Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed 1x 30 MW Coal Based Captive Power Plant in Existing 4.6 MTPA Cement Grinding Unit At-Jojobera, Dist- East Singhbhum, Jharkhand.
(b)Name of the Company / Organisation NUVOCO VISTAS CORPORATION LIMITED
(c)Registered Address Equinox Business Park, Tower-3, East Wing,4th Floor, Off.Bandra Kurla Complex, LBS Road,Kurla (West), Mumbai,,Mumbai City,Maharashtra-400070
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Manoj kumar Agrawal
(b)Designation (Owner/ Partner/ CEO) VicePresident
(c)Address Equinox Business Park, Tower-3, East Wing,4th Floor, Off.Bandra Kurla Complex, LBS Road,Kurla (West), Mumbai,East Singhbhum,Jharkhand-831016
(d)Pin code 831016
(e)E-mail manoj.agrawal@nuvoco.in
(f)Telephone No. 657-6540396
(g)Fax No. 2277244
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(d) Thermal Power Plants
(b)Minor Project/Activity3(b) Cement plants
(c)Category B1
(d)Proposal Number SIA/JH/THE/20890/2017
(e)Master Proposal Number(Single Window) SW/99065/2019
(f)EAC concerned (for category A Projects only) Thermal Projects
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 5758,5759(p) & 5762(p)
(b)Pincode 831016
(c)Bounded Latitudes (North)
From
Degree 22.749853
Minutes
Second
From
Degree 22.760597
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.237181
Minutes
Second
From
Degree 86.250336
Minutes
Second
(e)Survey of India Topo Sheet No. F45I-1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 198
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number EC/SEIAA/2017-18/2063/2017
(b)Date of Apply of TOR 17 Nov 2017
(c)Date of Issue of TOR / Standard ToR 04 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :2.81
Tube Makers Club, Namdih Road, Gayatri Nagar, Nildih, Jamshedpur, District- East Singhbhum
State :Jharkhand
District :East Singhbhum
Tehsil :musabani
Village :Jojobera
150Issues :- Priority in employment, removing of fly ash and water, unemployment, How will Govindpur resident be benefited from opening the company, difficulty in traffic, plantation, increase in pollutiDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Thermal Power Plant1x30MWUse in existing cement plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Captive Power30Mega Watt(MW)Othersuse in existing cement plant
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 163.28
(b) Funds Allocated for Environment Management (Capital) (in crores) 30.95
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.23
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 6.1
(e) Funds Allocated for Environment Management Capital(%) 18.40
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal0Tons per AnnumOpen MarketRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube91.655.290.6100
(2.)SO2Micro Gram per Meter Cube17.84.117.580
(3.)NOxMicro Gram per Meter Cube22.79.20.880
(4.)PM2.5Micro Gram per Meter Cube62.426.452.060
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l230.0198.0500500
(2.)Total Hardnessmg/l172.0142.0200200
(3.)Fluoridemg/l0.440.411.01.0
(4.)pHNA8.27.826.58.5
(5.)Heavy Metalspbmg/l0.010.010.010.05
(6.)TSSNA0000
(7.)Chloridesmg/l36.030.0250250
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.266.68C
(2.)CODmg/l3214C
(3.)BODmg/l2.82.4C
(4.)DOmg/l5.45.1C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.530.970
(2.)Leq(Day)A-weighted decibels(dB(A))56.438.575
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.186.78
(2.)N(Nitrogen)Kilogram per hectare342.8298.2
(3.)Electric ConductivityMillisiemens per Centimetre0.4120.284
(4.)P(Phosphorus)Kilogram per hectare12.29.8
(5.)K(Potassium)Kilogram per hectare136.6118.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.85 To 3.96
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.10 To 13.85
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersJUSCO (Prev. Tata Steel)6067Copy of Permission LetterPipelineOthersJUSCO (Prev. Tata Steel)TA/C-7/102023 Mar 20021892.70
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial2650ETPOthersReuse – FGD & plantation260
(2.)Domestic18140STPOthersReuse – FGD & plantation180
16.1.
