Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Development of Data Center for Microsoft at HYD 01, Natco Site, Nandigama in Telangana, India Company/Organisation Name MICROSOFT CORPORATION (INDIA) PVT LTD
Registered Address Microsoft Corporation (India) Pvt. Ltd, Windsor, 4th Floor, Off CST Road, Kalina, Santacruz (E), Mumbai Maharashtra 400098 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Prashant Diwakar Bhat
(b)Designation (Owner/ Partner/ CEO) Director DC Construction
(c)Address Microsoft Corporation (India) Pvt. Ltd, Windsor, 4th Floor, Off CST Road, Kalina, Santacruz (E), Mumbai,Mumbai City,Maharashtra-400098
(d)Pin code 400098
(e)E-mail avyakthgone@microsoft.com
(f)Telephone No. 22-67724000
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNA
(c)Category B2
(d)Proposal Number SIA/TG/MIS/252577/2022
(e)Master Proposal Number(Single Window) SW/252574/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaRangareddiNandigamaMekaguda
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Mekaguda Vill., Nandigama Tehsil, Rangareddy District, Telengana State
Town / Village
(Name of more than one town may be entered by separating with)
Mekaguda Village Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
SY.Nos.:859,862,880,881,882,883 and 892
State Telangana District Rangareddi
Tehshil Nandigama Pincode 509223
Nearest railway station Kothur Distance from the project site 7
Nearest airport Rajiv Gandhi International Airport, Shamshabad Distance from the project site 22
Nearest Town/City/District Headquarters Hyderabad Distance from the project site 32
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Mekaguda Gram Panchayat – 9440480431 (Mr. Alwal Reddy – Panchayat Secretary) Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 67336 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The proposed Site is in Manufacturing Use zone under the jurisdiction of Hyderabad Metropolitan Development Authority (HMDA). Therefore, no change is expected. At present it is a vacant land on which project building i.e. Data Center will be constructed.
1.2 Clearance of existing land, vegetation and buildings? No Proposed project site is a vacant land, no trees and building are present at the existing site.
1.3 Creation of new land uses? No At present it is a vacant land on which project building i.e. Data Center will be constructed. The proposed Site is in Manufacturing Use zone under HMDA.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Bore holes test was conducted at 10 locations for maximum 15m depth and Soil Stability analysis were done for overall Site. From the investigation it was found that generally the soil from 0.0m-3.0m is composed of fine to medium sand with gravel and 3.0m-15.0m is very dense moorum/soft disintegrated rock. Based on which open foundation is recommended in the form of isolated footing.
1.5 Construction works? Yes Data Center building will be constructed at site with G+4 Floors
1.6 Demolition works? No The proposed Site is a vacant land and therefore, no demolition work is proposed at the Site.
1.7 Temporary sites used for construction works or housing of construction workers? No No construction camp is proposed at the Site, construction workers shall be hired from local population.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes It involves construction of Data Centre building with G+4 Floors above ground with excavation for foundation works and all attempts shall be made to use excavated soil at Site. Excess soil shall be disposed under local guidelines.
1.9 Underground works including mining or tunneling? No No underground works including mining or tunneling is envisaged at the Site.
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? Yes During Construction phase temporary sheds shall be developed for storage of goods/materials as below: • Raw material yard shall be designated area within the project site. • Cement shall be separately stored under cover in bales. • Sand shall be stacked under tarpaulin cover. • Bricks and steel shall be laid in open. These sheds shall be temporary structures and shall be dismantled and cleared after the construction phase is over.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction: Solid waste shall be disposed through authorized vendors; 450 KLD of sewage to be treated in skid mounted Modular STP. Operation: Solid waste shall be disposed through authorized vendors, STP sludge to be used onsite as manure. Domestic Sewage of 8 KLD will be treated in STP of 10 KLD based on MBR technology.
