| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Environmental Clarence for “Capacity expansion from 16,804 KL to 17,862 KL (i.e. 1,058 KL additional capacity: 858 KL capacity for Bio Diesel A/G based Cone roof tank and 200 KL capacity for Ethanol | | (b)Name of the Company / Organisation | BPCL AONLA | | (c)Registered Address | BPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla,,Bareilly,Uttar Pradesh-243301 | | (d)Legal Status of the Company | Central Government | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Nandan Singh Pal | | (b)Designation (Owner/ Partner/ CEO) | Manager | | (c)Address | BPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla,,Aonla,Bareilly,Uttar Pradesh-243301 | | (d)Pin code | 243301 | | (e)E-mail | nandans@bharatpetroleum.in | | (f)Telephone No. | 5823-222626 | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| | (b)Minor Project/Activity | NIL | | (c)Category | B1 | | (d)Proposal Number | SIA/UP/IND2/34522/2017 | | (e)Master Proposal Number(Single Window) | SW/101854/2019 | | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | | (g)Project Type | Expansion |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | For approach road (Khasra Nos. for depot area are | | (b)Pincode | 243301 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 28.17382 | | Minutes | | | Second | | | From | | | Degree | 28.1835 | | Minutes | | | Second | | | (d)Bounded Longitudes (East) | | | From | | | Degree | 79.9550 | | Minutes | | | Second | | | From | | | Degree | 79.9741 | | Minutes | | | Second | | | (e)Survey of India Topo Sheet No. | 53P3,53P4,53P7 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 174 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Uttar Pradesh | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Uttar Pradesh | Bareilly | Aonla | Noorpur | |
|
| 6. | | Details of Terms of Reference (ToR)/EC: | | (a)MoEF&CC / SEIAA File Number | 2009/Praya/SEAC/1346-A/2013/AD(VB) | | (b)Date of Apply of EC | 22 Sep 2017 | | (c)Date of Issue of EC | 31 Dec 1899 | | (d)Previous EC Letter | Copy of Previous EC letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 07 Feb 2019 | | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At project site, BPCL POL Depot-1, anola tehsil,bareilly district ,state -uttar pradesh | | State : | Uttar Pradesh | | District : | Bareilly | | Tehsil : | Aonla | | Village : | Noorpur |
| 120 | How the safety will be ensured for the safe operation of the storage tanks.?, Whether there will be any employment vacancy in the
proposed depot?, Near project site there are no toilet and water so | District Magistrate | | |
| 8. | | Details of Project Configuration/Product: | | Details Not Applicable | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | (a)Details of certified report on compliance of earlier environmental clearance condition | | (i)Certified Compliance By | Regional | | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | | (iii)Letter No. | Anola/BPCL/UPPCB/2018-19 | | (iv)Status of Compliance | Compiled | | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | | (vi)Date of site visit | N/A | | (b)Details of Capacity Expansion | |
|
| S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | HSD- A/G tank | 2300 | 0 | 2300 | Others | Kilo litre (KL) | Road | | | (2.) | SKO-A/G tank | 1365 | 0 | 1365 | Others | Kilo litre (KL) | Road | | | (3.) | MS-- A/G tank | 1024 | 0 | 1024 | Others | Kilo litre (KL) | Road | | | (4.) | ETHANOL-U/G tank | 100 | 0 | 100 | Others | Kilo litre (KL) | Road | | | (5.) | ETHANOL-U/G tank | 100 | 0 | 100 | Others | Kilo litre (KL) | Road | | | (6.) | HSD-U/G tank | 200 | 0 | 200 | Others | Kilo litre (KL) | Road | | | (7.) | HSD- A/G tank | 3400 | 0 | 3400 | Others | Kilo litre (KL) | Road | | | (8.) | HSD- U/G tank | 200 | 0 | 200 | Others | Kilo litre (KL) | Road | | | (9.) | SKO -U/G tank | 200 | 0 | 200 | Others | Kilo litre (KL) | Road | | | (10.) | ETHANOL-U/G tank | 0 | 200 | 200 | Others | Kilo litre (KL) | Road | | | (11.) | HSD-A/G tank | 3400 | 0 | 3400 | Others | Kilo litre (KL) | Road | | | (12.) | HSD- A/G tank | 1850 | 0 | 1850 | Others | Kilo litre (KL) | Road | | | (13.) | SKO-A/G Tank | 1365 | 0 | 1365 | Others | Kilo litre (KL) | Road | | | (14.) | MS- U/G tank | 100 | 0 | 100 | Others | Kilo litre (KL) | Road | | | (15.) | MS-A/G tank | 1200 | 0 | 1200 | Others | Kilo litre (KL) | Road | | | (16.) | BIODIESEL-A/G tank | 0 | 858 | 858 | Others | Kilo litre (KL) | Road | | |
| | | (c)Details of Configuration | |
|
| S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
|---|
| (1.) | Storage facility | 16804 KL | 1058 KL | 17862 KL | For MS, HSD, Ethanol and Biodiesel | |
