1.Name of the Project Suntril Pharmaceuticals Pvt. Ltd.
Proposal No SIA/HR/IND2/4412/2015
2.Project Sector Industrial Projects - 2
3.Location of the project Plot No 219, HSIIC Industrial Area, Barwala, Panchkula
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectHaryana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)HaryanaPanchkulaPanchkula
7.Town / VillageAlipur
8.Plot/Survey/Khasra No.216, HSIIDC, Alipur, Barwala
9.S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 9 tonnes per annum ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? Yes
15.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous typeof industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries includingproposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
(a).i.  (a) i.Status of the Environmental Clearance to the ProjectEC application yet to be submitted
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. CHANDIGARH, 16.6 km
18. Nearest airport along with distance in kms CHANDIGARH, 17.0 km
19. Nearest Town/City/District Headquarters along with distance in kms ALIPUR , 0.350 km
20. Distance of the project from nearest Habitation 0.350 , 0.350 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 784.39
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) N/A
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The land has been earmarked for industrial development. Allotment has been done vide agreement dated 10.10.14 (HSIIDC: BRW: E: 2014: 1319). The terrain of the site is flat in nature with moderate depression in very few areas, which would be utilized during construction in line with natural topography/contour.
1.2 Clearance of existing land, vegetation and buildings? Yes Land shall be prepared as per requirement of industrial construction project. All necessary building bye laws shall be followed.
1.3 Creation of new land uses? No The project shall be commissioned in an allotted land
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil testing has been done.
1.5 Construction works? Yes The project requires construction of industrial shed along with all necessary associated facilities such as administrative office, storage facilities, fire fighting facilities, security office, utility shed and parking
1.6 Demolition works? No NA
1.7 Temporary sites used for construction works or housing of construction workers? Yes Most of the labours are from local areas. Around 70 temporary workers would work in the site during construction period for which adequate provisions for solid and liquid/sewage waste disposal shall be created.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Industrial shed and associated structures
1.9 Underground works including mining or tunneling? No No underground mining or tunneling would be required
1.10 Reclamation works? Yes Soil would be reclaimed wherever applicable for leveling
1.11 Dredging? No NA
1.12 Offshore structures? No NA
1.13 Production and manufacturing processes? Yes This is a pharmaceutical manufacturing process. All processes shall be carried out as per GMP.
1.14 Facilities for storage of goods or materials? Yes Construction materials shall be brought as and when required and stored at the site in a covered area. HSD for DG sets shall be stored in a specified HSD storage yard. Chemicals shall be stored in a designated location inside the premises with full protection from spills, leakages and fires. Risk Assessment study for storage of hazardous materials will be carried out
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Effluent Treatment Plant (ETP) / Sewage Treatment Plant will be set up for treatment of effluents / sewage generated in the complex. Primary, Secondary and Tertiary treatment units will be provided in the ETP on site, treated effluent to the tune of 90 % will be recycled for cooling tower and remaining 10% is forwarded to HSIIDC ETP. MBBR technology shall be deployed for this project saving precious space and ensuring high efficiency. There shall be a minimal discharge of liquid effluent to the
1.16 Facilities for long term housing of operational workers? No The employees would make their own arrangement of boarding and lodging.
1.17 New road, rail or sea traffic during construction or operation? Yes New internal connecting roads are proposed to be constructed from the existing chuck roads.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No There are existing approach road in HSIDC
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Due to the upcoming project, there will be no closure of existing transport routes or infrastructures leading to changes in traffic movements
1.20 New or diverted transmission lines or pipelines? No New electrical transmission lines will be laid to get the electricity. Also in due course of time water pipelines may be laid and connected to main industrial area water connection
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Yes Storm water Drains & Sewer Lines are already constructed within the industrial estate. Internal pipelines shall be realigned/connected to the main drainage network.
1.22 Stream crossings? No N.A
1.23 Abstraction or transfers of water from ground or surface waters? Yes Project proponent intends to use municipal water supply whenever available. However, considering an average yield of 20,000 to 25,000 litres / hour provision of 01 bore well with pumps operating for about 6-8 hrs/day in cycling has been envisaged with extraction of 20 cu.m/day
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Rain water would be used to recharge the ground water and storm water would be channelized to aquifer .So no extra load is envisaged in existing water bodies.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transport of personnel or materials would be required during construction phase. During occupancy there would be influx/ outflux of residents, guests, housekeeping staffs and other service peoples. Such would be made with minimal disturbance to existing traffic and all constructional material transportation would be covered and sprinkled with water to minimize fugitive dust.