1.16 Facilities for long term housing of operational workers? No No housing facility proposed
1.17 New road, rail or sea traffic during construction or operation? No No new approach road proposed
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not envisaged
1.20 New or diverted transmission lines or pipelines? Yes A new 220 KV grid supply line is envisaged to meet the power requirement of Data Center during operation phase
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No During construction phase water will be sourced from tanker supply by authorized vendors. During operation phase, potable water will be sourced from TSIIC. Non potable water shall be sourced through tankers from authorized vendors/wastewater treatment plant.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The procured construction materials required for the proposed project will be transported by trucks /trolleys from the nearby areas. The transportation of construction material will be done in closed and/or covered PUC certified trucks.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes During Construction Phase: Temporary influx of people in the form of construction workers. However, these will be locally contracted labor and will be commuting daily. It is estimated that on an average there shall be 700 workers at construction Site while during peak construction period about 1100 workers will be working at the Site. During Operation Phase: There will be no permanent influx of people in this area however, during operation Data Center will employ 180 nos. of staff.
1.29 Introduction of alien species? No Native species will be planted for development of green belt. Hence, introducing of any alien or invasive species is not expected
1.30 Loss of native species or genetic diversity? No Not envisaged
1.31 Any other actions? No Not envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The present site is demarcated as Manufacturing Zone. Presently, the site is vacant and proposed to be converted to a built-up area for a Data Center. The proposed Site is already in possession of Microsoft.
2.2 Water (expected source & competing users) unit: KLD Yes Construction:500 KLD domestic water demand. 1,24,900 m3 construction water Operation:Gross water demand is 66 KLD of which 5 KLD is potable water and 61KLD is non-potable water including 7.3KLD Recycled water Potable water will be sourced from TSIIC. Non potable water shall be sourced through tankers from authorized vendors/wastewater treatment plant.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Cement: 2,70,000 Bags (50 Kg each) Sand: 23000 cum Aggregate: 29000 cum Bricks: 74,00,000 Nos. Steel Bars: 27,00,000 Kg Source: • Steel and cement will be procured from authorized local vendors. • Sand, aggregate and bricks will be procured from local licensed material suppliers.
2.5 Forests and timber (source – MT) No The use of timber and forest resources will be avoided. However, if required plywood for doors & windows shall be used which shall be procured from local market.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Construction: • Power requirement = 300 KW average • Backup Source = 3 Nos of 100 KVA DG sets • Construction Power connection shall be sourced temporarily from TCPDCL or authorized government agencies. Operation: • Power requirement=157 MVA (78.5 MVA in each Phase) • Incoming Grid Supply at 220 kV from TS Transco • Backup Source= Per phase - 81.5 MW; Total Power Backup for both phases = 163 MW i.e. 2 x (27 Nos. 3 MW and 1 No. 500 kW diesel generator sets)
2.7 Any other natural resources (use appropriate standard units) No No other natural resources will be used
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Total HSD – 1600 KL 800 KL (10 no. of tanks of 80 KL capacity) for each phase
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage, sewage treatment and waste management measures (as per SWM rule 2016) will be adopted for both construction and operational phase. No water stagnation or accumulation of water will be allowed, and disinfectant shall be used on regular basis for cleaning of toilets etc. to avoid spread of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes • During Construction phase: Employment opportunities provided due to the project will lead to better quality of life & have also set a standard for future developments in the area. Moreover, this project will provide employment to about 1100 local workers during construction phase. • During Operation Phase: As it is a Data Center facility there shall be services required which will generate direct & indirect employment for the people of nearby area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes Construction Phase: • Municipal solid waste – About 120 kg/day (approx@110 g/day x 1100) Municipal Solid Waste will be generated from the labours working at site. This waste shall be collected to be disposed by local authorised vendor. Operation Phase: • Food & Packaging Waste: 40 Kg/day Waste will be temporarily stored at Site and disposed through respective authorized vendors.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Construction Phase: Used oils, left over paints, etc. shall be stored and disposed as per latest Hazardous Waste Management Rule. During Operation Phase: About 150 Ltr/month of used oil from diesel generators will be stored and will be given to vendors authorized for the treatment and disposal. Suitable care will be taken so that spills / leaks of used oil from storage could be avoided.
