APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notificationNA
Weather Consent to Establishment ObtainedNA
Upload copy of CTE NA
1.Name of the Project “Development of Industrial Park” (Exclusively for Industries which do not require Environmental Clearance, Neither A nor B) by M/s. Vinplex India Pvt Ltd
Proposal No SIA/TN/MIS/60639/2021
2.Project Sector INFRA-2
3.Location of the project Panapakkam & Maduravasal Uthukottai Tiruvallur Tamilnadu
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectTamil Nadu
Details of State of the project
S.no State Name District Name Tehsil Name
NIL
7.Town / VillagePanapakkam & Maduravasal
8.Plot/Survey/Khasra No.17/2, 18/1B, 18/2B, 18/3B, 18/5, 18/6, 19/3B, 19/4, 19/5, 20/1, 20/2, 21/1, 21/2, 21/3, 21/4A, 21/4B, 21/5, 22/1, 22/4, 23/1, 23/2, 23/3PT, 24/1, 24/2, 24/3, 25/6, 26/1, 26/2, 26/3, 27/2, 27/3A, 27/3B, 28/1PT, 28/2, 29, 30, 32/1, 32/2, 32/3, 32/4, 32/5, 32/6, 34/1, 35/2, 45/1, 45/2A, 45/2B, 45/5, 45/6, 47, 59, 83/3B, 101/1B, 101/2B, 102/1, 102/3, 103/2, 113/1, 113/2, 114/1, 115/1, 115/2, 115/3, 115/4, 116/1A, 116/1B, 116/2, 116/3, 116/4, 116/5, 117, 118/1, 118/2, 119, 120/2, 233/2, 242/1, 242/2, 243, 244, 245/1A, 245/1B2, 245/2B, 247, 248/1A, 248/1B, 248/2, 249/1, 249/2, 250, 251, 253/1, 253/2, 254/1A, 254/1B, 254/1C, 254/2, 254/3, 254/4, 255, 256/1, 259/1 , 260/1, 260/2, 261/1, 261/2, 262/1A2, 262/2A, 262/2B, 266/2B, 267/1B, 267/2, 268, 271/2, 272, 273, 274 , 379/1, 379/2A, 383/1A, 383/1B, 383/2, 383/3, 384/1A, 384/1B, 384/3A, 384/3B, 384/4, 385/1B, 385/2A2, 385/2B, 386/1A, 386/2A2, 391/3B, 392/1F, 394/2, 395/2, 395/3, 396, 397/3, 397/4, 399/1A, 399/1B, 403/1, 403/2A, 403/
9.S. No. in the schedule8(b) Townships and Area Development projects.
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Industrial Park 89.96 Acres (36.41 Ha) (Exclusively for Industries which do not require Environmental Clearance, neither A nor B) ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Kavaraipettai Railway Station, ≈11.08 Km (NE) km
18. Nearest airport along with distance in kms Chennai International Airport, ≈32.84 Km (SSE) km
19. Nearest Town/City/District Headquarters along with distance in kms Ponneri Town , ≈12.46 km (NNE) km
20. Distance of the project from nearest Habitation 0.1 , 0.1 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 24529
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) No
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes 89.96 acres (36.41 Ha) of barren land. (Land document along with the list of S.F Numbers listed in Annexure-1) These lands are barren lands as per revenue records which have been converted into industrial plot through proper approval.
1.2 Clearance of existing land, vegetation and buildings? Yes The land use of site is mostly fallow and open/barren land. Existing shrubs and bushes will be cleared.
1.3 Creation of new land uses? Yes 89.96 acres of land has been converted into IP for non EC category industries. There will be spurt of economic activities with sustainable development.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigations involving borehole and electrical resistivity tests will be carried out to ascertain the soil characteristics including strength parameters.
1.5 Construction works? Yes Individual industries on their respective allotment. However Internal roads and storm water drainage systems in the Industrial Park will be executed by Project Proponent.
