Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clarence for “Capacity expansion from 16,804 KL to 17,862 KL (i.e. 1,058 KL additional capacity: 858 KL capacity for Bio Diesel A/G based Cone roof tank and 200 KL capacity for Ethanol
(b)Name of the Company / Organisation BPCL AONLA
(c)Registered Address BPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla,,Bareilly,Uttar Pradesh-243301
(d)Legal Status of the Company Central Government
2.
Address for the correspondence:
(a)Name of the Applicant Nandan Singh Pal
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address BPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla,,Aonla,Bareilly,Uttar Pradesh-243301
(d)Pin code 243301
(e)E-mail nandans@bharatpetroleum.in
(f)Telephone No. 5823-222626
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/IND2/34522/2017
(e)Master Proposal Number(Single Window) SW/101854/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. For approach road (Khasra Nos. for depot area are
(b)Pincode 243301
(c)Bounded Latitudes (North)
From
Degree 28.17382
Minutes
Second
From
Degree 28.1835
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.9550
Minutes
Second
From
Degree 79.9741
Minutes
Second
(e)Survey of India Topo Sheet No. 53P3,53P4,53P7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 174
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshBareillyAonlaNoorpur
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 2009/Praya/SEAC/1346-A/2013/AD(VB)
(b)Date of Apply of EC 22 Sep 2017
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0
At project site, BPCL POL Depot-1, anola tehsil,bareilly district ,state -uttar pradesh
State :Uttar Pradesh
District :Bareilly
Tehsil :Aonla
Village :Noorpur
120How the safety will be ensured for the safe operation of the storage tanks.?, Whether there will be any employment vacancy in the proposed depot?, Near project site there are no toilet and water soDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. Anola/BPCL/UPPCB/2018-19
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HSD- A/G tank230002300OthersKilo litre (KL)Road
(2.)SKO-A/G tank136501365OthersKilo litre (KL)Road
(3.)MS-- A/G tank102401024OthersKilo litre (KL)Road
(4.)ETHANOL-U/G tank1000100OthersKilo litre (KL)Road
(5.)ETHANOL-U/G tank1000100OthersKilo litre (KL)Road
(6.)HSD-U/G tank2000200OthersKilo litre (KL)Road
(7.)HSD- A/G tank340003400OthersKilo litre (KL)Road
(8.)HSD- U/G tank2000200OthersKilo litre (KL)Road
(9.)SKO -U/G tank2000200OthersKilo litre (KL)Road
(10.)ETHANOL-U/G tank0200200OthersKilo litre (KL)Road
(11.)HSD-A/G tank340003400OthersKilo litre (KL)Road
(12.)HSD- A/G tank185001850OthersKilo litre (KL)Road
(13.)SKO-A/G Tank136501365OthersKilo litre (KL)Road
(14.)MS- U/G tank1000100OthersKilo litre (KL)Road
(15.)MS-A/G tank120001200OthersKilo litre (KL)Road
(16.)BIODIESEL-A/G tank0858858OthersKilo litre (KL)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Storage facility16804 KL1058 KL17862 KLFor MS, HSD, Ethanol and Biodiesel
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Jun 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 23097/UPPCB/BAREILLY/CTO /AIR/BARELLY/2018
(vi)Application No. 1621577
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 3.21
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.05
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.09
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Storage facility0OthersNot applicableNot applicableOthersNot applicable0 OthersnOT APPLICABLECopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2017 To 31 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube31.116.230.760
(2.)SO2Micro Gram per Meter Cube8.245.018.1580
(3.)PM10Micro Gram per Meter Cube64.132.130.73100
(4.)NOxMicro Gram per Meter Cube17.17.917.180
    14.2.     No. of Ground Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.026.456.58.5
(2.)Total Hardnessmg/l26085200600
(3.)Chloridesmg/l12316250100
(4.)Fluoridemg/l0.520.161.01.5
(5.)Heavy MetalsZincmg/l0.230.05515
(6.)TDSmg/l4181735002000
(7.)TSSNA1.50.512
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l12.512.5C
(2.)pHNA8.118.11C
(3.)BODmg/l3.93.9C
(4.)DOmg/l6.86.8C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.840.345
(2.)Leq(Day)A-weighted decibels(dB(A))53.647.155
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Otherskg/ha366248
(2.)K(Potassium)Otherskg/ha271182
(3.)pH7.826.54
(4.)P(Phosphorus)Otherskg/ha66.728.2
(5.)Electric ConductivityOthersg/cc0.2140.054
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.88 To 2.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.95 To 14.65
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater100Copy of Permission LetterPipelineTube Well21-4/7575/UP/IND/201923 May 201910
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic sewage2.82.8septic tankReuse within the Plant & Recycling2.8
16.1.