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | 27 Jun 2018 | | (iv)Valid Upto | 31 Dec 2019 | | (v)File No. | 23097/UPPCB/BAREILLY/CTO /AIR/BARELLY/2018 | | (vi)Application No. | 1621577 | | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in crores) | 3.21 | | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.05 | | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.09 | | (e) Funds Allocated for Environment Management Capital(%) | 0.00 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 0 | | (b)Existing quantity of raw material/fuel | 0 | | (c)Total quantity of raw material/fuel | 0 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Storage facility | 0 | Others | Not applicable | Not applicable | Others | Not applicable | 0 | Others | nOT APPLICABLE | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 01 Nov 2017 To 31 Jan 2018 | | (b)Season | Winter | |
|
| 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM2.5 | | Micro Gram per Meter Cube | 31.1 | 16.2 | 30.7 | 60 | | (2.) | SO2 | | Micro Gram per Meter Cube | 8.24 | 5.01 | 8.15 | 80 | | (3.) | PM10 | | Micro Gram per Meter Cube | 64.1 | 32.1 | 30.73 | 100 | | (4.) | NOx | | Micro Gram per Meter Cube | 17.1 | 7.9 | 17.1 | 80 | |
| 14.2. No. of Ground Water Monitoring Locations : 9 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | pH | | | NA | | 8.02 | 6.45 | 6.5 | 8.5 | | (2.) | Total Hardness | | | mg/l | | 260 | 85 | 200 | 600 | | (3.) | Chlorides | | | mg/l | | 123 | 16 | 250 | 100 | | (4.) | Fluoride | | | mg/l | | 0.52 | 0.16 | 1.0 | 1.5 | | (5.) | Heavy Metals | | Zinc | mg/l | | 0.23 | 0.05 | 5 | 15 | | (6.) | TDS | | | mg/l | | 418 | 173 | 500 | 2000 | | (7.) | TSS | | | NA | | 1.5 | 0.5 | 1 | 2 | |
| 14.3. No. of Surface Water Monitoring Locations : 1 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | COD | | mg/l | | 12.5 | 12.5 | C | | (2.) | pH | | NA | | 8.11 | 8.11 | C | | (3.) | BOD | | mg/l | | 3.9 | 3.9 | C | | (4.) | DO | | mg/l | | 6.8 | 6.8 | C | |
| 14.4. No. of Ambient Noise Monitoring Locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.8 | 40.3 | 45 | | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.6 | 47.1 | 55 | |
| 14.5. No. of Soil Sample Monitored Locations : 8 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | N(Nitrogen) | Others | kg/ha | 366 | 248 | | (2.) | K(Potassium) | Others | kg/ha | 271 | 182 | | (3.) | pH | | | 7.82 | 6.54 | | (4.) | P(Phosphorus) | Others | kg/ha | 66.7 | 28.2 | | (5.) | Electric Conductivity | Others | g/cc | 0.214 | 0.054 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14.88 To 2.45 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.95 To 14.65 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | GroundWater | | 10 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/7575/UP/IND/2019 | 23 May 2019 | 10 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Domestic sewage | 2.8 | 2.8 | septic tank | Reuse within the Plant & Recycling | | 2.8 | | |
|
| 16.1. | | (a)Total Waste Water Generation | 2.8 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 2.8 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Municipal solod waste | Municipal Solid Waste | | 3.83 | Tons | 0 | Road | | Others | disposed as minicipal solid waste rule2000 | | (2.) | sludge form tanks | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.2 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | SO2 | | Microgram per Meter Cube | 8.24 | 0.8 | 1.10 | 9.34 | 80 | | (2.) | PM2.5 | | Microgram per Meter Cube | 31.1 | 0.8 | 2.074 | 33.174 | 60 | | (3.) | NOx | | Microgram per Meter Cube | 17.1 | 0.8 | 4.0 | 21.1 | 80 | | (4.) | PM10 | | Microgram per Meter Cube | 64.1 | 0.8 | 2.074 | 66.174 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | DG set (1 no of 320 KVA) | Diesel | 7.5 | 0.2 | PM10 | | 0.0072 g/s | | (2.) | DG set( 1 NO OF 160 kva) | diesel | 7 | 0.15 | NOx | | 0.18 | | (3.) | DG set (1 no of 65 KVA) | Diesel | 7 | 0.2 | Others | CO | 0.023 g/s | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 545 | | (b)Source | central UP corporation | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | 320 KVA of 1 no.,160KVA of 1 no., 65 KVA of 1 no. | | (e)Stack Height (in m) | 7.5 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land | 0 | | (b)Private Land | 11.33 | | (c)Government Land | 0 | | (d)Revenue Land | 0 | | (e)Other Land | 0 | | Total Land | 11.33 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area | 3.74 | | (b)Waste/Barren Land | 7.59 | | (c)Grazing/ Community Land | 0 | | (d)Surface Water Bodies | 0 | | (e)Settlements | 0 | | (f)Industrial | 0 | | (g)Forest | 0 | | (h)Mangroves | 0 | | (i)Marine Area | 0 | | (j)Others : 0 | 0 | | Total | 11.33 | |
