Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Greenfield Specialty Chemicals unit DCM Nouvelle Specialty Chemicals Limited
(b)Name of the Company / Organisation DCM NOUVELLE SPECIALTY CHEMICALS LIMITED
(c)Registered Address 407 VIKRANT TOWER 4 RAJENDRA PLACE NEW DELHI,,Central,Delhi-110008
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Pratap Singh
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address 407 VIKRANT TOWER 4 RAJENDRA PLACE NEW DELHI,,,Central,Delhi-110008
(d)Pin code 110008
(e)E-mail dcmujjain@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/IND3/82304/2022
(e)Master Proposal Number(Single Window) SW/287405/2022
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 91,92 & 93
(b)Pincode 456010
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 5
Second 32.64
From
Degree 23
Minutes 5
Second 39.31
(d)Bounded Longitudes (East)
From
Degree 75
Minutes 56
Second 7.75
From
Degree 75
Minutes 56
Second 26.11
(e)Survey of India Topo Sheet No. 44M/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 521
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5.22
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshUjjainUjjainDMIC Vikram Udyogpuri
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 9133/2022
(b)Date of Apply of TOR 28 Apr 2022
(c)Date of Issue of TOR / Standard ToR 06 Jun 2022
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Industry is coming in Notified Industrial Area.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Autoclave2-10 KL15 No.s
(2.)Distillation Column0.3-1.2 M Dia, 10-20 M Dia10 No.s
(3.)Heat Exchangers0.2 - 40 m2 Area60 No.s
(4.)Pumps2 - 30 m3/Hr50 No.s
(5.)Cooling Towers1000 M3/Hr02 No.s
(6.)Steam Boilers (Medium Pressure)10 TPH2 No.s
(7.)Fixed Bed Reactor1-6 KL6 No.s
(8.)Hot Oil System (Electrically heated)0.5 Million Kcal/Hr01 No.s
(9.)Chilled brine system100 TR02 No.s
(10.)DG sets1000 KVA each with 10 m stack height.02 No.s
(11.)ETP900 KLD1 No.s
(12.)Storage Tanks30 - 300 m330 No.s
(13.)Scrubbers0.3 - 0.8 M Dia, 5-10 M High4 No.s
(14.)Compressors50 - 200 Nm3/ Hr08 No.s
(15.)Liquid nitrogen storage10 m301 No.s
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Alkyl Amines2500OthersMT per MonthRoad
(2.)Alkylated Phenols & Alkali Metal Methylates2500OthersMT per MonthRoad
(3.)Fatty Amines & Amides5000OthersMT per MonthRoad
(4.)Ethoxylates of Fatty Amines & Fatty Alcohols1000OthersMT per MonthRoad
(5.)Aromatic Amines2500OthersMT per MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 200
(b) Funds Allocated for Environment Management (Capital) (in crores) 15.80
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2.19
(e) Funds Allocated for Environment Management Capital(%) 7.90
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 25
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 25
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)N Butanol10680Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(2.)N Propanol4200Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(3.)Cyclohexanol1080Tons per AnnumImport/ Domestic MarketRoad400 Open MarketCopy of Linkage
(4.)Isobutylene15480Tons per AnnumImport/ Domestic MarketRoad400 Open MarketCopy of Linkage
(5.)Lauric Acid6240Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(6.)Stearic Acid5400Tons per AnnumImport/ Domestic MarketRoad750 Open MarketCopy of Linkage
(7.)Aniline8280Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(8.)1, 4 Dichlorobenzene3480Tons per AnnumImport/ Domestic MarketRoad300 Open MarketCopy of Linkage
(9.)Benzonitrile1680Tons per AnnumImport/ Domestic MarketRoad300 Open MarketCopy of Linkage
(10.)Resorcinol2760Tons per AnnumImport/ Domestic MarketRoad400 Open MarketCopy of Linkage
(11.)Acetone3360Tons per AnnumImport/ Domestic MarketRoad350 Open MarketCopy of Linkage
(12.)Phenol13080Tons per AnnumImport/ Domestic MarketRoad400 Open MarketCopy of Linkage
(13.)Decyl Alcohol2160Tons per AnnumImport/ Domestic MarketRoad800 Open MarketCopy of Linkage
(14.)Dimethyl amine sol. (40%)3120Tons per AnnumImport/ Domestic MarketRoad350 Open MarketCopy of Linkage
(15.)Myristyl Alcohol2160Tons per AnnumImport/ Domestic MarketRoad800 Open MarketCopy of Linkage
(16.)Lauryl Alcohol2160Tons per AnnumImport/ Domestic MarketRoad800 Open MarketCopy of Linkage
(17.)Stearly alcohol2880Tons per AnnumImport/ Domestic MarketRoad800 Open MarketCopy of Linkage
(18.)2,4 dinitrochlorobenzene5160Tons per AnnumImport/ Domestic MarketRoad350 Open MarketCopy of Linkage
(19.)Sulfuric Acid7080Tons per AnnumImport/ Domestic MarketRoad500 Open MarketCopy of Linkage
(20.)Octanol4320Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(21.)Ethanol6240Tons per AnnumImport/ Domestic MarketRoad400 Open MarketCopy of Linkage
(22.)Sodium Hydroxide1080Tons per AnnumImport/ Domestic MarketRoad350 Open MarketCopy of Linkage
(23.)Nitric Acid1560Tons per AnnumImport/ Domestic MarketRoad450 Open MarketCopy of Linkage
(24.)Myristic Acid2520Tons per AnnumImport/ Domestic MarketRoad700 Open MarketCopy of Linkage
(25.)Nitrobenzene20640Tons per AnnumImport/ Domestic MarketRoad350 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2022 To 31 May 2022
