Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) expansion of existing molasses based Distillery from 60 to 100 KLPD along with expansion of 2.2 MW to 4.0 MW Co- Generation Power Plant
(b)Name of the Company / Organisation GOBIND SUGAR MILLS LIMITED DISTILLERY UNIT
(c)Registered Address Village Khamaria Pandit, Aira Estate, Tehsil Dhaurahra, District Kheri, Uttar Pradesh,,Kheri,Uttar Pradesh-262701
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Alok saxena
(b)Designation (Owner/ Partner/ CEO) unithead
(c)Address Village Khamaria Pandit, Aim Estate, District Lakhimpur Kheri, Uttar Pradesh,,Dhaurahara,Kheri,Uttar Pradesh-262701
(d)Pin code 262701
(e)E-mail gobindsugarlimited12@gmail.com
(f)Telephone No. 7985-594398
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(g) Distilleries
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/IND2/49160/2015
(e)Master Proposal Number(Single Window) SW/134093/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 63E1
(b)Pincode 262701
(c)Bounded Latitudes (North)
From
Degree 81.0487
Minutes
Second
From
Degree 81.05578
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 27.4586
Minutes
Second
From
Degree 27.5130
Minutes
Second
(e)Survey of India Topo Sheet No. 63E1, 63A13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 129
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 84.65
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshKheriDhauraharaKhamaria Pandit
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/199/2015-IA-II(I)
(b)Date of Apply of EC 07 Aug 2015
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The Committee discussed the matter and concurred w
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. gsml/02/19
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery 100 KLD6040100Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery :100 KLD60 KLD40 KLD100 KLD.
(2.)Power Plant : 4.0 MW2.2 MW1.8 MW4.4 MW.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Oct 2019
(iv)Valid Upto 31 Dec 2020
(v)File No. 5471215
(vi)Application No. 5471215
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 165.71
(b) Funds Allocated for Environment Management (Capital) (in crores) 12.15
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 2.4856
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.25
(e) Funds Allocated for Environment Management Capital(%) 7.33
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 450
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 450
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses450Kilo Litre per DayThrough local suppliers via roadRoad0.4 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Sep 2019 To 15 Dec 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube92.369.892.2100
(2.)PM2.5Micro Gram per Meter Cube51.4135.0950.3960
(3.)NOxMicro Gram per Meter Cube20.0210.0419.8180
(4.)SO2Micro Gram per Meter Cube15.968.3915.8980
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l498364.75002000
(2.)TSSmg/l....
(3.)pHNA7.77.4515
(4.)Total Hardnessmg/l284212200600
(5.)Chloridesmg/l38.0182501000
(6.)Fluoridemg/l0.450.3411.5
(7.)Heavy MetalsALmg/l..0.030.2
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l1612C
(2.)DOmg/l8.28.0C
(3.)BODmg/l2.62.2C
(4.)pHNA7.47.4C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.143.970
(2.)Leq(Day)A-weighted decibels(dB(A))59.549.875
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare348.82326.33
(2.)K(Potassium)Kilogram per hectare188.4158.2
(3.)P(Phosphorus)Kilogram per hectare24.216.0
(4.)Electric ConductivityMillisiemens per Centimetre350214
(5.)pH7.26.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.95 To 9.66
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.48 To 7.26
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. .
(f)Date of Issue 09 Apr 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater6200.3Copy of Permission LetterPipelineTube Well.01 Dec 2019.
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process6281000multi-effect evaporator, Slop fired boiler, CPU, to achieve zero liquid dischargeReuse within the Plant & Recycling628
16.1.
(a)Total Waste Water Generation 628
(b)Total Discharged Water 0
(c)Total Reused Water 628
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshFly Ash13320Tons.RoadOthersash will be used as manure
(2.)Fermenter SludgeOthersFermenter Sludge20880Tons.RoadOthersSludge will be used as a manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube51.410.580.86852.27860
(2.)PM10Microgram per Meter Cube93.20.410.94193.241100
(3.)NOxMicrogram per Meter Cube20.020.521.4021.4280
(4.)SO2Microgram per Meter Cube15.960.481.7217.6880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerSlop723PM10,SO2,NOx
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Co-generation Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) .
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 3.165
    Total Land 3.165
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0.0240982
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0.0025552
(e)Settlements 0.0001676
(f)Industrial 00
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Plantation, Scrub Land, Inland and fallow 0.004579
    Total 0.0314
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.165.
Total 3.165
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNO Corridor OBSERVED IN STUDY AREA0.
(2.)CorridorsNO Corridor OBSERVED IN STUDY AREA0.
(3.)ESAsNO ESA OBSERVED IN STUDY AREA0.
(4.)ESZsNO ESZ OBSERVED IN STUDY AREA0.
(5.)NPANO NPA OBSERVED IN STUDY AREA0.
(6.)Critically Polluted AreaNO CPA OBSERVED IN STUDY AREA0.
(7.)WLSNO WLS OBSERVED IN STUDY AREA0.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites...
(2.)Defence Installations...
(3.)Forest...
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.165
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sharda River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.12
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 50
(e)No. of working days 360
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt.1.72NaN
(2.)Percentage of Total Project Area.35NaN
(3.)No. of Plants.3000NaN
(4.)Funds Allocated.1500000NaN
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe company has a separate Corporate Environmental Responsibility policy, which defines its principle of working in a socially responsible, ethical and environmental friendly manner.
(2.)FinancialThe project has positive direct and indirect employment. Manpower is required during construction and operation phase and also in other activities such as transportation, day to day operations etc
(3.)SocialThe proposed CER Cost is Rs248.565 Lakhs (1.5 % of capital investment), as per office memorandum no. F.No.22-65/2017-IA.III dated 1st May 2018 as project is brown field (expansion case).
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0050
(ii)Name of the EIA Consultant Environmental and Technical Research Centre
(iii)Address 4/57 Vipul Khand, Gomti Nagar, Lucknow
(iv)Mobile No. 9454721732
(v)Landline No. 125789564
(vi)Email Id anshumaan110@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 Aug 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAlok saxena
Designationunithead
Name of Company (Applicant Name should not be given here)GOBIND SUGAR MILLS LIMITED DISTILLERY UNIT
AddressVillage Khamaria Pandit, Aira Estate, Tehsil Dhaurahra, District Kheri, Uttar Pradesh
Print