|
| 22. Land Requirement for Various Activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
|---|
| (1.) | Others | storage tanks,TLF | 6.96 | | | (2.) | Green belt | | 3.73 | | | (3.) | Main Plant | | 0.66 | | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | NPA | NIL | 0 | Nil within 10 km radius of study area | | (2.) | ESAs | NIL | 0 | Nil within 10 km radius of study area | | (3.) | Corridors | NIL | 0 | Nil within 10 km radius of study area | | (4.) | Wildlife Corridors | NIL | 0 | Nil within 10 km radius of study area | | (5.) | Critically Polluted Area | NIL | 0 | Nil within 10 km radius of study area | | (6.) | WLS | NIL | 0 | Nil within 10 km radius of study area | | (7.) | ESZs | NIL | 0 | Nil within 10 km radius of study area | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Archaeological Sites | | nil | 0 | none in 10 km radius | | (2.) | Defence Installations | | nil | 0 | none in 10 km radius | | (3.) | Forest | | nil | 0 | none in 10 km radius | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 11.33 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | land is already possession of BPCL | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in Rs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | No | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 20 | | (b)Permanent Employment-During Operation | 21 | | (c)Temporary Employment- During Construction | 5 | | (d)Temporary Employment- During Operation | 5 | | (e)No. of working days | 300 | | (f)Total Manpower | 51 | |
|
|
| S. No. | Description | Existing | Proposed | Total |
|---|
| (1.) | Total Area of Green Belt | 3.73 | 0 | 3 | | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | | (3.) | No. of Plants | 30 | 30 | 60 | | (4.) | Funds Allocated | 100000 | 0 | 100000 | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Financial | The proposed project in Uttar pradesh will improve supply
position of the petroleum products which is vital for economic
growth as well as improving the quality of life. The improved
petroleum supply will have strong logistic support for delivering
the products to customers
without interruption. | | (2.) | Environmental | Indirect benefits are also expected to occur in the region by way
of reduction of delivery distance by tankers which in turn will
reduce trucks on the road reducing the vehicular load on the
public roads. This will result in reduced air pollution and
reduced probability of accidents on the roads due to less
movement of tank trucks BPCL will lay its focus on CSR activities
specially on local communities in and around areas of
Companys operations. | | (3.) | Social | The proposed project is expected to bring significant socio-
economic and environmental benefits both at local and national
level like; Projects of this category will improve availability of
the physical infrastructures like drainage, communication and
transportation facilities, etc.Also the project will indirectly boost
up the social infrastructure of the surrounding like local
education, medical and communication of the surrounding area | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details : NOT APPLICABLE |
| 35. Sector Specific Details For Industrial Projects - 2 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1619/RA0048 | | (ii)Name of the EIA Consultant | ABC TECHNO LABS INDIA PRIVATE LIMITED | | (iii)Address | ABC Tower,400, 13th street, SIDCO Industrial estate, North Phase, ambattur, chennai - 600098 | | (iv)Mobile No. | 9444260000 | | (v)Landline No. | 0442625779 | | (vi)Email Id | mumbai@abctechnolab.com | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | Industrial Projects - 2 | | (ix)Validity of Accreditation | 25 May 2019 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | |
| Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| (1.) | 20/07/2019 | Please submit the information/clarification as directed by SEAC in its meeting dated 01/07/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in | | | (2.) | 30/07/2019 | Respected Sir,
Please attached herewith request letter for the EC proposal. | ADS Letter | | (3.) | 16/11/2019 | Please submit the information/clarification as directed by SEAC in its meeting dated 11/10/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in | | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Nandan Singh Pal | | Designation | Manager | | Name of Company (Applicant Name should not be given here) | BPCL AONLA | | Address | BPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla |
|