(a)Total Waste Water Generation 44
(b)Total Discharged Water 0
(c)Total Reused Water 44
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SOLID WASTEBottom Ash13192Tons20OthersCovered TrucksOthersBrick/Block Manufacturer
(2.)SOLID WASTEFly Ash52768Tons0.3OthersPIPE LINEOthersUse in existing cement section
(3.)SOLID WASTEOthersUSED OIL1.6Kilolitre25OthersCovered Trucks IndrumOthersRegistered recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube17.80.32.7320.5380
(2.)NOxMicrogram per Meter Cube21.60.33.3124.9180
(3.)PM10Microgram per Meter Cube91.60.34.3795.97100
(4.)PM2.5Microgram per Meter Cube54.20.32.4256.6260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CPP BOILERCOAL902.4OthersPM4.50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source JUSCO (prev. Tata Steel)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No DG Set
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 2.99
    Total Land 2.99
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 10085
(b)Waste/Barren Land 4864
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 425.0
(e)Settlements 7673
(f)Industrial 2644
(g)Forest 4685
(h)Mangroves 0
(i)Marine Area 0
(j)Others : other land 3353
    Total 33729
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersCPP2.99
Total 2.99
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)ESZsNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)ForestDhan Chatani R.F3.5DIRECTION-NE
(3.)Archaeological SitesNA0NA
(4.)OthersForestBhelaipahari RF9.5DIRECTION-NE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.99
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hudco Lake
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.05
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 24
(c)Temporary Employment- During Construction 19
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 43
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.986
(b)Percentage of Total Project Area 32.98
(c)No. of Plants to be Planted 800
(d)Funds Allocated for Plantation 12000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirectly and Indirect Employment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed CFBC
(b) Plant Load Factor(%) 85
(c) Station Heat Rate (Kcal/Kwh) 4000
(d) Steam Rate/Flow Rate 130
(e) Boiler Temperature 540
(f) Boiler Pressure 110
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)01902.420.50140
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)CoalOpen Market
Source of Linkage :Open Market
Quantity of Linkage Granted :0
Date of Linkage :01 Mar 2019
Duration of Linkage :0
Gross Calorific Value (Kcal/Kg) :0
Ash Content (%) :0
Sulphur Content (%) :0
Moisture (%) :0
Mercury (mg/kg) :0
Fixed Carbon (%) :0
Volatile Matter (%) :0
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Coal
Distance :
Quantity :
Distance :
Quantity :
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :
Quantity :
00
TOTAL Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Natural Draft
(c) Type of Air Circulation Counter Flow
(d) Cycle of Cooling (COC) 5
(e) Water Req. For Cooling (m3/day) 100
(f) Boiler Blow Down Temperature 110
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0090
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt. Ltd.
(iii)Address Plot No. M-22&23, Chandaka Industrial Estate, Bhubaneswar-751024, Dist- Khurda, Odisha
(iv)Mobile No. 9338822732
(v)Landline No. 0674274459
(vi)Email Id visiontekin@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 13 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter NA
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)02/04/2019You are request to upload/submit the following documents for further action: 1.CO Certificate which clearly states that applied area does not recorded as Jungal/ Jungal jhari/ Sakhu jungal / Chote Jhad jungal/ Manjhole jhad jungal in Khatiyan/ Register part-II/ any Govt. record. 2.DFO Certificate as per the format given in 67th Meeting of SEIAA.
(2.)15/04/2019The correction have been made as per the instruction received
(3.)18/04/2019You are requested to submit the hard copy of proposal in two set (every page of both copies must be attested by Project Proponent) to this office for further action.
(4.)23/04/2019The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj kumar Agrawal
DesignationVicePresident
Name of Company (Applicant Name should not be given here)NUVOCO VISTAS CORPORATION LIMITED
AddressEquinox Business Park, Tower-3, East Wing,4th Floor, Off.Bandra Kurla Complex, LBS Road,Kurla (West), Mumbai
Print