APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notificationNA
Weather Consent to Establishment ObtainedNA
Upload copy of CTE NA
1.Name of the Project M/s. United Pestichem & Nonionics Pvt. Ltd
Proposal No SIA/GJ/IND2/11781/2016
2.Project Sector Industrial Projects - 2
3.Location of the project Plot no. 1680, GIDC, Sarigam, Tal. Umbergaon, Dist.-Valsad, Gujarat-396155.
4.
Shape of the project landPoint
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectGujarat
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)GujaratValsadUmbergaon
7.Town / VillageSarigam
8.Plot/Survey/Khasra No.Plot no. 1680, GIDC, Sarigam, Tal. Umbergaon, Dist.-Valsad, Gujarat-396155.
9.S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled • Proposed Product: Surfactants and Speciality Chemicals (i.e. Alkoxylates, Quaternary Ammonium Compounds, Phosphate Esters, Sulphates and/or Sulphonates, Esters, Sulphosuccinates.)” • Proposed capacity: 2700.00 MTPM • Total plot area is 5500 m2 for proposed project. Water requirement will be met from GIDC Water supply. ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Bhilad, 4.95 km
18. Nearest airport along with distance in kms Mumbai, 120 km
19. Nearest Town/City/District Headquarters along with distance in kms Sarigam , 2.90 km
20. Distance of the project from nearest Habitation 2.90 , 2.90 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 1231
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) N/A
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The company has procured plot for the proposed project which is locates in Notified Industrial Estate, GIDC Sarigam.
1.2 Clearance of existing land, vegetation and buildings? No --
1.3 Creation of new land uses? No Proposed barren land is used for Industrial activity
1.4 Pre-construction investigations e.g. bore houses, soil testing? No --
1.5 Construction works? Yes The construction activity will be carried out for plant, utilities & office building. We have prepared the Site Layout Plan showing the proposed activity. Environment Pre-Feasibility Report & Env. Mgt. plan – Page 8.
1.6 Demolition works? No There will be no demolition, underground, reclamation or dredging work.
1.7 Temporary sites used for construction works or housing of construction workers? No No temporary sites for construction work or housing of construction workers will be developed as local labour will be employed
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No There will be no demolition, underground, reclamation or dredging work.
1.9 Underground works including mining or tunneling? No There will be no demolition, underground, reclamation or dredging work.
1.10 Reclamation works? No There will be no demolition, underground, reclamation or dredging work.
1.11 Dredging? No There will be no demolition, underground, reclamation or dredging work.
1.12 Offshore structures? No There will be no demolition, underground, reclamation or dredging work.
1.13 Production and manufacturing processes? Yes Pls. refer Project Feasibility Report- Page no. 11.
1.14 Facilities for storage of goods or materials? Yes The raw materials will be stored in raw material storage area provided adequately.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes • Generated Hazardous solid waste will be disposed off to the TSDF site at Sarigam. • Domestic waste water will be disposed through septic tank and soak pit system. • Industrial waste water will be treated in the proposed adequate waste water treatment facilities and the treated waste water will be send to CETP, Sarigam.
1.16 Facilities for long term housing of operational workers? No Workers from the local/near-by areas will be employed.
1.17 New road, rail or sea traffic during construction or operation? No --
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No --
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No --
1.20 New or diverted transmission lines or pipelines? No --
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No --
1.22 Stream crossings? No --
1.23 Abstraction or transfers of water from ground or surface waters? No Water requirement will be met from GIDC Water supply.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No --
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes We shall hire personnel from local / nearby area only and the construction material will be obtained preferably from local traders and will be transported via roads. The sources of raw materials and machinery for operation will vary based on market driven forces, which will be transported via roads.
1.26 Long-term dismantling or decommissioning or restoration works? No --
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No --
1.28 Influx of people to an area in either temporarily or permanently? No --
1.29 Introduction of alien species? No --
1.30 Loss of native species or genetic diversity? No --
1.31 Any other actions? No --
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed project will be accommodated in the GIDC notified industrial estate.
2.2 Water (expected source & competing users) unit: KLD Yes Source : GIDC water supply line, Sarigam Fresh Water requirement for proposed project is 57 KL/Day. Please Refer Project Pre-Feasibility Report- Page no. -3 & 29.
2.3 Minerals (MT) No --
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Source : from local traders
2.5 Forests and timber (source – MT) No --
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Please Refer Project Pre-Feasibility Report- Page no-29.
