1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Construction of 4 lane Bundelkhand Expressway (expandable to 6 lane) | (b)Name of the Company / Organisation | UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) | (c)Registered Address | Second Floor, Paryatan Bhawan,C-13, Vipin Khand, Gomti Nagar,Lucknow,Chhattisgarh-226010 | (d)Legal Status of the Company | State PSU | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjay Chawla | (b)Designation (Owner/ Partner/ CEO) | SDM, UPEIDA | (c)Address | Second Floor, Paryatan Bhawan,C-13, Vipin Khand, Gomti Nagar,Lucknow,Lucknow,Uttar Pradesh-226010 | (d)Pin code | 226010 | (e)E-mail | paldebashis@rediffmail.com | (f)Telephone No. | 522-2307542 | (g)Fax No. | 05224013560 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 7(f) Highways
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/UP/NCP/45255/2019 | (e)Master Proposal Number(Single Window) | SW/122614/2019 | (f)EAC concerned (for category A Projects only) | INFRA-1 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 182 villages | (b)Pincode | 210205 | (c)Bounded Latitudes (North) | | From | | Degree | 251258.59 | Minutes | | Second | | From | | Degree | 804518.50 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 265433.56 | Minutes | | Second | | From | | Degree | 791953.55 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G44O1, G44O11, G44O7, G44O6, G44O2, G44N14, G44N10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 164 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 111.321 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Uttar Pradesh | Chitrakoot | Karwi | Gonda | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | SIA/(UP)/MIS/30619/2019 | (c)Date of Apply of TOR | 09 Jan 2019 | (d)Date of Issue of TOR / Standard ToR | 10 May 2019 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project Exempted from Public Hearing by commitee | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Bundelkhand Expressway | 296.070 Km | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | New Greenfield Expressway | 296.070 | Kilometers | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 8869.52 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 100 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 2 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.55 | (e) Funds Allocated for Environment Management Capital(%) | 1.13 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 80644570 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 80644570 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Water | 13270 | Others | KLD | Surface and ground water | Road | | 50 | Linkage | | Copy of Linkage | (2.) | Cement | 23333 | Tons per Annum | | Authorized Vendors | Road,Rail | | 50 | Open Market | | Copy of Linkage | (3.) | Soil | 2333333 | Others | cum | Nearby Borrow Area | Road | | 2 | Open Market | | Copy of Linkage | (4.) | Bitumen | 43333 | Tons per Annum | | Authorized Vendors | Road | | 200 | Open Market | | Copy of Linkage | (5.) | Plastic Waste | 433 | Tons per Annum | | Authorized Vendors | Road | | 100 | Open Market | | Copy of Linkage | (6.) | Aggregates | 2600000 | Others | cum | Approved Quarry sites | Road | | 26 | Open Market | | Copy of Linkage | (7.) | Fly Ash | 333333 | Tons per Annum | | Authorized Vendors | Road,Rail | | 300 | Open Market | | Copy of Linkage | (8.) | Sand | 30000 | Others | cum | Sand Quarries | Road | | 2 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 29 Oct 2018 To 20 Jan 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 11.6 | 6.1 | 11.33 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 32.0 | 15.5 | 30.98 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.96 | 0.15 | 0.84 | 2 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 88 | 40 | 85.3 | 60 | (5.) | PM10 | | Micro Gram per Meter Cube | 166 | 75 | 163.3 | 100 | |
14.2. No. of Ground Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1040 | 268 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 1.8 | 0.32 | 1 | 1.5 | (3.) | Others | Nitrate | | mg/l | | 18.4 | 0.5 | 45 | 45 | (4.) | Heavy Metals | | Dissolved Iron | mg/l | | 0.29 | 0.2 | 0.3 | 0.3 | (5.) | Total Hardness | | | mg/l | | 330 | 106 | 200 | 600 | (6.) | TSS | | | mg/l | | 2.5 | 2.5 | 500 | 2000 | (7.) | Chlorides | | | mg/l | | 141 | 5.6 | 250 | 1000 | (8.) | pH | | | NA | | 8.3 | 7.5 | 8.5 | 8.5 | |
14.3. No. of Surface Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 3.2 | 2 | D | (2.) | Others | Flouride | mg/l | | 1 | 0.1 | D | (3.) | pH | | NA | | 8.33 | 7.96 | D | (4.) | DO | | mg/l | | 6.1 | 5.1 | C | (5.) | COD | | mg/l | | 14 | 4 | D | |
14.4. No. of Ambient Noise Monitoring Locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.14 | 43.4 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.2 | 34.6 | 55 | |
14.5. No. of Soil Sample Monitored Locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | us/cm | 1018 | 171 | (2.) | K(Potassium) | Milligram per Kilogram | | 695 | 101 | (3.) | pH | | | 10.20 | 7.6 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 258 | 90 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 49 | 4.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.56 To 37.90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.95 To 37.75 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 7.35 | 1 | Not Appliacble | Pipeline | | Others | River | NA | 23 Oct 2019 | 7.35 | (2.) | GroundWater | | 3.15 | 1 | Not Appliacble | Pipeline | | Others | Bore well | NA | 23 Oct 2019 | 3.15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 10.5 | 10.5 | Septic Tanks with Soak pit | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 10.5 | | |