4.4 Other industrial process wastes Yes About 40 Kg/month of e-waste will be generated from Site. Microsoft buys majority of its new technology from vendors having buy back policy for the old electronics and/or after exchanging old electronic products for the new ones. While leftover e-waste generated will be given to authorized recyclers and vendors.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes About 25 Kg/day of dried sludge will be generated from onsite STPs during operation phase. The sludge shall be used to maintain green area within the project premises.
4.7 Construction or demolition wastes Yes The proposed construction shall generate 3000 Tons of construction waste which shall be used at Site as much as possible and the remaining will be recycled to local scrap dealers. • Topsoil generated will be properly stored and re-used for landscaping and gardening. Excess excavated earth material (Cut: 1,22,000 cum; Fill: 25,000 cum) shall be stored at designated areas within plot and will be transferred at regular intervals at municipal approved zones only or to another construction project.
4.8 Redundant machinery or equipment No During construction phase all machineries/ equipment will be on hire basis or contracted upon requirement. All machineries will be removed after completion of construction.
4.9 Contaminated soils or other materials No No contamination of soil or other material will be involved.
4.10 Agricultural wastes No No agricultural wastes will be involved other than wastes from plantation.
4.11 Other solid wastes No No other waste will be generated.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Stationary source: DG sets Mobile source: Vehicles entering the site like cars, motorcycles, etc. Construction: • 3 nos. of DG set of 100 KVA shall be installed with adequate stack height to ensure dispersal of pollutants. • It will be ensured that construction vehicles have valid PUC Operation: 2 x (27 Nos. 3 MW and 1 No. 500 kW DG sets) will be provided with adequate stack height to ensure dispersal of pollutants
5.2 Emissions from production processes No No production is involved in the project and hence no emission is anticipated.
5.3 Emissions from materials handling including storage or transport Yes Fugitive emissions from material handling, loading/ unloading and transport of construction materials are expected. The effect shall be restricted to construction phase only. Regular sprinkling of water shall be done to keep the construction material moist at site wherever feasible for reduction in fugitive emission
5.4 Emissions from construction activities including plant and equipment Yes During the construction phase, emission is in the form of fugitive dust from construction and transport of construction and demolition material. Water sprinkling will be carried out to minimize the effect and wind barriers of required height shall also be placed to restrict the impact on the adjoining areas. Any transfer of material shall be in covered trucks.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes • Rise in dust levels during construction. Precautions taken: o RMC use will reduce the handling of cement, sand and concrete. o Tarpaulins will be used to cover trucks carrying debris. o Wind barriers will be provided. • Solid waste generated will be handled as per SWM Rules, 2016. Mobile toilets/bio-toilets will be provided, sewage from the portable toilets shall be vacuum-collected and treated in skid mounted Modular STP provided at Site.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable
5.8 Emissions from any other sources No Not envisaged
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction noise:75 dB(A) at 3m distance is anticipated at Site during construction phase. However, it will be temporary in nature and minimized by adopting maintenance such as greasing oiling and acoustic enclosures for noise abatement. Operation Phase: During Operation Phase DG sets deployed at Site shall have acoustic enclosures for noise abatement.
6.2 From industrial or similar processes No No industrial process shall be carried at Site.
6.3 From construction or demolition Yes Noise is expected to be generated mainly during construction phase from operation of Concrete Batching Plant.
6.4 From blasting or piling Yes No blasting or piling activities will be involved.
6.5 From construction or operational traffic No Noise (upto 75 dB (A)) will be generated from vehicular movement during the construction phase and operation phase. Traffic management and plantation around the boundary wall shall be done to further reduce noise from traffic.
6.6 From lighting or cooling systems Yes DG Sets used for backup power supply shall be provided with acoustic enclosure, moreover this will be for a very short period during power failures. Cooling system shall have adequate design measures to generate minimal noise.
