|
| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Capacity Expansion of LPG Bottling Plant from 1063MT to 1963MT, Rati Ka Nagla, Salempur, Tehsil: Sikandra Rau, Dist: - Hathras, UP | | (b)Name of the Company / Organisation | BPCL SALEMPUR | | (c)Registered Address | BPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP,,Hathras,Uttar Pradesh-204212 | | (d)Legal Status of the Company | Central PSU | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Prakash Meena | | (b)Designation (Owner/ Partner/ CEO) | TM | | (c)Address | BPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP,Hathras,Uttar Pradesh-204212 | | (d)Pin code | 204212 | | (e)E-mail | lpgsalempur@gmail.com | | (f)Telephone No. | 124-4291036 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| | (b)Minor Project/Activity | NIL | | (c)Category | B1 | | (d)Proposal Number | SIA/UP/IND2/36004/2003 | | (e)Master Proposal Number(Single Window) | SW/104989/2019 | | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (g)Project Type | Expansion |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | 59M, 60M, 61-67, 68M, 69M, 75M, 76, 77M, 78M, 79, | | (b)Pincode | 204212 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 273955.6 | | Minutes | | | Second | | | From | | | Degree | 273956 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 781452.1 | | Minutes | | | Second | | | From | | | Degree | 781507.2 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | 54I/1,54I/2, 54I/5, 54I/6 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 252 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 50 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Uttar Pradesh | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Uttar Pradesh | Hathras | Sikandra Rao | Rati Ka Nagla | |
|
| 6. | | Details of Terms of Reference (ToR)/EC: | | (a)MoEF&CC / SEIAA File Number | 679/parya/SEAC/4550/2018 | | (b)Date of Apply of EC | 01 Jan 2003 | | (c)Date of Issue of EC | 31 Dec 1899 | | (d)Previous EC Letter | Copy of Previous EC letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (b)Reason | project is in notified industrial area so Public H | | (c)Supporting Document | Copy of Supporting Document | |
|
| 8. | | Details of Project Configuration/Product: | | Details Not Applicable | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | (a)Details of certified report on compliance of earlier environmental clearance condition | | (i)Certified Compliance By | PCC | | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | | (iii)Letter No. | 4227 | | (iv)Status of Compliance | Compiled | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | | (vi)Date of site visit | N/A | | (b)Details of Capacity Expansion | |
|
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | LPG bottling | 1063 | 900 | 1963 | Others | MT | Road,Rail | | |
| | | (c)Details of Configuration | |
|
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
|---|
| (1.) | LPG bottling | 1063 | 9000 | 1963 | | |
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | 01 Jan 2018 | | (iv)Valid Upto | 31 Dec 2019 | | (v)File No. | 3772 | | (vi)Application No. | zero | | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in crores) | 28.48 | | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.21 | | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.28 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.16 | | (e) Funds Allocated for Environment Management Capital(%) | 0.00 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 900 | | (b)Existing quantity of raw material/fuel | 1063 | | (c)Total quantity of raw material/fuel | 1963 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | LPG | 23556 | Tons per Annum | | From Dahej via trucks | Road,Rail | | 1500 | MoU | | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | | (b)Season | Post-Monsoon | |
|
| 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM10 | | Micro Gram per Meter Cube | 83.6 | 55.4 | 67.9 | 100 | | (2.) | NOx | | Micro Gram per Meter Cube | 33.4 | 12.1 | 28.37 | 80 | | (3.) | PM2.5 | | Micro Gram per Meter Cube | 42.8 | 23.5 | 34.95 | 60 | | (4.) | SO2 | | Micro Gram per Meter Cube | 18.9 | 1.0 | 15.85 | 80 | |
| 14.2. No. of Ground Water Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | TDS | | | mg/l | | 756 | 380 | 500 | 2000 | | (2.) | Total Hardness | | | mg/l | | 249.6 | 139.5 | 200 | 600 | | (3.) | Chlorides | | | mg/l | | 148 | 63.11 | 250 | 1000 | | (4.) | Fluoride | | | mg/l | | 0.88 | 0.41 | 1.0 | 1.5 | | (5.) | Heavy Metals | | Hg | mg/l | | 0 | 0 | 0.001 | 0.001 | | (6.) | pH | | | NA | | 8.03 | 7.15 | 6.5 | 8.5 | | (7.) | TSS | | | mg/l | | 138 | 48.3 | 2540 | 2540 | |
| 14.3. No. of Surface Water Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | pH | | NA | | 8.08 | 7.09 | A | | (2.) | COD | | mg/l | | 39.46 | 14.50 | A | | (3.) | DO | | mg/l | | 6.2 | 4.6 | A | | (4.) | BOD | | mg/l | | 14.76 | 4.5 | A | |
| 14.4. No. of Ambient Noise Monitoring Locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.98 | 40.81 | 70 | | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.2 | 48.58 | 75 | |
| 14.5. No. of Soil Sample Monitored Locations : 8 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | pH | | | 8.24 | 7.38 | | (2.) | N(Nitrogen) | Kilogram per hectare | | 310 | 220 | | (3.) | P(Phosphorus) | Kilogram per hectare | | 26.21 | 18.23 | | (4.) | K(Potassium) | Kilogram per hectare | | 273.10 | 125 | | (5.) | Electric Conductivity | Others | ?S/cm | 0.408 | 0.318 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 17.03 To 3.54 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.82 To 17.70 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | GroundWater | | 19 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/6851/UP/IND/2019 | 06 Mar 2019 | 44 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | waste water | 10 | 10 | STP | Green Belt Renewal Plant | | 10 | | |
