| APPENDIX I | | (See Paragraph-6) | | CATEGORY - B | | | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | | (I)Basic Informations | | | Whether proposal involved violation of EIA notification | NA | | Weather Consent to Establishment Obtained | NA | | Upload copy of CTE | NA |
| | 1. | Name of the Project | M/s. Solvay Specialities India Private Limited | | Proposal No | SIA/GJ/IND2/30542/2018 |
| | 2. | Project Sector | Industrial Projects - 2 |
| | 3. | Location of the project | Plot No. 3526-27, GIDC Industrial Estate, Panoli-394116, Dist: Bharuch (Guj.) |
| | | | | 6. | State of the project | Gujarat | | | Details of State of the project |
|---|
| S.no | State Name | District Name | Tehsil Name |
|---|
| (1.) | Gujarat | Bharuch | Anklesvar | | | 7. | Town / Village | GIDC-Panoli | | | 8. | Plot/Survey/Khasra No. | Plot No. 3526-27 | | | 9. | S. No. in the schedule | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
|
| | 10. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | Proposed Capacity: 3500 MT/Month ha. | | | 11. | | New/Expansion/Modernization | Expansion | | MoEF file number(Previous EC) | SIA/GJ/IND2/30541/2018 | | Existing capacity/area etc. | 1440 ha. | | Uploaded EC letter | Annexure-Uploaded EC letter | | | | 12. | Category of project | B | | | 13. | Does it attract the general condition? If yes, please specify | No | | | 15. | Does it attract the specific condition? | No | | | 16. | Is there any litigation pending against the project? | No | | | 17. | Nearest railway station along with distance in kms. | Panoli, 2 km | | | 18. | Nearest airport along with distance in kms | Surat, 65 km | | | 19. | Nearest Town/City/District Headquarters along with distance in kms | Ankleshwar , 14 km | | | 20. | Distance of the project from nearest Habitation | 2 , 2 km | | | 21. | | Details of alternative sites examined shown on a toposheet | No | |
| | 22. | | Whether part of interlinked projects? | No | | | | 23. | | Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980? | No | | | | 24. | | Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972? | No | | | | 25. | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No |
| | 26. | | Whether there is any Government Order/Policy relevent/relating to the site? | No | |
| | 27. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | |
| | 28. | Project Cost(in Lac.) | 270000 |
|
| 30. | Whether the proposed project/activity located in notified Industrial area(Yes/No) | N/A |
| | 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Proposed Expansion activity is within the existing premises inside the GIDC Industrial Estate- Panoli. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Minor site clearance activities shall be carried out to clear shrubs and weed. | | 1.3 | Creation of new land uses? | No | -- | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | -- | | 1.5 | Construction works? | Yes | Please refer Annexure – II. | | 1.6 | Demolition works? | No | No demolition work is required. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | -- | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Please refer Annexure – II. | | 1.9 | Underground works including mining or tunneling? | No | -- | | 1.10 | Reclamation works? | No | Proposed Expansion will be carried out within the existing premises inside the GIDC Industrial Estate- Panoli. | | 1.12 | Offshore structures? | No | -- | | 1.13 | Production and manufacturing processes? | Yes | Please refer Annexure –III. | | 1.14 | Facilities for storage of goods or materials? | Yes | Proposed expansion activity is within the existing premises inside the GIDC Industrial Estate - Panoli. For Proposed expansion activity, additional raw material & finished products storage area will be developed. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | For details of liquid effluent, please refer Annexure-V.