1.6 Demolition works? No No demolition works are anticipated in the proposed Industrial Park
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites are proposed for housing for the workers as they will be hired from the surrounding area.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Roads and Storm water drains will be developed as per the project requirement. Topsoil excavated during construction activities will be stored and used for construction work/landscape development within the project site.
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes The plots will be allocated to Electronics manufacturing, Light Engineering & other such industries, which are not require Environmental Clearance, neither A nor B. Only on allotment of lands to the Industries, this information can be furnished. However, Project Proponent (PP) assures that no industry either A or B under EIA Notification will be given allotment.
1.14 Facilities for storage of goods or materials? Yes The allottee industries will develop their storage facilities in their plots, independently to suit their requirements
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes STP is provided for sewage and treated water will be used for toilet flushing and greenbelt development. The hazardous waste shall be transferred for required treatment and disposal in the common facility operated by TamilNadu Waste Management Ltd, Gummidipoondi, with all statutory approvals. The hazardous waste shall be transferred for required treatment and disposal in the common facility operated by TamilNadu Waste Management Ltd, Gummidipoondi, with all statutory approvals.
1.16 Facilities for long term housing of operational workers? No No long term housing is proposed
1.17 New road, rail or sea traffic during construction or operation? No Internal roads within project site for the movement of men and material. External connectivity Tirupati Road which is adjacent to Site.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Internal roads within project site for the movement of men and material. External connectivity Tirupati Road which is adjacent to Site.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No The proposed connectivity shall not attract any closure or diversion of the existing transport routes.
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No There is no stream crossing at the project site
1.23 Abstraction or transfers of water from ground or surface waters? No Total water requirement for the proposed Industrial Park is 363.2 KLD which is sourced from village panchayat/private Tankers.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Grading within the project site will be planned and implemented in such there will be no impact in runoff. Rain water harvesting system will be provided along the project site.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction materials will be transported by existing Tirupathi Road. Internal road can be developed inside the site.
1.26 Long-term dismantling or decommissioning or restoration works? No No long term dismantling or decommissioning or restoration works are envisaged.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No ongoing activity is envisaged.
1.28 Influx of people to an area in either temporarily or permanently? Yes Temporary influx of construction workers during construction phase will be 300 No’s and operation phase will be 5280 Nos.
1.29 Introduction of alien species? No None Envisaged
1.30 Loss of native species or genetic diversity? No None Envisaged
1.31 Any other actions? No None Envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Barren Land. No Agricultural activities.
2.2 Water (expected source & competing users) unit: KLD Yes Total water requirement for proposed IP is 363.2 KLD which is sourced from local panchayat/private Tankers. 1. Industries- 0.14 MLD 2. Domestic- 0.146 MLD 3. Flushing-0.076 MLD 4. Greenbelt -0.20 MLD
2.3 Minerals (MT) Yes To be submit and get an individual approval of each units from TNPCB on the basis of the activities
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes 2.4 Construction material – stone, aggregates, and / soil (expected source- MT) Yes To be submit and get an individual approval of each units from TNPCB on the basis of the activities.
2.5 Forests and timber (source – MT) No Nil
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement – 12 MVA which will be sourced by TANGEDCO. Proposed to install 2 x 320kVA DG set for providing the power supply to admin office. Individual industries will have their own power back up.
2.7 Any other natural resources (use appropriate standard units) No None Required. There is no need for other natural resources
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Fuel and raw materials required for various industries will be stored within individual industries
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No No occurrence of diseases
3.3 Affect the welfare of people e.g. by changing living conditions? No Direct and indirect employment during construction and operation phases of the project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Buffer Zone will have Vulnerable groups and Suitable mitigation pollution control measures and safety measures will be implemented by individual industries.
