(a)Name of the project(s) Capacity Expansion of LPG Bottling Plant from 1063MT to 1963MT, Rati Ka Nagla, Salempur, Tehsil: Sikandra Rau, Dist: - Hathras, UP
(b)Name of the Company / Organisation BPCL SALEMPUR
(c)Registered Address BPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP,,Hathras,Uttar Pradesh-204212
(d)Legal Status of the Company Central PSU
2.
Address for the correspondence:
(a)Name of the Applicant Prakash Meena
(b)Designation (Owner/ Partner/ CEO) TM
(c)Address BPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP,Hathras,Uttar Pradesh-204212
(d)Pin code 204212
(e)E-mail lpgsalempur@gmail.com
(f)Telephone No. 124-4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/IND2/36004/2003
(e)Master Proposal Number(Single Window) SW/104989/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 59M, 60M, 61-67, 68M, 69M, 75M, 76, 77M, 78M, 79,
(b)Pincode 204212
(c)Bounded Latitudes (North)
From
Degree 273955.6
Minutes
Second
From
Degree 273956
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 781452.1
Minutes
Second
From
Degree 781507.2
Minutes
Second
(e)Survey of India Topo Sheet No. 54I/1,54I/2, 54I/5, 54I/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 252
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshHathrasSikandra RaoRati Ka Nagla
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 679/parya/SEAC/4550/2018
(b)Date of Apply of EC 01 Jan 2003
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason project is in notified industrial area so Public H
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By PCC
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 4227
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG bottling10639001963OthersMTRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)LPG bottling106390001963
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 3772
(vi)Application No. zero
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 28.48
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.21
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.28
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.16
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 900
(b)Existing quantity of raw material/fuel 1063
(c)Total quantity of raw material/fuel 1963
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LPG23556Tons per AnnumFrom Dahej via trucksRoad,Rail1500 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube83.655.467.9100
(2.)NOxMicro Gram per Meter Cube33.412.128.3780
(3.)PM2.5Micro Gram per Meter Cube42.823.534.9560
(4.)SO2Micro Gram per Meter Cube18.91.015.8580
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7563805002000
(2.)Total Hardnessmg/l249.6139.5200600
(3.)Chloridesmg/l14863.112501000
(4.)Fluoridemg/l0.880.411.01.5
(5.)Heavy MetalsHgmg/l000.0010.001
(6.)pHNA8.037.156.58.5
(7.)TSSmg/l13848.325402540
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.087.09A
(2.)CODmg/l39.4614.50A
(3.)DOmg/l6.24.6A
(4.)BODmg/l14.764.5A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))48.9840.8170
(2.)Leq(Day)A-weighted decibels(dB(A))63.248.5875
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.247.38
(2.)N(Nitrogen)Kilogram per hectare310220
(3.)P(Phosphorus)Kilogram per hectare26.2118.23
(4.)K(Potassium)Kilogram per hectare273.10125
(5.)Electric ConductivityOthers?S/cm0.4080.318
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 17.03 To 3.54
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.82 To 17.70
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater190Copy of Permission LetterPipelineTube Well21-4/6851/UP/IND/201906 Mar 201944
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)waste water1010STPGreen Belt Renewal Plant10
16.1.
(a)Total Waste Water Generation 10
(b)Total Discharged Water 0
(c)Total Reused Water 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)litterMunicipal Solid Waste0Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube18.930.0418218.9418280
(2.)PM2.5Microgram per Meter Cube42.800060
(3.)NOxMicrogram per Meter Cube33.43.60.0138133.4138180
(4.)PM10Microgram per Meter Cube83.63.50.0018783.60187100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G. set (380KVA)HSD50.2SO20.030611
(2.)D. G. set (320KVA)HSD50.2PM101.031E-03
(3.)D.G. set(320KVA)HSD50.2SO20.025778
(4.)D.G. set (125KVA)HSD50.2PM104.028E-04
(5.)D.G. set(125KVA)HSD50.2NOx0.002083
(6.)D.G. set (380KVA)HSD50.2NOx0.002083
(7.)D.G. set (320KVA)HSD50.2NOx0.002083
(8.)D.G.set (125KVA)HSD50.2SO20.010089
(9.)D.G. set (380 KVA)HSD50.2PM101.224E-03
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Uttar Pradesh Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) D.G. sets of 380 KVA,320 KVA,125KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 15.98
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 15.98
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 10208
(b)Waste/Barren Land 646
(c)Grazing/ Community Land 4383
(d)Surface Water Bodies 230
(e)Settlements 1419
(f)Industrial 0
(g)Forest 5607
(h)Mangroves 0
(i)Marine Area 0
(j)Others : open shrubs 10614
    Total 33107
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt6.28
(2.)Main Plant1.5
(3.)Othersroad, open area, proposed expansion etc.8.2
Total 15.98
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSno WLS with in 10 kms0not applicable
(2.)ESZsnot applicable0not applicable
(3.)Wildlife Corridorsnot applicable0not applicable
(4.)Critically Polluted Areanot applicable0not applicable
(5.)Corridorsnot applicable0not applicable
(6.)NPAnot applicable0not applicable
(7.)ESAsnot applicable0not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnot applicable0not applicable
(2.)Defence Installationsnot applicable0not applicable
(3.)Forestnot applicable0not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 15.98
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land is under the possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus, and Antilope antilope.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 15 lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 26
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 150
(e)No. of working days 330
(f)Total Manpower 176
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6.2806
(2.)Percentage of Total Project Area39.31039
(3.)Funds Allocated02000020000
(4.)No. of Plants3100050031500
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe proposal for installation of LPG Bottling plant will be able to cater the demand of LPG in nearby areas of Salempur, Uttar Pradesh & also adhere to the Govt. of India initiative of supplying LPG t
(2.)FinancialIt provided direct employment to approx. 26 people due to capacity expansion project. Further, it may also provide in direct employment to 150 persons
(3.)Environmental2.8 crores CER budget allocate by company
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant Vardan Environet
(iii)Address D-142, Ground Floor, Sushant Lok-III, Golf Course Ext. road, Sec-57, Gurgaon-122001, India
(iv)Mobile No. 9971684812
(v)Landline No. 0124429103
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrakash Meena
DesignationTM
Name of Company (Applicant Name should not be given here)BPCL SALEMPUR
AddressBPCL, UPSIDC Industrial Area, village & P.O.- Rati Ka Nangla, Tehsil- Sikandra Rao, Salempur, UP
Print