Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Common Effluent Treatment Plant for Tannery Cluster
(b)Name of the Company / Organisation JAJMAU TANNERY EFFLUENT TREATMENT ASSOCIATION
(c)Registered Address KLC Complex, Ground Floor, KNP-LKO Highway, Banthar, Unnao, Uttar Pradesh,,Kanpur Nagar,Uttar Pradesh-209801
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Rizwan Nadri
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address KLC Complex, Ground Floor, KNP-LKO Highway, Banthar, Unnao, Uttar Pradesh,,Bilhaur,Kanpur Nagar,Uttar Pradesh-209801
(d)Pin code 209801
(e)E-mail nadririzwan@yahoo.com
(f)Telephone No. 0-49281360
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/MIS/46723/2019
(e)Master Proposal Number(Single Window) SW/126103/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. -
(b)Pincode 208008
(c)Bounded Latitudes (North)
From
Degree 2921398.95
Minutes
Second
From
Degree 2921925.60
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 442433.11
Minutes
Second
From
Degree 442664.79
Minutes
Second
(e)Survey of India Topo Sheet No. 63 B/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 125
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.24
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshKanpur NagarKanpurJajmau
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 346/Parya/SEAC/4445/2019
(c)Date of Apply of TOR 05 Sep 2019
(d)Date of Issue of TOR / Standard ToR 16 Nov 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason under clause 7(i) (III) of EIA Notification.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CETP20 MLD
(2.)CCRU900 KLD
(3.)Pilot Plant (ZLD)200 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CCRU900Kilo Litre per DayRoad
(2.)CETP20Million Liters per DayOthersPipelines
(3.)Pilot Plant (ZLD)200Kilo Litre per DayOtherspipelines
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Nov 2019
(iv)Valid Upto 02 Nov 2019
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 465.38
(b) Funds Allocated for Environment Management (Capital) (in crores) 36.5
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 6.98
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 8
(e) Funds Allocated for Environment Management Capital(%) 7.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulphuric Acid949Tons per Annumopen marketRoad10 Open MarketCopy of Linkage
(2.)Alum6205OthersTonsopen MarketRoad10 Open MarketCopy of Linkage
(3.)Sodiumhydroxide365Tons per Annumopen MarketRoad10 Open MarketCopy of Linkage
(4.)Lime31390OthersTonsopen MarketRoad10 Open MarketCopy of Linkage
(5.)Polyelectrolyte21.17Otherstonsopen MarketRoad10 Open MarketagreementCopy of Linkage
(6.)Soda Ash10220Tons per Annumopen MarketRoad10 Open MarketCopy of Linkage
(7.)MgO474.5Tons per Annumopen MarketRoad10 Open MarketCopy of Linkage
(8.)Tannery effluent7300OthersMLmember unitsOthersPipelines1 OthersagreementCopy of Linkage
(9.)Chrome Effluent328500OthersKLmember unitsRoad1 OthersagreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube44.733.241.880
(2.)PM10Micro Gram per Meter Cube164.5121.8153.4100
(3.)PM2.5Micro Gram per Meter Cube57.542.653.760
(4.)SO2Micro Gram per Meter Cube16.011.814.880
(5.)OthersCOMili Gram per Meter Cube0.90.70.84
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2605324.25002000
(2.)Total Hardnessmg/l1120180200600
(3.)pHNA7.86.86.58.5
(4.)TSSmg/l0000
(5.)Chloridesmg/l739.8322501000
(6.)Fluoridemg/l1.710.5611.5
(7.)OthersNitratemg/l61.970.864545
(8.)Heavy MetalsNimg/l0.0610.0250.020.02
    14.3.     No. of Surface Water Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.14.65E
(2.)BODmg/l1081E
(3.)CODmg/l120016E
(4.)pHmg/l8.17.31E
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))64.846.170
(2.)Leq(Day)A-weighted decibels(dB(A))70.651.375
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH87.4
(2.)K(Potassium)Milligram per Kilogram13.60.4
(3.)Electric ConductivityMillisiemens per Centimetre472.8109.2
(4.)N(Nitrogen)Milligram per Kilogram92.436.6
(5.)P(Phosphorus)Milligram per Kilogram31.71.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.2 To 27.13
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.08 To 27.13
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersJal Nigan Supply31Copy of Permission LetterPipelineOthersJal Nigam supply001 Nov 20193
(2.)OthersSTP Treated water1731Copy of Permission LettermodeOthersNearby STPOthersSTP Treated water001 Nov 2019205
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2.520000CETPGreen Belt Renewal Plant2.5
16.1.
