Form-1 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. Basic Informations | Project Name | Manufacturing of Key starting material for Intermediates of API | Company/Organisation Name | SPECIALITY ORGANICS PVT LTD | Registered Address | Plot No. 837 to 842, Sector-3, Pithampur Industrial Area, Bagdoon (Processing Area), Pithampur, District Dhar (M.P.) Madhya Pradesh 454775 | Legal Status of the Company | Others |
| 2. | Address for the correspondence: | (a)Name of the Applicant | Deepak Sunderji Joishar | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot No. 49-B, Sector B, Industrial Area, Mandideep, Raisen-462046, Madhya Pradesh,,Raisen,Raisen,Madhya Pradesh-462046 | (d)Pin code | 462046 | (e)E-mail | pithampur@sopl.co | (f)Telephone No. | 7480-233323 | (g)Fax No. | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(f)-API
| (b)Minor Project/Activity | 5(f)-API
| (c)Category | B2 | (d)Proposal Number | SIA/MP/IND2/203016/2021 | (e)Master Proposal Number(Single Window) | SW/203014/2021 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type(New/Expansion/Modernization) | Expansion |
|
| 4. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
| Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Dhar | Pithampur | Pithampur | | 5. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (c)Reason | -1 | (d)Supporting Document | NILL | |
| Location of the project | Plot No 837 to 842, Sector – 3, Pithampur Industrial Area, Bagdoon (Processing Area), Pithampur, District Dhar (M.P.) | | | Town / Village (Name of more than one town may be entered by separating with) | Pithampur | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | plot no. 837 to 842 | State | Madhya Pradesh | District | Dhar | Tehshil | Pithampur | Pincode | 454775 | Nearest railway station | Rau Railway Station | Distance from the project site | 28 | Nearest airport | Devi Ahilya Bai Airport,Indore | Distance from the project site | 60 | Nearest Town/City/District Headquarters | Pithampur | Distance from the project site | 15 | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Pithampur Municipal Corporation | Upload GPS file | Copy of Kml File  Uploaded GPS file | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | Brief summary of project | Uploaded Brief summary of project | | | Does your project location falls under out of any following areas | None of above Areas | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 1266.85 | Existing Built Up Area(In Meter /Sqr) | 6352 | Does it attract any of the general conditions given below? | No | | | Does it attract the specific condition given below? | No | | | Interlinked Projects | No | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | Forest land involved(hectares) | 0 | | | Is there any litigation pending against the project? | No | | |
1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The industry has total area of land area of 23819 Sq. Mtr. & 2.3819Hectare | 1.2 | Clearance of existing land, vegetation and buildings? | No | NA | 1.3 | Creation of new land uses? | No | NA | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | NA | 1.5 | Construction works? | Yes | Existing built-up area is 6352 sq. Mt and proposed built-up area will be 1266.85 Sq. Mt. | 1.6 | Demolition works? | No | Not applicable for this project. No demolition work is required. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Majority of labor will be hired from nearby villages so housing or shelter facilities will not be required for construction workers. However, temporary camp sites will be provided with minimum requirement of drinking and sanitation facilities for workers during working hours, if required. | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | No | NA | 1.9 | Underground works including mining or tunneling? | No | NA | 1.10 | Reclamation works? | No | NA | 1.12 | Offshore structures? | No | NA | 1.13 | Production and manufacturing processes? | Yes | The industry is planning to Manufacture Key starting materials for Intermediates of Active Pharmaceutical Ingredients. Details given under PFR. | 1.14 | Facilities for storage of goods or materials? | Yes | There will be separate storage area for the goods and materials | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid waste generated from packaging will be sent to the recycler/local vendors & liquid effluent to ETP cum STP | 1.16 | Facilities for long term housing of operational workers? | No | No long term housing facilities proposed. Skilled/Unskilled manpower required for construction/ Operational activities will be obtained from the nearby surrounding areas. Required accommodation facilities shall be provided, if required | 1.17 | New road, rail or sea traffic during construction or operation? | No | No The project site is very well connected with Road. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | NA | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | There will not be any closure or diversion of existing transportation routes. | 1.20 | New or diverted transmission lines or pipelines? | No | No such activities are envisaged. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There will be no change in the hydrology of water courses/ aquifers by the proposed project | 1.22 | Stream crossings? | No | NA. | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | No ground water shall be abstracted | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | NA. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | No | Road transport shall be utilized for employees of the industries and floating population. Transport of raw materials and finished products will also be done through road transport. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | The project does not involve any Long-term dismantling or decommissioning or restoration works. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Influx of people to the area shall be temporarily during construction phase. Total Occupancy: Occupancy during operational phase around 120 No. for proposed project. | 1.29 | Introduction of alien species? | No | NA | 1.30 | Loss of native species or genetic diversity? | No | NA | 1.31 | Any other actions? | No | NA | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Land was developed only for industrial activity and already declared as Industrial Estate. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total Proposed water consumption is 235 KLD & source is AKVN.
Existing water consumption is 270 KLD & source is AKVN. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The quantity of the construction material will vary at the time of construction. | 2.5 | Forests and timber (source – MT) | No | NA | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Supply from Grid; Existing transformer of 1250 KVA is sufficient.