2.7 Any other natural resources (use appropriate standard units) No --
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Please Refer Project Pre-Feasibility Report- Page no. 29.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No --
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Positive Desirable effects. There will be very good opportunity of employment generation directly and indirectly due to proposed new project. We anticipate employment @ 60 nos.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No --
3.5 Any other causes No --
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No --
4.2 Municipal waste (domestic and or commercial wastes) Yes The commercial waste generated from administration building will be sold to scrap vendors.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Please Refer Project Pre-Feasibility Report - Page no 35.
4.4 Other industrial process wastes Yes Same as above
4.5 Surplus product No --
4.6 Sewage sludge or other sludge from effluent treatment Yes Please Refer Project Pre-Feasibility Report - Page no 35.
4.7 Construction or demolition wastes No --
4.8 Redundant machinery or equipment No --
4.9 Contaminated soils or other materials No --
4.10 Agricultural wastes No --
4.11 Other solid wastes No --
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Please Refer Project Pre-Feasibility Report- Page no 34.
5.2 Emissions from production processes Yes The emission from production process are HCl gas and SO2 and Scrubber will be installed for control of process emission. Please Refer Project Pre-Feasibility Report- Page no 34 & 35.
5.3 Emissions from materials handling including storage or transport No No generation of emissions from material handling including storage or transport.
5.4 Emissions from construction activities including plant and equipment Yes Only Dusting will be generated during the construction phase, transportation of goods and materials. Dusting will subsided by spraying of water.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Only Dusting will be generated during the construction phase, transportation of goods and materials. Dusting will subsided by spraying of water.
5.6 Emissions from incineration of waste No --
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No --
5.8 Emissions from any other sources No --
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers No Noise will be generated from operation of equipment and it will be below the statutory norms.
6.2 From industrial or similar processes Yes Noise will be generated from industrial process and it will be below the statutory norms.
6.3 From construction or demolition Yes Noise Level at different sources is expected to be coming below acceptable limit.
6.4 From blasting or piling No --
6.5 From construction or operational traffic Yes Noise due to transportation of vehicles
6.6 From lighting or cooling systems No --
6.7 From any other sources Yes --
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Hazardous materials will be stored in an isolated area and all proper steps will be followed to prevent accidents.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes • The ETP will be installed for waste water generation from industrial activity. The treated waste water complying norms will be disposed off through GIDC underground pipeline to CETP. • Sewage will be disposed off through soak pit system.
7.3 By deposition of pollutants emitted to air into the land or into water Yes However, the emissions from utility section will be controlled with help of adequate chimney height. Moreover, the process emissions will be controlled with help of scrubber.
7.4 From any other sources No --
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No --
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes However, Hazardous materials will be stored in an isolated area and all proper steps will be followed to prevent accidents.
8.2 From any other causes No --
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No --
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No As the proposed project is of law magnitude no negative impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc.) • Housing development • Extractive industries • Supply industries
9.2 Lead to after-use of the site, which could have an impact on the environment No None Foreseen
9.3 Set a precedent for later developments No None Foreseen
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes The unit belongs to an area where other pharmaceutical and chemical industries are in operation in a close proximity. Pollution load of this industrial cluster may lead to cumulative negative impacts on surrounding. However, the unit belongs to a GIDC notified area.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No --
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Forest patches at Sarigam - 1.35 KM W D & NH Wild Life Sanctuary Approx. 15 km E
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No --
4 Inland, coastal, marine or underground waters Yes Coastal Area near Arabian Sea (13 Km W)
5 State, National boundaries No Dadra & Nagar Haveli – 7 Km E Daman – 8 km N
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Dadra & Nagar Haveli – 8.5 Km E Daman – 21 km N
7 Defence installations No --
8 Densely populated or built-up area Yes Vapi 12 Km
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Within 5 KM radius
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Arabian Sea (13 Km W) Daman Ganga River ( 7.00 Km NE) Darotha River (4.28 Km NE)
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No The unit belongs to Sarigam GIDC notified industrial area.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No --
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameUNITED PESTICHEM AND NONIONICS PVT LTD
DesignationDirector
Company UNITED PESTICHEM AND NONIONICS PVT LTD
AddressPlot No.1680 GIDC Sarigam Ta. Umbergaon Dist. Valsad pin 396 155
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print