For Hazardous waste detail please refer Annexure – VI. | | 1.16 | Facilities for long term housing of operational workers? | No | -- | | 1.17 | New road, rail or sea traffic during construction or operation? | No | -- | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | -- | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | -- | | 1.20 | New or diverted transmission lines or pipelines? | No | -- | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | -- | | 1.22 | Stream crossings? | No | -- | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Water requirement will be met through PanoliGIDC water supply. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | -- | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transportation of personnel or raw material and products will be primarily by road. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | -- | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | -- | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Temporarily during the construction activity | | 1.29 | Introduction of alien species? | Yes | Temporarily as a consultant during construction & erection activity. | | 1.30 | Loss of native species or genetic diversity? | No | -- | | 1.31 | Any other actions? | No | -- | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Proposed Expansion will be carried out within the existing premises inside the GIDC Industrial Estate- Panoli. | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water Source: Panoli GIDC Water Supply
For details please refer Annexure – IV. | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Construction materials, like steel, cement, crushed stones, sand, rubble, etc. will be required for the project shall be procured from the local market/suppliers. | | 2.5 | Forests and timber (source – MT) | No | -- | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Please refer Annexure – VII. | | 2.7 | Any other natural resources (use appropriate standard units) | No | -- | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Please refer Annexure –VIII. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | -- | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | The product enhancement will improve the welfare of the people by creating new employment. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | -- | | 3.5 | Any other causes | No | -- | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | -- | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The canteen waste shall be disposed to common Biogas plant at BEIL. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Please refer Annexure – VI. | | 4.4 | Other industrial process wastes | Yes | Please refer Annexure – VI. | | 4.5 | Surplus product | No | -- | | 4.6 | Sewage sludge or other sludge from effluent treatment | No | -- | | 4.7 | Construction or demolition wastes | No | -- | | 4.8 | Redundant machinery or equipment | No | -- | | 4.9 | Contaminated soils or other materials | No | -- | | 4.10 | Agricultural wastes | No | -- | | 4.11 | Other solid wastes | Yes | Please refer Annexure – VI. | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Please refer Annexure – VII. | | 5.2 | Emissions from production processes | Yes | Please refer Annexure – VII. | | 5.3 | Emissions from materials handling including storage or transport | No | -- | | 5.4 | Emissions from construction activities including plant and equipment | No | -- | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | -- | | 5.6 | Emissions from incineration of waste | No | -- | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | -- | | 5.8 | Emissions from any other sources | No | -- | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The Noise level will be within the prescribed limit. At noisy areas adequate preventive & control measures will be taken. No significant noise, vibration or emission of light & heat from the unit.
D.G. Set will be installed in a closed room and provided with acoustic enclosure. | | 6.2 | From industrial or similar processes | Yes | -- | | 6.3 | From construction or demolition | No | -- | | 6.4 | From blasting or piling | No | -- | | 6.5 | From construction or operational traffic | No | -- | | 6.6 | From lighting or cooling systems | No | -- | | 6.7 | From any other sources | No | -- | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | Please refer Annexure – VIII. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | For details please refer Annexure – V. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | -- | | 7.4 | From any other sources | No | -- | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | -- | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Please refer Annexure –VIII. | | 8.2 | From any other causes | No | -- | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | -- | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Please refer Annexure – IX. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | -- | | 9.3 | Set a precedent for later developments | No | NA | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | -- | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Proposed Expansion will be carried out within the existing premises inside the GIDC Industrial Estate- Panoli. | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | Proposed Expansion will be carried out within the existing premises inside the GIDC Industrial Estate- Panoli. | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | No protected area or sensitive species within 15 km from the proposed project boundary. | | 4 | Inland, coastal, marine or underground waters | No | -- | | 5 | State, National boundaries | No | River Narmada = 15 km | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Public transportation | | 7 | Defence installations | No | -- | | 8 | Densely populated or built-up area | No | Ankleshwar City around 15 km from the proposed project site. | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | No | NA | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | NA | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | NA | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | NA | | | (IV) | PROPOSED TERMS OF REFERENCE FOR EIA STUDIES | | | ADDITIONAL MULTIPLE ENTERIES | | (V) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge | | V.(i) | | Name | SOLVAY SPECIALITIES INDIA PRIVATE LIMITED | | Designation | SiteManager | | Company | SOLVAY SPECIALITIES INDIA PRIVATE LIMITED | | Address | Plot No. 3526-27, GIDC, Panoli, Dist: Bharuch |
|
|