6.7 From any other sources No No other noise source is envisaged.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Storage of petroleum and other hazardous chemicals will be on impervious layer viz Concrete. Careful handling of material will be done. All fire &safety norms will be strictly followed.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes During operational phase sewage generated shall be 8 KLD while the onsite STP provided will be of 10 KLD. No wastewater treated or untreated will be discharged from the Site during operation phase.
7.3 By deposition of pollutants emitted to air into the land or into water Yes To minimize the fugitive dust emission during construction regular water sprinkling would be carried out and tarpaulin cover in trucks would be provided. To minimize the same, greenbelt will be developed along the boundary and roadside.
7.4 From any other sources No No other sources envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Proper Environmental Management Plan will be followed for air, water, noise pollution and solid waste management. Hence, no long-term impacts are envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes During construction phase, adequate fire prevention measures like fire extinguishers, fire hydrants, fire alarms shall be installed at the site During operation phase adequate fire safety measures like fire alarms, water sprinklers in the buildings, fire extinguishers shall be commissioned in the buildings and all the strategic locations at site.
8.2 From any other causes Yes All the labors shall be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms shall be provided to all supervisors and labors involved in construction activity.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project site falls in the seismic zone-II, which is seismically least active zone.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes a) Supporting infrastructure (internal roads, power supply, waste, or wastewater treatment, etc.) - STP of capacity 10 KL are proposed. b) to e) Not Applicable
9.2 Lead to after-use of the site, which could have an impact on the environment No No such activities are proposed.
9.3 Set a precedent for later developments Yes The proposed development will facilitate further development of other similar projects.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not envisaged
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes • Mysura Kammadhanam Reserved Forest - 5.4 km in SW • Phulmamidi Reserved Forest - 10 km in E • Parandia Reserved Forest - 10.4 km in SE • Golur Reserved Forest - 13.7 km in NE • Santhepur Reserved Forest - 14.7 km in SE
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes • No significantly large water body exists within 15km radius, however, many small seasonal lakes/ponds present. • Seasonal Pond 1: for rainwater harvesting – 18m in W • Seasonal Pond 2: for rainwater harvesting – 330 m in NE
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters No None
5 State, National boundaries No None
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH44 – 3.4 km in NW South Central Railway Main Line – 4.5 km in NW
7 Defence installations No None
8 Densely populated or built-up area Yes Mekagudda Village – 1.3 km in N Shadnagar – 6 km in SW
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals • Sai Samhith Hospital: 7.5 km in N Schools • Medha International Schools: 6.83 km in W • Inmulnarva Zilla Parishad High School: 1.8 km in E • Natco High School Rangapur: 3.75 km in NE Place of Worship • Bangaaru soudamma Temple – 1.5 km in N • Sri Neelakanteshwar, Ramachandra,Anjaneya ,DarmaSai Temple – 1.60 km in N • JP Dargah – 3.0 km in SW
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No None
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The Site falls under the Zone II as per the Seismic Zone Map of India. It is Low Damage Risk Zone.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)05/03/2022The SEAC also observed that the proposed EMP cost is less than 0.2% of project cost which is insufficient and also noted that the Parking area is insufficient as per G.O.Ms.No.168, dt.07.04.2012 of the MA&UD Dept. Hence, the proponent was requested to revise and submit the details along with the NOC from the I&CAD Dept. In view of the above and after detailed discussions, the SEAC deferred the project for consideration after submission of above information by the proponent.
(2.)24/04/2022The response to ADS is provided in attached documentEDS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrashant Diwakar Bhat
DesignationDirector DC Construction
Name of Company (Applicant Name should not be given here)MICROSOFT CORPORATION (INDIA) PVT LTD
AddressMicrosoft Corporation (India) Pvt. Ltd, Windsor, 4th Floor, Off CST Road, Kalina, Santacruz (E), Mumbai