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube19.74.019.680
(2.)OthersNH3Micro Gram per Meter Cube19.68.419.4400
(3.)SO2Micro Gram per Meter Cube9.42.89.380
(4.)PM10Micro Gram per Meter Cube99.749.599.6100
(5.)PM2.5Micro Gram per Meter Cube50.923.950.780
    14.2.     No. of Ground Water Monitoring Locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.97.26.58.5
(2.)TDSmg/l5604355002000
(3.)Total Hardnessmg/l520340200600
(4.)Fluoridemg/l1.180.311.5
(5.)Chloridesmg/l112.673.62501000
(6.)TSSmg/l150900
    14.3.     No. of Surface Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1003B
(2.)pHNA7.87.0B
(3.)DOmg/l5.22.9B
(4.)CODmg/l3012B
    14.4.     No. of Ambient Noise Monitoring Locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.339.945
(2.)Leq(Day)A-weighted decibels(dB(A))67.650.655
    14.5.     No. of Soil Sample Monitored Locations : 05
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare11.39.32
(2.)K(Potassium)Kilogram per hectare289.3103.9
(3.)Electric ConductivityMilliequivalents per 100 Gram670.6503.69
(4.)pH7.596.98
(5.)N(Nitrogen)Kilogram per hectare989.2450.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDMIC Vikram udhyogpuri Ujjain.110601Copy of Permission LetterPipelineOthersPipelineVUL/TK/U/2022/14923 Aug 20221106
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial900900ZLDReuse within the Plant & Recycling9000
16.1.
(a)Total Waste Water Generation 900
(b)Total Discharged Water 0
(c)Total Reused Water 900
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Deactivated Hydrogenation precious metal catalystIndustrial Waste353.16Tons20RoadCo-Processing
(2.)Distillation residueIndustrial Waste20.3Tons14.5RoadOthersBrick Manufacturing
(3.)Deactivated CatalystIndustrial Waste309.96Tons62.2RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)90.12Tons62.2RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.71.401.00720.780
(2.)PM10Microgram per Meter Cube99.71.301.5101.2100
(3.)Others(Specify)COMicrogram per Meter Cube0.3951.200.91.294
(4.)SO2Microgram per Meter Cube9.41.202.2611.6680
(5.)PM2.5Microgram per Meter Cube50.91.200.951.860
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler StackFO451.5PM10,SO2,NOx15
(2.)Boiler StackBiomass451.5PM1012
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source Vikram Udhyogpuri Ujjain.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1000 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 8.6325
(e)Other Land 00
    Total Land 8.6325
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 294.74
(b)Waste/Barren Land 4.12
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 4.81
(e)Settlements 5.69
(f)Industrial 3.94
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : 0.66 Mining
    Total NaN
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant8.6325
Total 8.6325
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00NA
(2.)ESZsNA00NA
(3.)CorridorsNA00NA
(4.)ESAsNA00NA
(5.)NPANA00NA
(6.)WLSNA00NA
(7.)Wildlife CorridorsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsMilitary's head quarter of war MHOW62.5NA
(2.)ForestNA00NA
(3.)Archaeological SitesMahakal Mandir Ujjain17.94Ancient Temple
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.6325
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Silarkhedi Lake
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 5.38
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 1500
(e)No. of working days 330
(f)Total Manpower 2250
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.8487
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 3700000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental33 % of green belt area will be developed.
(2.)SocialEmployment will be generated.
(3.)SocialEmployment will be generated.
(4.)Environmental33 % of green belt area will be developed.
(5.)Environmental33 % of green belt area will be developed.
(6.)Environmental33 % of green belt area will be developed.
(7.)SocialEmployment will be generated.
(8.)SocialEmployment will be generated.
(9.)SocialEmployment will be generated.
(10.)SocialEmployment will be generated.
(11.)Environmental33 % of green belt area will be developed.
(12.)Environmental33 % of green belt area will be developed.
(13.)Environmental33 % of green belt area will be developed.
(14.)Environmental33 % of green belt area will be developed.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/IA0088
(ii)Name of the EIA Consultant Envisolve LLP
(iii)Address Plot 27, Slice 4, Scheme No 78, Indore
(iv)Mobile No. 9713125599
(v)Landline No. 0731420831
(vi)Email Id eia@envisolve.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 24 Aug 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)26/08/2022some part of PFR is not redable. kindly upload afresh PFR
(2.)12/09/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)30/09/2022Copy EnclosedADS Letter
(2.)03/10/2022ADS ReplyADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPratap Singh
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)DCM NOUVELLE SPECIALTY CHEMICALS LIMITED
Address407 VIKRANT TOWER 4 RAJENDRA PLACE NEW DELHI