Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated Paint Manufacturing Unit in Plot No. B-1, D-02 (P), Hi-Tech Valley, Village Dhanansu, Dist. Ludhiana, State Punjab
(b)Name of the Company / Organisation M/S. GRASIM INDUSTRIES LIMITED
(c)Registered Address A 2 Aditya Birla Centre,Mumbai City,Maharashtra-400074
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Chaitanya Kurle
(b)Designation (Owner/ Partner/ CEO) Senior General Manager
(c)Address A 2 Aditya Birla Centre,Mumbai City,Maharashtra-400074
(d)Pin code 400074
(e)E-mail khushbir.singh@adityabirla.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(h) Integrated paint industry
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/PB/IND3/228783/2021
(e)Master Proposal Number(Single Window) SW/243824/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. B-1 and D-02 (P)
(b)Pincode 141112
(c)Bounded Latitudes (North)
From
Degree 30
Minutes 56
Second 10.06
From
Degree 30
Minutes 56
Second 30.49
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 0
Second 1.04
From
Degree 76
Minutes 0
Second 13.15
(e)Survey of India Topo Sheet No. H43K1 H43J13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 245
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 6.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)PunjabLudhianaLudhiana (East)DHANANSU
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per ToR amendment letter
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SOLVENT BASED PAINT60000
(2.)RESIN40000
(3.)EMULSION120000
(4.)WATER BASED PAINTS300000
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)WATER BASED PAINTS300000OthersKLPARoad
(2.)SOLVENT BASED PAINT60000OthersKLPARoad
(3.)RESIN40000OthersKLPARoad
(4.)EMULSION120000OthersKLPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 910
(b) Funds Allocated for Environment Management (Capital) (in crores) 47.8
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 9.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2.96
(e) Funds Allocated for Environment Management Capital(%) 5.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 520000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 520000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Butanol323.04OthersKLLOCALRoad1560 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 09 Oct 2021 To 09 Nov 2021
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube998599100
(2.)PM2.5Micro Gram per Meter Cube66496560
(3.)OthersVOCMicro Gram per Meter Cube1.01.01.0NOT SPECIFIED
(4.)SO2Micro Gram per Meter Cube1891880
(5.)NOxMicro Gram per Meter Cube39143880
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l260110200600
(2.)Chloridesmg/l2272501000
(3.)TDSmg/l6965245002000
(4.)Fluoridemg/l0.310.0511.5
(5.)pHNA7.927.126.58.5
(6.)TSSmg/l0000
(7.)Heavy MetalsNAmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.337.21A
(2.)DOmg/l5.54.7A
(3.)BODmg/l182A
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.251.275
(2.)Leq(Night)A-weighted decibels(dB(A))54.542.970
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)OthersPERCENTAGE0.0570.039
(2.)P(Phosphorus)OthersKH/HA72.620.8
(3.)K(Potassium)OthersG/KG23280.6
(4.)Electric ConductivityOthersµmohs/cm394120
(5.)pH8.326.82
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.32 To 31.22
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.89 To 27.30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPSIEC11580.5Copy of Permission LetterPipelineOthersPIPELINEPSIEC/EE1/1089-9315 Sep 20211158
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC2325STPGreen Belt Renewal Plant23
(2.)INDUSTRIAL119150ETP RO MEEOthersZLD1190
16.1.
