| APPENDIX I | | (See Paragraph-6) | | CATEGORY - B | | | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I)Basic Informations | | | Whether proposal involved violation of EIA notification | NA | | Weather Consent to Establishment Obtained | NA | | Upload copy of CTE | NA |
| | 1. | Name of the Project | Production of 540 ltrs per day of country liquor (max.) production at Dapala village in Kantamal Tahasil in the district of Boudh of Odisha State. | | Proposal No | SIA/OR/IND2/51535/2020 |
| | 2. | Project Sector | Industrial Projects - 2 |
| | 3. | Location of the project | Dapala |
| | | | | 6. | State of the project | Orissa | | | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Orissa | Boudh | Kantamal | | | | | 8. | Plot/Survey/Khasra No. | Village-Dapala Khata No-64,Plot No. 782 Area-0.120 Dec, Kissam –Gharabadi | | | 9. | S. No. in the schedule | 5(g) Distilleries
|
| | 10. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 0.540 KLD ha. | | | 11. | | New/Expansion/Modernization | New | | | | 12. | Category of project | B | | | 13. | Does it attract the general condition? If yes, please specify | No | | | 15. | Does it attract the specific condition? | No | | | 16. | Is there any litigation pending against the project? | No | | | 17. | Nearest railway station along with distance in kms. | Rairakhol, 80 km | | | 18. | Nearest airport along with distance in kms | Bhubaneswar, 250 km | | | 19. | Nearest Town/City/District Headquarters along with distance in kms | Boudh , 40 km | | | 20. | Distance of the project from nearest Habitation | 1.0 , 1.0 km | | | 21. | | Details of alternative sites examined shown on a toposheet | No | |
| | 22. | | Whether part of interlinked projects? | No | | | | 23. | | Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980? | No | | | | 24. | | Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972? | No | | | | 25. | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No |
| | 26. | | Whether there is any Government Order/Policy relevent/relating to the site? | No | |
| | 27. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | |
| | 28. | Project Cost(in Lac.) | 0.08 |
|
| 30. | Whether the proposed project/activity located in notified Industrial area(Yes/No) | No |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | Total area of 0.120 ac. has already been used for installation of this unit. The unit has the entire required infrastructure present there. No additional land will be required. The existing land is a private land and has been changed to industrial use. | | 1.2 | Clearance of existing land, vegetation and buildings? | No | It is an existing unit. | | 1.3 | Creation of new land uses? | No | The existing land has already been changed to industrial purpose. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Not required as it’s an existing unit. | | 1.5 | Construction works? | No | Not required as it’s an existing unit. | | 1.6 | Demolition works? | No | Not required. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Not required. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | No | Not required. | | 1.9 | Underground works including mining or tunneling? | No | Not required. | | 1.10 | Reclamation works? | No | Not required. | | 1.11 | Dredging? | No | Not required. | | 1.12 | Offshore structures? | No | Not required. | | 1.13 | Production and manufacturing processes? | Yes | Fermentation & Distillation process is adopted. Details process is incorporated in PFR. | | 1.14 | Facilities for storage of goods or materials? | Yes | Adequate storage facilities for raw material and finished product have been provided within the project area. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | About 153 Kg of mahua residue & 127\ Kg of Ash from Bhatti is generated daily and being provided to bricks maker unit. | | 1.16 | Facilities for long term housing of operational workers? | No | Not applicable | | 1.17 | New road, rail or sea traffic during construction or operation? | No | Not applicable | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not applicable | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable | | 1.20 | New or diverted transmission lines or pipelines? | No | Not applicable | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not applicable | | 1.22 | Stream crossings? | No | Not applicable | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total 3 KLD of water is required per day. Total water is withdrawl from ground water source. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Mahul flower are being sourced from the local market and transported to the site by road through trucks. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | There are 8 no. of people engaged in this project and are sourced from nearby village. | | 1.29 | Introduction of alien species? | No | | | 1.30 | Loss of native species or genetic diversity? | No | | | 1.31 | Any other actions? | No | | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Dapala O.S. Shop is on gharabadi land over 0.12 Dec of area | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | 3 KLD is being sourced from Ground water source. | | 2.3 | Minerals (MT) | Yes | Raw material required is as follows:
Mahul flower – 478 Kg /day
Reice Husk – 415 Kg /day
Water – 3 KLD | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | | | 2.5 | Forests and timber (source – MT) | No | | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | No | | | 2.7 | Any other natural resources (use appropriate standard units) | No | | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No hazardous substances are being used in the unit. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Project activities are not likely to cause changes in occurrence of disease or affect disease vectors. | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Local people are benefited by means of direct and indirect employment. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Domestic waste generated from the area will be disposed. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | | | 4.4 | Other industrial process wastes | Yes | Mahua Flower Residue 153 Kg /day and 127 Kg/day Husk Ash | | 4.5 | Surplus product | Yes | Mahua flower residue generated will be used as manure for agriculture and cattle feed. | | 4.6 | Sewage sludge or other sludge from effluent treatment | No | | | 4.7 | Construction or demolition wastes | No | | | 4.8 | Redundant machinery or equipment | No | | | 4.9 | Contaminated soils or other materials | No | | | 4.10 | Agricultural wastes | No | | | 4.11 | Other solid wastes | No | | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | No fossil fuel is used. Only Burning of Husk involved, which consists PM, Sox NOx would be discharge to atmosphere through chimney of suitable height. | | 5.2 | Emissions from production processes | Yes | Burning of Husk 0.5 kg/hr. | | 5.3 | Emissions from materials handling including storage or transport | No | | | 5.4 | Emissions from construction activities including plant and equipment | No | | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust generated as mentioned above. No odour problem envisaged. | | 5.6 | Emissions from incineration of waste | No | | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | | 5.8 | Emissions from any other sources | No | | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | No | There is no noise as no machinery is involved. | | 6.2 | From industrial or similar processes | No | | | 6.3 | From construction or demolition | No | | | 6.4 | From blasting or piling | No | | | 6.5 | From construction or operational traffic | No | | | 6.6 | From lighting or cooling systems | No | | | 6.7 | From any other sources | No | | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | There will be no discharge of sewage from the unit as water is required for only cooling purpose, which will be recycled. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Since the bhatti is connected with chimney of adequate size, there will be minimal emission. | | 7.4 | From any other sources | No | | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | | | 8.2 | From any other causes | No | | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | No such event is known to have occurred in the area. | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Supporting facilities are available as it is an existing unit. Owner will contribute towards improvement of rural population in the vicinity. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | | 9.3 | Set a precedent for later developments | No | | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Kankadungri RF – 1.0 Km
Narghant RF - 10.0 Km | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Forest as above
Mahanadi River -= 20.0 Km | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | | 4 | Inland, coastal, marine or underground waters | No | | | 5 | State, National boundaries | Yes | | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | SH 41 – 10 Km | | 7 | Defence installations | No | | | 8 | Densely populated or built-up area | Yes | Kantamal - 15.0 Km | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Dapala - 1.0 Km | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | | (IV) | PROPOSED TERMS OF REFERENCE FOR EIA STUDIES | | | ADDITIONAL MULTIPLE ENTERIES | | (V) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge | | V.(i) | | Name | SMT MIRA DEVI | | Designation | Propreitor | | Company | SMT MIRA DEVI | | Address | At - Shaktinagar, PS - Ainthapalli |
|
|