|
16.1. | (a)Total Waste Water Generation | 10.5 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 10.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Surplus Earth | Construction & Demolition Waste | | 2600000 | Tons | 26 | Road | | Others | For disposal at low lying areas | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 166 | 1 | 2.4 | 168.4 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 88 | 1 | 1.4 | 89.4 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 11.6 | 1 | 0.4 | 12 | 80 | (4.) | Others(Specify) | CO | Microgram per Meter Cube | 870 | 1 | 800 | 1670 | 4000 | (5.) | NOx | | Microgram per Meter Cube | 40.8 | 1 | 0.01 | 40.81 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | Diesal | 15 | 0.25 | PM10 | | 30 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | State Power Distribution Company | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | (1)250KV -2 nos (2)125KVA-2nos (3)415V-12nos | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 74.9070 | (b)Private Land | 3149.6601 | (c)Government Land | 21.1124 | (d)Revenue Land | 373.0915 | (e)Other Land | 0 | Total Land | 3618.771 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 3145.3805 | (b)Waste/Barren Land | 388.474 | (c)Grazing/ Community Land | 2.2047 | (d)Surface Water Bodies | 7.8048 | (e)Settlements | 0 | (f)Industrial | 0 | (g)Forest | 74.9070 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : NA | 0 | Total | 3618.771 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Others | Road construction along within ROW | 2961.971 | | (2.) | Green belt | | 656.80 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None | (2.) | ESZs | None | 0 | None | (3.) | Wildlife Corridors | None | 0 | None | (4.) | Corridors | None | 0 | None | (5.) | Critically Polluted Area | None | 0 | None | (6.) | ESAs | None | 0 | None | (7.) | NPA | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | RF and PF | 0 | None | (2.) | Archaeological Sites | | None | 0 | None | (3.) | Defence Installations | | None | 0 | None | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 3321.0206 | (b)Land yet to be acquired(Ha) | 297.7504 | (c)Status of Land acquisition if not acquired | Under Process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 182 | (b)No. of Households | 82 | (c)No. of PDFs (Project Displaced Families) | 82 | (d)No. of PAFs (Project Affected Families) | 76 | (e)Funds Allocated for R&R(in Rs) | 251258 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Barwa Nalla, Baghain River, Badra Nalla, Sahewa Nalla, Ursa Nalla, Ken River, Shyama River, Chandrawal River, Birma River, Betwa River, Yamuna River, Sengar River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | 8 rivers, 15 ponds | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 1500 | (b)Permanent Employment-During Operation | 300 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 1095 | (f)Total Manpower | 2300 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 656.87 | (b)Percentage of Total Project Area | 18.15 | (c)No. of Plants to be Planted | 270000 | (d)Funds Allocated for Plantation | 409600000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (2.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (3.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (4.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (5.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (6.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (7.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | (8.) | Environmental | The proposed Bundelkhand project will ensure the smooth flow of traffic, which reduces the emissions and noise level. Apart from these, plantation will be carried out throughout the project road, whic | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 4 | (b)Total No. of Flats to be Build | 1 | (c)No. of Buildings | 6 | (d)Total plot area (sqm) | 1920 | (e)Total built up area (sqm) | 1920 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 592 | Capacity | 93.24 | (b)No. of Recharge Pits | 592 | Capacity | 93.24 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 4 wayside amenities with parking of 50 each | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar | (b)Percentage | 30 | (c)Quantity | 1000 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 296.070 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 167 | (b)Total No. of ROB | 4 | (c)Total No. of Interchanges | 13 | (d)Total No. of Flyovers | 18 | (e)Total No. of Vehicle Underpass | 115 | (f)Total No. of Pedestrian Underpass | 98 | (g)Details of other utilities rail and road corridors | DVVNL 33 KV Line: 20 11 KV Line: 236 LT Line; 7 T/ | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA077 | (ii)Name of the EIA Consultant | M/s Vardan Environet | (iii)Address | D-142, Sushant Lok III, Golf Course Extension Road , Sector 57, Gurgaon, Haryana | (iv)Mobile No. | 9953147226 | (v)Landline No. | 0124434375 | (vi)Email Id | info@vardanenvironet.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 25/10/2019 | Please submit the final EIA Report and cover letter. | | (2.) | 25/10/2019 | The correction have been made as per the instruction received | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjay Chawla | Designation | SDM, UPEIDA | Name of Company (Applicant Name should not be given here) | UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) | Address | Second Floor, Paryatan Bhawan |
|