3.5 Any other causes No None Envisaged
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No spoil, over burden or mine waste envisaged
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal Solid Waste Generation (5280Nos): S. No Waste Quantity (kg/d) Disposal methods 1 Organic 1584 Disposed through OWC or local village bin 2 Inorganic 1056 Authorized TNPCB agency Individual Industries will dispose their waste as per the Norms.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The lands will be allotted to Electronics manufacturing, Light Engineering & other such industries, which do not require Environmental Clearance, neither A nor B. Category and Quantification can be assessed only after enlisting the allottee industries and their process of production /Products.
4.4 Other industrial process wastes Yes Individual industries during establishment apply for separate CTE as applicable and the quantity of industrial process waste if any will be mentioned.
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Characterization and quantification will be carried out after enlisting the allottee industries.
4.7 Construction or demolition wastes Yes During construction phase, construction debris may be generated which will be segregated and whatever is re-saleable will be sold to buyers and rest of the waste will be used for filling up of low lying areas and development of internal roads and boundary walls. Excess quantity if any will be disposed as per norms. However, PP will monitor and ensure strict compliance on continuous basis.
4.8 Redundant machinery or equipment Yes Individual industries will address.
4.9 Contaminated soils or other materials No Not envisaged during normal operation. Accidental spills if any, will be recovered and appropriate remedial measure will be carried out by Individual industries.
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Construction Phase: Operation of diesel engine driven construction equipment and movement of trucks/ vehicles carrying men and materials Operation Phase: Emissions are from the industrial stacks, movement of trucks/ vehicles carrying men and materials
5.2 Emissions from production processes Yes Emissions are from the different industrial production processes, movement of trucks/ vehicles carrying men and materials. The details of emissions will be provided in EIA report.
5.3 Emissions from materials handling including storage or transport Yes Depends on the allottee industries, Emissions from material handling, storage & transport will be negligible since dedicated storage facilities may present within the site.
5.4 Emissions from construction activities including plant and equipment Yes Temporary in nature which may originate during construction of buildings or road, this will be taken care by sprinkling of water. Hence, emissions from construction activity are insignificant
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is likely to be generated during construction phase, Water sprinkling will be done and Tarpaulin cover will be provided over stored raw material to reduce dust emission. Green belt development will be taken up along boundary and open areas will be provided.
5.6 Emissions from incineration of waste No There will be no incineration activities.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Will not be permitted
5.8 Emissions from any other sources Yes Emission Stacks from utilities like Boiler, DG Set, etc., The summery of stacks could be listed on enlisting the activities of the allottee industries.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise levels are expected at DG set area. The noise generating sources are kept inside acoustic enclosure to control the propagation of Noise. Most of the equipment structures are static, vibration effect of these are only local, design of support and foundation will nullify the intensity of vibrations.
6.2 From industrial or similar processes Yes No major noise generating equipments are proposed depends on the activities or processes of the allottee industries
6.3 From construction or demolition Yes Temporary excavation, drilling, welding during construction at the site will generate noise, vibration and dust emissions which will be mitigated by water spraying and deploying well maintained vehicles
6.4 From blasting or piling No No blasting activity, but there will be piling activity during the construction stage. Personal Protective Equipment will be provided to the work force.
6.5 From construction or operational traffic Yes Noise from traffic movement is expected during the construction process. During construction phase construction materials will be transported by road, through well maintained vehicles.
6.6 From lighting or cooling systems No Does not arise depends on the activities of the allottee industries
6.7 From any other sources No Nil
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Good housekeeping is ensured throughout the facility to minimize the spillage. Spill kits are provided during the transportation of the hazardous waste, to avoid any contamination of the soil
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No discharge of effluent. 2 Nos of 160 KLD STP, one existing and one will be Provided.