|
| 16.1. | | (a)Total Waste Water Generation | 10 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 10 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | litter | Municipal Solid Waste | | 0 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | SO2 | | Microgram per Meter Cube | 18.9 | 3 | 0.04182 | 18.94182 | 80 | | (2.) | PM2.5 | | Microgram per Meter Cube | 42.8 | 0 | 0 | 0 | 60 | | (3.) | NOx | | Microgram per Meter Cube | 33.4 | 3.6 | 0.01381 | 33.41381 | 80 | | (4.) | PM10 | | Microgram per Meter Cube | 83.6 | 3.5 | 0.00187 | 83.60187 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | D.G. set (380KVA) | HSD | 5 | 0.2 | SO2 | | 0.030611 | | (2.) | D. G. set (320KVA) | HSD | 5 | 0.2 | PM10 | | 1.031E-03 | | (3.) | D.G. set(320KVA) | HSD | 5 | 0.2 | SO2 | | 0.025778 | | (4.) | D.G. set (125KVA) | HSD | 5 | 0.2 | PM10 | | 4.028E-04 | | (5.) | D.G. set(125KVA) | HSD | 5 | 0.2 | NOx | | 0.002083 | | (6.) | D.G. set (380KVA) | HSD | 5 | 0.2 | NOx | | 0.002083 | | (7.) | D.G. set (320KVA) | HSD | 5 | 0.2 | NOx | | 0.002083 | | (8.) | D.G.set (125KVA) | HSD | 5 | 0.2 | SO2 | | 0.010089 | | (9.) | D.G. set (380 KVA) | HSD | 5 | 0.2 | PM10 | | 1.224E-03 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | | (b)Source | Uttar Pradesh Electricity Board | | (c)Uploaded Copy of Agreement | Copy of Agreement | | (d)Standby Arrangement (Details of DG Sets) | D.G. sets of 380 KVA,320 KVA,125KVA | | (e)Stack Height (in m) | 5 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land | 0 | | (b)Private Land | 15.98 | | (c)Government Land | 0 | | (d)Revenue Land | 0 | | (e)Other Land | 0 | | Total Land | 15.98 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area | 10208 | | (b)Waste/Barren Land | 646 | | (c)Grazing/ Community Land | 4383 | | (d)Surface Water Bodies | 230 | | (e)Settlements | 1419 | | (f)Industrial | 0 | | (g)Forest | 5607 | | (h)Mangroves | 0 | | (i)Marine Area | 0 | | (j)Others : open shrubs | 10614 | | Total | 33107 | |
|
| 22. Land Requirement for Various Activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
|---|
| (1.) | Green belt | | 6.28 | | | (2.) | Main Plant | | 1.5 | | | (3.) | Others | road, open area, proposed expansion etc. | 8.2 | | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | WLS | no WLS with in 10 kms | 0 | not applicable | | (2.) | ESZs | not applicable | 0 | not applicable | | (3.) | Wildlife Corridors | not applicable | 0 | not applicable | | (4.) | Critically Polluted Area | not applicable | 0 | not applicable | | (5.) | Corridors | not applicable | 0 | not applicable | | (6.) | NPA | not applicable | 0 | not applicable | | (7.) | ESAs | not applicable | 0 | not applicable | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Archaeological Sites | | not applicable | 0 | not applicable | | (2.) | Defence Installations | | not applicable | 0 | not applicable | | (3.) | Forest | | not applicable | 0 | not applicable | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 15.98 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | total land is under the possession | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in Rs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | Pavo cristatus, and Antilope antilope. | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | | (i)Uploaded copy of conservation plan | Copy of conservation plan | | (ii)Fund Provision made | 15 lakhs | | (iii)Period of Implementation | 5 years | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 26 | | (c)Temporary Employment- During Construction | 0 | | (d)Temporary Employment- During Operation | 150 | | (e)No. of working days | 330 | | (f)Total Manpower | 176 | |
|
|
| S. No. | Description | Existing | Proposed | Total |
|---|
| (1.) | Total Area of Green Belt | 6.28 | 0 | 6 | | (2.) | Percentage of Total Project Area | 39.31 | 0 | 39 | | (3.) | Funds Allocated | 0 | 20000 | 20000 | | (4.) | No. of Plants | 31000 | 500 | 31500 | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Social | The proposal for installation of LPG Bottling plant will be able to cater the demand of LPG in nearby areas of Salempur, Uttar Pradesh & also adhere to the Govt. of India initiative of supplying LPG t | | (2.) | Financial | It provided direct employment to approx. 26 people due to capacity expansion project. Further, it may also provide in direct employment to 150 persons | | (3.) | Environmental | 2.8 crores CER budget allocate by company | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details : NOT APPLICABLE |
| 35. Sector Specific Details For Industrial Projects - 2 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1619/RA0037 | | (ii)Name of the EIA Consultant | Vardan Environet | | (iii)Address | D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. road, Sec-57, Gurgaon-122001, India | | (iv)Mobile No. | 9971684812 | | (v)Landline No. | 0124429103 | | (vi)Email Id | industry@vardanenvironet.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 2 | | (ix)Validity of Accreditation | 09 Nov 2019 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | |
| Addtional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Prakash Meena | | Designation | TM | | Name of Company (Applicant Name should not be given here) | BPCL SALEMPUR | | Address | BPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP |
|