(a)Total Waste Water Generation 142
(b)Total Discharged Water 0
(c)Total Reused Water 142
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CONTAMINATED OIL WITH WASH WATER & SLUDGEIndustrial Waste11Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)SLUDGE AND FILTER CONTAMINATED WITH OILIndustrial Waste11Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)WASTE RESIDUE SUCH AS FILTER AIDIndustrial Waste68Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)DISCARDED CONTAINER/ BARREL/LINERIndustrial Waste90Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)SPENT TON EXCHANGE RESIN CONTAINING TOXIC MATERIALIndustrial Waste15Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)CHEMICAL SLUDGE FROM WASTE WATERIndustrial Waste150Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)LEAD ACID BATTERY IN NUMBERSIndustrial Waste375Tons100RoadAuthorized Recyclers
(8.)SPENT CARBONIndustrial Waste7.5Tons0RoadCo-Processing
(9.)CONTAMINATED NAPTHENIC SOLVENTIndustrial Waste128Tons100RoadAuthorized Recyclers
(10.)PROCESS WASTE SLUDGE & RESIDUEIndustrial Waste90Tons100RoadAuthorized Recyclers
(11.)OIL AND GREASE SKIMMING RESIDUEIndustrial Waste15Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)DISCARDED ASBESTOSIndustrial Waste2Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)DISTILLATION RESIDUEIndustrial Waste71Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(14.)DISCARDED CONTAINER BARREL CARBOY DRUM IN NUMBERSIndustrial Waste60000Tons100RoadAuthorized Recyclers
(15.)FLUE GAS CLENING RESIDUEIndustrial Waste15Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)USED /SPENT OILIndustrial Waste38Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(17.)CHEMICAL CONTAINING RESIDUEIndustrial Waste19Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube66006660
(2.)PM10Microgram per Meter Cube940.7500.00694.006100
(3.)NOxMicrogram per Meter Cube270.7500.55127.55180
(4.)SO2Microgram per Meter Cube147500.00614.00680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BOILER (2 TPH)HSD300.5PM10,SO2,NOx
(2.)BOILER (2 TPH)HSD300.5PM10,SO2,NOx
(3.)DG SET ENERGENCY BACK UP 2000 KVAHSD300.3PM10,SO2,NOx
(4.)DG SET ENERGENCY BACK UP 1010 KVAHSD300.3PM10,SO2,NOx
(5.)DG SET ENERGENCY BACK UP 2000 KVAHSD300.3PM10,SO2,NOx
(6.)DG SET EMERGENCY BACK UP 2000 KVAHSD300.3PM10,SO2,NOx
(7.)DG SET EMERGENCY BACK UP 2000 KVAHSD300.3PM10,SO2,NOx
(8.)BOILER (2 TPH)HSD300.5PM10,SO2,NOx
(9.)BOILER (0.5 TPH)HSD300.18PM10,SO2,NOx
(10.)BOILER (2 TPH)HSD300.5PM10,SO2,NOx
(11.)DG SET EMERGENCY BACK UP 1010 KVAHSD300.3PM10,SO2,NOx
(12.)TFH 20 LAC KCALHSD300.55PM10,SO2,NOx
(13.)TFH 20LAC KCALHSD300.55PM10,SO2,NOx
(14.)TFH 20LAC KCALHSD300.55PM10,SO2,NOx
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8200
(b)Source PSIEC NEAREST SUBSTATION
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 6 (4 X 2000 KVA + 2 X 1010 KVA)
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 24.83
(d)Revenue Land 0
(e)Other Land 0
    Total Land 24.83
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 23813
(b)Waste/Barren Land 1642
(c)Grazing/ Community Land 2261
(d)Surface Water Bodies 322
(e)Settlements 2884
(f)Industrial 1434
(g)Forest 1195
(h)Mangroves 0
(i)Marine Area 0
(j)Others : WASTE LAND 1642
    Total 35193
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.9ADMIN BUILDING
(2.)Township00
(3.)Green belt8.19
(4.)Ash Pond0
(5.)Quarry Area0
(6.)OB Dump Area0
(7.)Safety Zone0
(8.)Tailing Pond0
(9.)LandFill0
(10.)Water Reservoir0
(11.)Desalination Plant0
(12.)Area for Solid Waste Management0.09
(13.)Built Up Area1.10PROCESS AREA
(14.)Othersstorage area and utilities14.55DETAILS GIVEN IN EIA
Total 24.83
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA100NA
(2.)ESZsNA100NOT PRESENT
(3.)Wildlife CorridorsNA100NOT PRESENT
(4.)Critically Polluted AreaLUDHIANA6.9NA
(5.)WLSNA100NA
(6.)ESAsNA100NOT PRESENT
(7.)CorridorsNA100NOT PRESENT
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA100NOT PRESENT
(2.)ForestMATTEWARA RF3.66RESERVE FOREST
(3.)Defence InstallationsNA100NOT PRESENT
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 24.83
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species COMMON PEAFOWL
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 350000
(iii)Period of Implementation 5 YEARS
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area VILLAGE WATER BODY
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.41
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 800
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 1300
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 8.1981
(b)Percentage of Total Project Area 33.02
(c)No. of Plants to be Planted 12300
(d)Funds Allocated for Plantation 35000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGREENBELT DEVELOPMENT
(2.)SocialEMPLOYMENT GENERATION
(3.)FinancialREVENUE TO GOVERNMENT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0138
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Vadodara, India – 390 010
(iv)Mobile No. 9510027571
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 25 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChaitanya Kurle
DesignationSenior General Manager
Name of Company (Applicant Name should not be given here)M/S. GRASIM INDUSTRIES LIMITED
AddressA 2 Aditya Birla Centre
Print