Proposed DG set 750 KVA & Diesel
For Boiler- LDO | 2.7 | Any other natural resources (use appropriate standard units) | Yes | Natural gas Based boiler. | |
3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | During process, handling and storage of chemicals due care shall be taken to minimize the harmful effects on human health and environment. All required PPEs and training for the safe and efficient handling of chemicals shall be provided to all the working staff before actual work and thereafter once in a year. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | NA | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Labor are employed which is positive change for social up-liftmen. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | NA | 3.5 | Any other causes | No | NA | |
4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | NA | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Municipal waste generated will be sent to the local vendors/recyclers. Domestic waste will be treated through ETP cum STP | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | List of Hazardous Waste and their quantity with mode of disposal given in PFR. Hazardous wastes such as Sludge from Effluent Treatment oil soaked wastes, discarded containers shall be generated. These wastes shall be collected and stored with utmost care and shall be disposed to Authorized recycler/TSDF Site at Pithampur | 4.4 | Other industrial process wastes | Yes | The industrial process waste will be sent to TSDF site. | 4.5 | Surplus product | No | There will be no surplus product | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge will be sent to TSDF site. | 4.7 | Construction or demolition wastes | Yes | There will be no demolition waste but waste generated due to the construction will be disposed as per the C& D rules 2016. | 4.8 | Redundant machinery or equipment | No | There will be no Redundant machinery or equipment. | 4.9 | Contaminated soils or other materials | No | There will be no Contaminated soils or other materials | 4.10 | Agricultural wastes | No | No agricultural wastes would be generated in this project. | 4.11 | Other solid wastes | Yes | Empty glass bottle, cartoons, paper wastes etc. shall generate. | |
5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | There will be emission of SO2 and NOx from the DG stack. Stacks of appropriate height will be provided for boiler (Proposed- 1 no. 3000 kg/hr Fuel is LDO, 2 nos. 2 Lac Kcal/hr Fuel is natural gas) and DG set (Proposed- 1 no.750 KVA and fuel is diesel) for proper dispersion of the pollutants.
Existing Utilities-
Boiler- 2 TPH (1 No.)
DG Set- 750 KVA (1 No.) | 5.2 | Emissions from production processes | Yes | Emission from production process may involve gases however they shall be send to the existing scrubber where applicable and hence no emission from the production processes. | 5.3 | Emissions from materials handling including storage or transport | Yes | Minimal quantity of emissions will be there during handling including storage or transport. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Local emission of dust is anticipated | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | During the construction phase and handling of materials dust will be generated | 5.6 | Emissions from incineration of waste | No | NA | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | NA | 5.8 | Emissions from any other sources | No | NA | |
6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | DG Set will generate noise. However, DG sets shall have Acoustic Enclosure. | 6.2 | From industrial or similar processes | Yes | During construction there would be some noise however during operations, there will be not much noise as this is not an engineering or heavy engineering industry | 6.3 | From construction or demolition | Yes | Ear muff shall be provided to the workers while working. | 6.4 | From blasting or piling | No | NA | 6.5 | From construction or operational traffic | Yes | Operation phase adds to noise generation from loading / unloading operation and from transportation of finished products. However, to control noise generation within the prescribed standard, all the Trucks carrying goods shall be checked for fitness and certification from RTO. | 6.6 | From lighting or cooling systems | No | Adequate measures shall be taken to keep noise and vibrant under control. | 6.7 | From any other sources | No | NA | |
7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | No risk of contamination of land and water from Hazardous waste from hazardous materials since proper measures will be taken. Leakage & spillage will be taken care of. Collection and disposal of Hazardous waste will be done as per Hazardous and Other Wastes (Management and Trans-boundary movement) Rule 2016 hence no adverse impact on land environment is envisaged. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The proposed domestic waste water and industrial waste water generated will for the treatment in ETP cum STP. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Negligible amount of air pollutants will be generated during the process. | 7.4 | From any other sources | No | NA | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | During process of manufacturing, storage, handling or transportation; emission will be within the limit of statutes as all processes will be performed in a closed reactors. Hence, there will not be any possibility of pollutants getting built-up into the atmosphere. To avoid such risk, regular ambient air as well as workplace monitoring will be performed periodically to assess the concentration of individual pollutants to initiate required control measures in time. | |
8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Appropriate control measures have been taken and all required firefighting measures have implemented. Moreover, all the staff engaged with plant operation is trained in the field of safety, health and environment to avoid risk arising out of handling, storage and manufacturing processes. | 8.2 | From any other causes | Yes | NA | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Adequate safeguards against natural disasters like earthquake etc. shall be incorporated during design and engineering of the project. Data from IMD supports that the site is not prone for flood, landslides and does not fall under earthquake prone areas. | |
9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The industry is generating the employment, developed infrastructure therefore enhancing the social aspect. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | NA | 9.3 | Set a precedent for later developments | No | This type of project will definitely help for small entrepreneur to come forward and thing of putting parallel unit to support the activities in the field. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | NA | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | NA | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Declared Industrial Estate. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Declared Industrial Estate. | 4 | Inland, coastal, marine or underground waters | No | No such water sources are existing within the proximity of project site. | 5 | State, National boundaries | No | NA | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | NA | 7 | Defence installations | No | NA | 8 | Densely populated or built-up area | No | Declared Industrial Estate | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | Declared Industrial Estate | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | NA | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NA | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | As per the Seismic Zoning Map of India this project site falls under Least to Moderate Active Zone. There is no river and water catchment area and hence chances of flood are negligible. Also, as per the Flood Atlas, Task Force Report, CWC, GOI, the area does not liable to floods.. | | Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | | Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | Deepak Sunderji Joishar | Designation | Director | Name of Company (Applicant Name should not be given here) | SPECIALITY ORGANICS PVT LTD | Address | Plot No. 837 to 842, Sector-3, Pithampur Industrial Area, Bagdoon (Processing Area), Pithampur, District Dhar (M.P.) |
|
|