Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed IT ITES cum township project “Golden Grande”
(b)Name of the Company / Organisation M/S ADVANCE COMPUSOFT PVT. LTD
(c)Registered Address H-110,Ground floor, sector-63, Noida,,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sudhanshu Rai
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address A-314,Sector-47, Noida, GB Nagar,U.P,,Dadri,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Pin code 201301
(e)E-mail goldengrand70@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/MIS/72294/2021
(e)Master Proposal Number(Single Window) SW/256691/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 19, Tech Zone- 04 Greater Noida, Uttar
(b)Pincode 201309
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 35
Second 47.21
From
Degree 28
Minutes 35
Second 49.46
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 26
Second 1.53
From
Degree 77
Minutes 26
Second 14.59
(e)Survey of India Topo Sheet No. 53H10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 201
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.21
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshGautam Buddha NagarGautam Buddha NagarPlot No. 19, Tech Zone- 04 Greater Noida, Uttar Pradesh
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 6667
(c)Date of Apply of TOR 09 Nov 2021
(d)Date of Issue of TOR / Standard ToR 30 Dec 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per Para-7 (iii) (d) of EIA Notification 2006
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Not ApplicableNot ApplicableIt is building construction project of Cat B1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Not Applicable0.0Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1284.91
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.397
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 12.8491
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.4692
(e) Funds Allocated for Environment Management Capital(%) 0.11
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 28.8
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 28.8
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD28.8Kilo Litre per DayOpen MarketRoad4.0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2021 To 31 Mar 2021
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube90.949.988.580
(2.)SO2Micro Gram per Meter Cube13.347.713.1380
(3.)NOxMicro Gram per Meter Cube3317.83280
(4.)PM10Micro Gram per Meter Cube137.994137.7100
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.317.156.58.5
(2.)TDSmg/l812.5769.35002000
(3.)Fluoridemg/l0.900.6811.5
(4.)Total Hardnessmg/l298.5214120170
(5.)Chloridesmg/l7868200250
(6.)Heavy MetalsCumg/l0.290.190.051.5
(7.)TSSNA0000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l51.347.5C
(2.)pHNA7.417.26C
(3.)DOmg/l4.544.20C
(4.)BODmg/l20.8419.30C
    14.4.     No. of Ambient Noise Monitoring Locations : 05
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))94.847.175
(2.)Leq(Night)A-weighted decibels(dB(A))83.936.275
    14.5.     No. of Soil Sample Monitored Locations : 05
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.527.27
(2.)P(Phosphorus)Milligram per Kilogram42.230.6
(3.)Electric ConductivityMillisiemens per Centimetre2923.6
(4.)N(Nitrogen)Milligram per Kilogram7.86.21
(5.)K(Potassium)Milligram per Kilogram75.569.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.35 To 14.40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.35 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMuncipal Water Supply15052.0 Not Appliacble PipelineOthersMunicipal water supply103 Jan 2022774
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Municipal Supply724870STP (MBBR)Reuse within the Plant & Recycling724
16.1.
(a)Total Waste Water Generation 724
(b)Total Discharged Water 0
(c)Total Reused Water 724
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste2257.500Tons3.0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube13.341.00.3413.6880
(2.)NOxMicrogram per Meter Cube331.02.935.980
(3.)PM10Microgram per Meter Cube137.91.03.4141.3100
(4.)PM2.5Microgram per Meter Cube90.91.03.494.360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD1272.0PM10,SO2,NOx ,PM2.5Within the prescribed standard
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9982
(b)Source UPPCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 07 Nos. of DG sets of total capacity 10,250kVA (6
(e)Stack Height (in m) 127
20.
Land Ownership Pattern:
(a)Forest Land 0.0
(b)Private Land 10.00952
(c)Government Land 0.0
(d)Revenue Land 0
(e)Other Land 0.0
    Total Land 10.00952
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0.0
(b)Waste/Barren Land 0.0
(c)Grazing/ Community Land 0.0
(d)Surface Water Bodies 0.0
(e)Settlements 0.0
(f)Industrial 10.00952
(g)Forest 0.0
(h)Mangroves 0.0
(i)Marine Area 0.0
(j)Others : nONE 0.0
    Total 10.00952
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area40.82754
Total 40.82754
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0.0None within 10 Km Radius from the project site
(2.)ESZsNone0.0None within 10 Km Radius from the project site
(3.)CorridorsNone0.0None within 10 Km Radius from the project site
(4.)ESAsNone0.0None within 10 Km Radius from the project site
(5.)Critically Polluted AreaNone0.0None within 10 Km Radius from the project site
(6.)NPANone0.0None within 10 Km Radius from the project site
(7.)Wildlife CorridorsNone0.0None within 10 Km Radius from the project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0.0None within 10 Km radius of the project site
(2.)Defence InstallationsNone0.0None within 10 Km radius of the project site
(3.)Archaeological SitesNone0.0None within 10 Km radius of the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0.0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.009
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0.0
(b)No. of Households 0.0
(c)No. of PDFs (Project Displaced Families) 0.0
(d)No. of PAFs (Project Affected Families) 0.0
(e)Funds Allocated for R&R(in Rs) 0.0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hindon River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 1.21
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0.0
(b)Permanent Employment-During Operation 0.0
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 20356
(e)No. of working days 300
(f)Total Manpower 20606
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 3.505
(b)Percentage of Total Project Area 35.02
(c)No. of Plants to be Planted 350
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThis project will improve the surrounding environment by way of green belt development
(2.)SocialThis project will provide social benefits to the surrounding peoples by way of health camp and free education to poor childerens
(3.)FinancialThis project will improve the finacial status of surrounding village peoples by way of providing them employment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 120.9
(b)Total No. of Flats to be Build 26
(c)No. of Buildings 03
(d)Total plot area (sqm) 100095.250
(e)Total built up area (sqm) 408275.476
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 12
    Capacity 28
(b)No. of Recharge Pits 12
    Capacity 28
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4871
5.
Energy Saving Measures:
(a)Source/Mode Solar Panel
(b)Percentage 30
(c)Quantity 3
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area None
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0047
(ii)Name of the EIA Consultant Ambiental Global Private Limited
(iii)Address Plot No. 16, 2nd Floor, Sector 4, Vaishali, Ghaziabad, U.P (201010)
(iv)Mobile No. 9899964079
(v)Landline No. 0120451350
(vi)Email Id info@ambientalglobal.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 17 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSudhanshu Rai
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S ADVANCE COMPUSOFT PVT. LTD
AddressH-110,Ground floor, sector-63, Noida
Print