7.3 By deposition of pollutants emitted to air into the land or into water Yes The major emissions from the facility are PM, SO2 and NOx. Stack height meeting MoEF guidelines are provided for proper dispersion of emissions. Hence a chance of contamination of land and water by deposition of pollution is not envisaged. The allottee Industries will adhere to Norms and Standards of TNPCB and under their monitoring for consent orders for continual plant operation
7.4 From any other sources No None Envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No The limited release of pollution will be within the prescribed limits by proper Environmental Management Plan
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes An adequate step for firefighting has been taken to control fires in case of emergency. During construction all the labors will be provided with suitable PPE as required under the health & safety norms. Training and awareness about the safety norms provided to all supervisors and labors involved in construction activity. Proper EHS measures implemented
8.2 From any other causes No None Envisaged
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The study area falls under Zone III according to the Indian Standard seismic zone map thus the changes of earthquake are not much here. The location is not susceptible to floods, landslides or cloud bursts
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The quantification and characteristics are possible, only after finalizing the land allotment to allottee industries 1. PP will develop all interior roads with dust-free, concrete / Tar feltroads 2. The lands will be allotted to the industries only if Zero level discharge (solid / liquid) shouldbeensured by the industries. Nil Could be ascertained on the basis of the activities of the proposed industries
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes This Industrial Park would pave the way for setting up of Industrial development in the local area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The proposed project will follow the local laws to keep cumulative effect under control
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No None in the Study Area
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Description Dist. ˜ Dir Arani River 1.61km WNW Korttalaiyar River 4.95km S Vembedu RF 7km WSW Erumaivettipalaiyam RF 8.75km SE Manali RF 5.75km NW Palavakkam RF 5.18km NW Telugu Ganga Canal 13.91km W Malandur RF 10.18km WSW Krishna River Canal 12.66km SSE Alamadi RF 10.84km SSE Cholavaram Tank 10.18km SE Nemalur RF 13.47km NNW Panchali RF 11.71km NNW Siruvedu RF 12.70km NNW TN-AP State Boundary 13.83km NW Senjiyagaram RF 13.84km WNW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No There are no notified Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
4 Inland, coastal, marine or underground waters Yes Description Dist. ˜ Dir Krishna River Canal 12.66km SSE Telugu Ganga Canal 13.91km W Cholavaram Tank 10.18km SE
5 State, National boundaries Yes TN –AP State Boundary ˜ 13.83km (NW)
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Tirupathi - Chennai Road, Adjacent (S)
7 Defence installations No Not applicable
8 Densely populated or built-up area Yes Periyapalaiyam ˜ 890m (NW)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Description Dist. (˜) Dir. Schools & Colleges Government School-Balakrishnapuram 14.87km NW Govt School Perandur 12.75km W Government school Kilakarmanur 7.90km WNW Government higher secondary School Meyyur 13.65km WSW Vilapakkam Govt. High School 12.28km SW Government Primary School Keelanur 14.63km SW Government School Palavakkam 11.01km W Govt Higher Sec School Palasvaram 1.86km WNW Government High School Arikkampattu 6.30km SSW Government Primary School Karani 2.75km N
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Description Dist. ˜ Dir Arani River 1.61km WNW Korttalaiyar River 4.95km S Vembedu RF 7km WSW Erumaivettipalaiyam RF 8.75km SE Manali RF 5.75km NW Palavakkam RF 5.18km NW Telugu Ganga Canal 13.91km W Malandur RF 10.18km WSW Krishna River Canal 12.66km SSE Alamadi RF 10.84km SSE Cholavaram Tank 10.18km SE Nemalur RF 13.47km NNW Panchali RF 11.71km NNW Siruvedu RF 12.70km NNW Senjiyagaram RF 13.84km WNW
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Earthquake: The project site falls under seismic zone-III (Moderate active) according to the Indian Standard Seismic Zoning Map. Therefore, suitable earthquake design will be followed in structural and basis civil design. Flood: There had been Tsunami and associated flooding. Therefore, suitable flood prevention measures will be followed in basis civil design. Landslide May not occur since it is a plain terrain.
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5 Uploaded Form-1A Annexure-Form-1A
6 Uploaded Conceptual Plan Annexure-Conceptual Plan
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameM/S VINPLEX INDIA PVT LTD
DesignationMD
Company M/S VINPLEX INDIA PVT LTD
AddressNo 1 Regus Olympia Tech Park SIDCO Industrial Estate
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print