJatadhar PF1Protected Forest
(4.)OthersProtected ForestRamtara PF4.5Protected Forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Under Process(Stage-II)
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 130000
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1125.28
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Full acquisition by IDCO
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 6
(b)No. of Households 142
(c)No. of PDFs (Project Displaced Families) 142
(d)No. of PAFs (Project Affected Families) 142
(e)Funds Allocated for R&R(in INR) (in Lacs) 9000
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Jatadhar Mohan river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bay of Bengal(sea), Mahanadi, Jatadhar Mohan etc.(perennial river)
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 3000
(b)Permanent Employment-During Operation 12000
(c)Temporary Employment- During Construction 12000
(d)Temporary Employment- During Operation 45000
(e)No. of working days 330
(f)Total Manpower 72000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 371.34
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 930000
(d)Funds Allocated for Plantation 250000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEnvironmental Improvement in ecology and air quality of the region by initiatives such as water sprinkling on roads and social forestry. Increase in biodiversity through plantation programs.
(2.)SocialGeneration of local employment. Strengthening of social infrastructure such as healthcare, education and physical infrastructure such as roads, water supply under socio-economic EMP. Provision of vocational training for better livelihood.
(3.)FinancialDirect and indirect revenue for State and Center in the form of various taxes and duties. Boost in the local economy through generation of income and appreciation of land prices.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1828/RA 0131
(ii)Name of the EIA Consultant M N Dastur & Co (P) Ltd.
(iii)Address P-17 Mission Row Extension; Kolkata-700013
(iv)Mobile No. 9433341156
(v)Landline No. 0332225050
(vi)Email Id sandip.m@dastur.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 29 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYour proposal is returned due to the lack of following: On perusal of the application, it is noted that incomplete application has been uploaded by PP and the consultant. • On perusal of the KML file, it is noted that PP has encroached upon the coastal area too for the purpose of setting up of ISP. PP may kindly clarify the factual status and demarcate the area for ISP and jetty project with different color codes. Form 2 • In s.no.3, all the applicable schedule under EIA 2006 shall be mentioned. • In s.no. 7.1 of Form 2, In s.no. 7.1, entire PH proceedings inter-alia including advertisements given for PH, SPCB cover letter, actual proceedings, attendance sheet, written representations & the response submitted, Authenticated English translation of the PH proceedings if any, shall be uploaded. • In s.no. 9, several observations have been made by RO with respect to the compliance to the existing EC conditions. Action taken from PP (or) formal closure report from IRO shall be submitted. • In s.no.15, in-principle letter obtained during 2018 for water withdrawal has been uploaded. Final copy of the water withdrawal permission shall be uploaded. • In s.no. 24, Forest clearance obtained by the PP shall be uploaded. • In s.no. 25, tree cutting permission issued by the competent authority shall be uploaded. • In s.no.27, present status of R&R shall be submitted. • Ins.no. 32, proper green belt diagram covering 33% plant area shall be uploaded. • In s.no.34, CRZ details of the jetty project is missing. EIA report • Cover page should contain name of both the EIA consultants for ISP and Jetty project. • Project specific Risk assessment has not been carried out. • Issues raised by EAC and EIA report are mixed with each other and there is no clarity on the same. • The presentation uploaded is not accessible at all. • Annexures to the report is not legible at all. In addition to the above, note on the interlinked project and the status of EC for the said project shall be elaborated. 30 Nov 2021
2. Eds Reply LetterForm 2 has been updated as per EDS points where applicable. Other changes have been made in the uploaded documents. Few documents have been uploaded in Google Drive and link shared with MoEFCC due to size constraints. 22 Dec 2021
3.NAYour application is again returned due to the repeated failure of the uploading of documents by the consultant and proponent 1. Points raised in the EDS have not been reflected in the Form 2. Uploaded revised kml file depicts that water body area is going to be encroached upon by the ISP. The said kml is not in consonance to the layout uploaded as well as page 13 of 39 of uploaded EIA report. 3. With respect to PH proceedings, it has been stated that google drive containing PH proceedings have been emailed to the member secretary. Such reply is highly inappropriate. Parivesh is a public domain platform wherein the all the documents have to be invariably uploaded on the relevant sections for ensuring wide transparency. 4. under s.no.34, crz project details can be uploaded. 23 Dec 2021
4. Eds Reply LetterReplies to EDS raised on 23.12.21 and 30.11.21 uploaded 31 Dec 2021
5.NAOn perusal of the application, following shortcomings have been again noticed in the common EIA report. 1. OCZMA recommendations shall be submitted along with the common EIA report. Further, statutory documents as per the CRZ notification, 2019 shall also be uploaded. 2. HTL/LTL map does not contain scale and details of the authorized agency carried out the task. As per the said map, there is water body under CRZ IV B has been proposed as a green belt in the plant layout? PP may kindly clarify that water body under CRZ IVB can be utilized for green belt? Such activity is permissible under CRZ, 2019 notification. PP may please clarify. 3. Kindly indicate list of the industrial activities proposed by the PP in the CRZ area vis-a-vis with the permissible provisions of CRZ, 2019 notification. Also indicate the distance proposed to be maintained between plant boundary and HTL line explicitly on the CRZ map. 06 Jan 2022
6. Eds Reply LetterReplies to EDS dated 06.01.2022 regarding CRZ details have been uploaded 07 Jan 2022
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe recommendations of the EAC (Infra 1) committee meeting held on 10th March 2022 has been uploaded for Captive Jetty project. 25 Mar 2022
2. ADS Raise LetterADS reply letter is uploaded as blank document. Screenshot is attached. It is requested to upload the ADS reply letter and supporting documents once again by the PP. 25 Mar 2022
3. ADS Reply LetterPlease refer pages 16 to 21 of the enclosed pdf copy of MoM of EAC (Infra 1) dated 10.03.22 for recommendations of EAC for captive jetty project (Agenda 3.3 Proposal No. IA/OR/MIS/74417/2018; File No. 10-68/2018-IA.III) 23 Mar 2022
4. ADS Raise LetterIt may be noted that instant proposal involves an interlinked component i.e. captive jetty for handling of 52 MTPA cargo for which EC&CRZ is yet to be obtained by the proponent. As per the MoEF&CC O.M. dated 24/12/2010 (copy enclosed), After the EIA report is prepared and conduct of public hearing, proposal for EC for all the sectoral components of the project shall be submitted simultaneously. After the proposals relating to the various components have been considered by the respective EAC and their recommendations made, these proposals will be processed on individual files for obtaining simultaneous approval of the competent authority. In view of the above, it is requested to submit the recommendations of the EAC-Infra1 regarding the EC&CRZ for captive jetty project for processing of the proposal as mentioned above. 04 Mar 2022
5. ADS Reply LetterReplies to ADS dated 28.01.22 with Annexures and presentation 07 Feb 2022
6.NA

The committee deferred the consideration of the proposal and sough following additional information

04 Feb 2022
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShankarpratap Singh
DesignationDirector
Name of Company (Applicant Name should not be given here)JSW UTKAL STEEL LIMITED
AddressJSW Utkal Steel Limited Plot No. 3, Forest Park, Bhubaneshwar, Odisha
Print