1.26 Long-term dismantling or decommissioning or restoration works? No NA
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No NA
1.28 Influx of people to an area in either temporarily or permanently? Yes During construction phase, workers would be employed temporarily. During occupancy there would be permanent inflow of operational and maintenance staff
1.29 Introduction of alien species? No NA
1.30 Loss of native species or genetic diversity? No NA
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The land is inside the industrial area
2.2 Water (expected source & competing users) unit: KLD Yes The total water consumption is estimated to be 20 KLD. Industrial Area is well connected to Water Supply System through OHSR, which will be sufficient to supply the total water requirement.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Other materials like brick, sand, aggregates, tiles etc shall be procured locally in the desired quantity as and when required.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 500 KW is the total connected load and is proposed to be sourced from State Electricity Board at 11KV with new transmission lines & control rooms shall be constructed for this purpose from where electricity shall be supplied to the end users. Apart from that 200 KVA DG sets would serve as a backup for critical operations.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes HSD will be used as a fuel for operation of DG sets which will be stored in a HSD storage yard of area. Maximum storage shall be 75 KL
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes There would be employment generation for the local peoples.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No It is an industrial estate
4.2 Municipal waste (domestic and or commercial wastes) Yes Solid wastes would be mainly biodegradable kitchen wastes; few non biodegradable wastes like plastics, waste papers; hazardous wastes like used batteries, etc. Biodegradable and Non biodegradable wastes would be collected in separate bins and would be disposed as per local HPCB norms
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Spent oils from DG sets, which would be transferred to designated dealers of spent oil as advised by the HPCB
4.4 Other industrial process wastes Yes Process wastes shall be properly categorized and disposed as per norms
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes In this case sewage is treated through ETP process
4.7 Construction or demolition wastes Yes Solid waste during the construction phase would comprise mainly of excavated soil, stones, bricks which will be reclaimed to minimize the quantum of waste.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes DG sets
5.2 Emissions from production processes Yes stack emissions from process as provided in process technology
5.3 Emissions from materials handling including storage or transport Yes At the time of transportation, there will be fugitive dust which shall be kept under control through appropriate covers
5.4 Emissions from construction activities including plant and equipment Yes During constructional phase there will be fugitive emission from constructional equipments. Water sprinkling shall be done to minimize dust suppression.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust/odour would be generated during handling of construction materials, paints and varnishes. Adequate precautions shall be taken to reduce those impacts on construction workers and the surrounding environment.
5.6 Emissions from incineration of waste No No incineration of waste would be done
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No Burning of waste in open air would be done
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise would be generated during construction activity and during operational phase from DG sets Silent radiator cooled DG sets will be used which shall conform to noise standards set by CPCB.
6.2 From industrial or similar processes Yes All necessary engineering controls shall be deployed to keep the noise level as reasonably low
6.3 From construction or demolition Yes Noise would be generated during construction activity but adequate precautions shall be taken to reduce the noise generation.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Noise would be generated from vehicles entering the site during construction and operational phase
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous wastes generating from the project if any, shall be disposed as per the Hazardous Waste (Management and Handling Rules), 1989 amended from time to time
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No One Effluent Treatment plant of 10 KLD would be constructed for management of effluent
7.3 By deposition of pollutants emitted to air into the land or into water No Emission would be limited within the project boundary only. Broad leaved trees shall be planted which would serve as pollutant sink/buffer.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Fire alarm, fire fighting systems, fire hydrants would be installed. Fire protection and other safety measures are envisaged to take care of fire and explosion hazards and would be available as per specified norms. Besides there is also a fire station.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes According to the Indian Seismic Zone Map, Panchkula and adjoining areas is placed in Seismic Zone IV, which means high damage risk zone. Seismic Zone IV, which is classified as having a fairly high probability of earthquake shocks of magnitude 5 to 6 on the Richter scale and low probability of shocks of 6 to 7 on the Richter scale. The wind/cyclone hazard is of moderate risk. However, adequate structural precautions shall be taken as per NBC for high rise buildings.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting facilities/social infrastructures would be present inside the complex and lead to positive developments.
9.2 Lead to after-use of the site, which could have an impact on the environment No No environmental impact envisaged
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Industrial Area
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Kholhai Raitan Reserved Forest- 12 Km,(North) Pheasant Breeding Centre, Berwala (Bird Sanctuary) – 9.37 Km (North West), Tangri River- 0.65 Km,(East) Pond Near Alipur- 0.55 Km, (South)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Pheasant Breeding Centre, Berwala (Bird Sanctuary) – 9.37 Km (North West), Kholhai Raitan Reserved Forest- 12 Km,(North)
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH-73- 0.34 km,(West) Nekchand Rock Garden- 7.38 km (North), Ramgarh Fort- 8.10 km, (North West)
7 Defence installations Yes Indian Air Force- 9.23 km (North West)
8 Densely populated or built-up area Yes Khatauli- 2.4 Km (South East), Barwala - 5.33 km (South), Ambala- 8.0 km (South West), Bhagat Singh Nagar- 10 km (West),
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Panchkula Engineering College-8.0 km (South East), Mt. Litera Zee School- 2.0 km (North), Govt. College- 6.6 km (South), Alchemist Hospital- 11.5 km (North West), Raffels Hospital- 13 km (North West)
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Alipur is situated at a distance of 18 kilometers from Panchkula, 28 kilometers from Chandigarh towards South-East and 5 kilometers from Barwala Town. It falls in the Barwala industrially backward Block of District Panchkula. Panchkula lies in Seismic Zone IV. year 2010 witnessed very heavy rainfall in the entire district, which led to flooding of water in Panchkula
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameSUNTRIL PHARMACEUTICALS PVT LTD
DesignationDirector
Company SUNTRIL PHARMACEUTICALS PVT LTD
AddressPlot No: 219 HSIIDC, Alipur, Panchkula, Haryana
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print