(a)Total Waste Water Generation 2.5
(b)Total Discharged Water 0
(c)Total Reused Water 2.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio-sludge from Biological TreatmentHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2920Tons10RoadOthershorticulture after TCLP analysis
(2.)Sludge from pre settling tankHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4124.5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)chemical sludge from LSS type reactorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)22447.5Tons10RoadOtherscement manufactures
(4.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1825Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.44Kilolitre10RoadAuthorized Recyclers
(6.)BiodegradableMunicipal Solid Waste2.92Tons10RoadSanitary Landfills
(7.)Non biodegradable wasteMunicipal Solid Waste1.46Tons10RoadAuthorized Recyclers
(8.)Chemical sludge from Clari- flocculatorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)19783Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube38.50.25240.680
(2.)PM2.5Microgram per Meter Cube49.40.251.7451.1560
(3.)Others(Specify)COMicrogram per Meter Cube8000.2548044000
(4.)PM10Microgram per Meter Cube141.30.252143.4100
(5.)SO2Microgram per Meter Cube13.60.250.714.380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)12x1000 DG SetLSD300.3NOx0.326
(2.)1.5 TPH BoilerCoal300.8SO20.014
(3.)1.5 TPH BoilerCoal300.8OthersCO0.136
(4.)12x1000 kVA DG SetLSD300.3PM100.214
(5.)1.5 TPH BoilerCoal300.8PM2.5 ,Others0.02
(6.)12x1000 kVA DG SetLSD300.3OthersCO0.204
(7.)1.5 TPH BoilerCoal300.8PM100.036
(8.)12x1000 kVA DG SetLSD300.3SO20.108
(9.)1.5 TPH BoilerCoal300.8NOx0.085
(10.)12x1000 kVA DG Set1LSD300.3PM2.50.169
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9400
(b)Source state distribution company (DISCOM)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 12 nos* 1010 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 11.65
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 11.65
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 19918.29
(b)Waste/Barren Land 89.03
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1503.19
(e)Settlements 11241.8
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : scrub and sandy area 746.02
    Total 33498.329999999994
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant5.320 MLD CETP. 900 KLD CCRU 200 KLD ZLD Plant
(2.)Green belt3.84
(3.)Area for Solid Waste Management0.15salt and sludge area
(4.)Othersadmin building sub station etc2.36
Total 11.65
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0none
(2.)ESZsNone0None
(3.)WLSNone0None
(4.)NPANone0None
(5.)CorridorsNone0None
(6.)Wildlife CorridorsNone0None
(7.)ESAsGanga river0.24NE direction
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None
(2.)OthersWater BodyGanga river0.24NE
(3.)Defence InstallationsNone0None
(4.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.65
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0.24
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 68
(e)No. of working days 330
(f)Total Manpower 168
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 3.84
(b)Percentage of Total Project Area 32.96
(c)No. of Plants to be Planted 5775
(d)Funds Allocated for Plantation 40000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental3.84 ha (i.e. 33% of total plot area) as Green Area which shall reduce pollution load in nearby areas.
(2.)SocialTHe project will help in direct and indirect Employment generation
(3.)FinancialRevenue and tax generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 11.65
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 50 ECS
5.
Energy Saving Measures:
(a)Source/Mode 0
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will not be any abstraction of Ground water
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0987
(ii)Name of the EIA Consultant SHIVALIK SOLID WASTE MANAGEMENT LIMITED
(iii)Address 2nd Floor , SCO 20-21, Near Hotel Dolphin, Zirakpur, Punjab-140604
(iv)Mobile No. 9316028131
(v)Landline No. 0176250949
(vi)Email Id infoshivalikeia@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)15/12/2019In view of above, Hon'ble NGT order passed in O.A. No. 1038/2018 dated 14/11/2019 an affidavit with google map from project proponent/consultant should be submitted and clearly mentioned that the project area is not in whole or in part, in or within five kilometres from the boundary of critically polluted areas or severely polluted area.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRizwan Nadri
DesignationDirector
Name of Company (Applicant Name should not be given here)JAJMAU TANNERY EFFLUENT TREATMENT ASSOCIATION
AddressKLC Complex, Ground Floor, KNP-LKO Highway, Banthar, Unnao, Uttar Pradesh
Print