(a)Total Waste Water Generation 2.8
(b)Total Discharged Water 0
(c)Total Reused Water 2.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal solod wasteMunicipal Solid Waste3.83Tons0RoadOthersdisposed as minicipal solid waste rule2000
(2.)sludge form tanksHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube8.240.81.109.3480
(2.)PM2.5Microgram per Meter Cube31.10.82.07433.17460
(3.)NOxMicrogram per Meter Cube17.10.84.021.180
(4.)PM10Microgram per Meter Cube64.10.82.07466.174100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set (1 no of 320 KVA)Diesel7.50.2PM100.0072 g/s
(2.)DG set( 1 NO OF 160 kva)diesel70.15NOx0.18
(3.)DG set (1 no of 65 KVA)Diesel70.2OthersCO0.023 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 545
(b)Source central UP corporation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 320 KVA of 1 no.,160KVA of 1 no., 65 KVA of 1 no.
(e)Stack Height (in m) 7.5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 11.33
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 11.33
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 3.74
(b)Waste/Barren Land 7.59
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 11.33
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Othersstorage tanks,TLF6.96
(2.)Green belt3.73
(3.)Main Plant0.66
Total 11.35
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANIL0Nil within 10 km radius of study area
(2.)ESAsNIL0Nil within 10 km radius of study area
(3.)CorridorsNIL0Nil within 10 km radius of study area
(4.)Wildlife CorridorsNIL0Nil within 10 km radius of study area
(5.)Critically Polluted AreaNIL0Nil within 10 km radius of study area
(6.)WLSNIL0Nil within 10 km radius of study area
(7.)ESZsNIL0Nil within 10 km radius of study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnil0none in 10 km radius
(2.)Defence Installationsnil0none in 10 km radius
(3.)Forestnil0none in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.33
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired land is already possession of BPCL
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 21
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 51
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.7303
(2.)Percentage of Total Project Area33033
(3.)No. of Plants303060
(4.)Funds Allocated1000000100000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe proposed project in Uttar pradesh will improve supply position of the petroleum products which is vital for economic growth as well as improving the quality of life. The improved petroleum supply will have strong logistic support for delivering the products to customers without interruption.
(2.)EnvironmentalIndirect benefits are also expected to occur in the region by way of reduction of delivery distance by tankers which in turn will reduce trucks on the road reducing the vehicular load on the public roads. This will result in reduced air pollution and reduced probability of accidents on the roads due to less movement of tank trucks BPCL will lay its focus on CSR activities specially on local communities in and around areas of Companys operations.
(3.)SocialThe proposed project is expected to bring significant socio- economic and environmental benefits both at local and national level like; Projects of this category will improve availability of the physical infrastructures like drainage, communication and transportation facilities, etc.Also the project will indirectly boost up the social infrastructure of the surrounding like local education, medical and communication of the surrounding area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC TECHNO LABS INDIA PRIVATE LIMITED
(iii)Address ABC Tower,400, 13th street, SIDCO Industrial estate, North Phase, ambattur, chennai - 600098
(iv)Mobile No. 9444260000
(v)Landline No. 0442625779
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)20/07/2019Please submit the information/clarification as directed by SEAC in its meeting dated 01/07/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(2.)30/07/2019Respected Sir, Please attached herewith request letter for the EC proposal.ADS Letter
(3.)16/11/2019Please submit the information/clarification as directed by SEAC in its meeting dated 11/10/2019. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNandan Singh Pal
DesignationManager
Name of Company (Applicant Name should not be given here)BPCL AONLA
AddressBPCL POL Bulk Depot, Near Aonla Railway Station, Village Noorpur, Tahsil Aonla
Print