| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Integrated Paint Manufacturing Unit in Plot No. B-1, D-02 (P), Hi-Tech Valley, Village Dhanansu, Dist. Ludhiana, State Punjab | | (b)Name of the Company / Organisation | M/S. GRASIM INDUSTRIES LIMITED | | (c)Registered Address | A 2 Aditya Birla Centre,Mumbai City,Maharashtra-400074 | | (d)Legal Status of the Company | Private | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Chaitanya Kurle | | (b)Designation (Owner/ Partner/ CEO) | Senior General Manager | | (c)Address | A 2 Aditya Birla Centre,Mumbai City,Maharashtra-400074 | | (d)Pin code | 400074 | | (e)E-mail | khushbir.singh@adityabirla.com | | (f)Telephone No. | 0- | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 5(h) Integrated paint industry
| | (b)Minor Project/Activity | NIL | | (c)Category | B1 | | (d)Proposal Number | SIA/PB/IND3/228783/2021 | | (e)Master Proposal Number(Single Window) | SW/243824/2021 | | (f)EAC concerned (for category A Projects only) | Industrial Projects - 3 | | (g)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | B-1 and D-02 (P) | | (b)Pincode | 141112 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 30 | | Minutes | 56 | | Second | 10.06 | | From | | | Degree | 30 | | Minutes | 56 | | Second | 30.49 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 76 | | Minutes | 0 | | Second | 1.04 | | From | | | Degree | 76 | | Minutes | 0 | | Second | 13.15 | | (e)Survey of India Topo Sheet No. | H43K1 H43J13 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 245 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 6.5 | | (j)Seismic Zone | 4 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Punjab | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Punjab | Ludhiana | Ludhiana (East) | DHANANSU | |
|
| 6. | | Details of Terms of Reference (ToR): | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (b)Reason | As per ToR amendment letter | | (c)Supporting Document | Copy of Supporting Document | |
|
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | SOLVENT BASED PAINT | 60000 | | | (2.) | RESIN | 40000 | | | (3.) | EMULSION | 120000 | | | (4.) | WATER BASED PAINTS | 300000 | | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | WATER BASED PAINTS | 300000 | Others | KLPA | Road | | | (2.) | SOLVENT BASED PAINT | 60000 | Others | KLPA | Road | | | (3.) | RESIN | 40000 | Others | KLPA | Road | | | (4.) | EMULSION | 120000 | Others | KLPA | Road | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in crores) | 910 | | (b) Funds Allocated for Environment Management (Capital) (in crores) | 47.8 | | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 9.25 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 2.96 | | (e) Funds Allocated for Environment Management Capital(%) | 5.25 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 520000 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 520000 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Butanol | 323.04 | Others | KL | LOCAL | Road | | 1560 | Linkage | | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 09 Oct 2021 To 09 Nov 2021 | | (b)Season | Post-Monsoon | |
|
| 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | PM10 | | Micro Gram per Meter Cube | 99 | 85 | 99 | 100 | | (2.) | PM2.5 | | Micro Gram per Meter Cube | 66 | 49 | 65 | 60 | | (3.) | Others | VOC | Micro Gram per Meter Cube | 1.0 | 1.0 | 1.0 | NOT SPECIFIED | | (4.) | SO2 | | Micro Gram per Meter Cube | 18 | 9 | 18 | 80 | | (5.) | NOx | | Micro Gram per Meter Cube | 39 | 14 | 38 | 80 | |
| 14.2. No. of Ground Water Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | Total Hardness | | | mg/l | | 260 | 110 | 200 | 600 | | (2.) | Chlorides | | | mg/l | | 22 | 7 | 250 | 1000 | | (3.) | TDS | | | mg/l | | 696 | 524 | 500 | 2000 | | (4.) | Fluoride | | | mg/l | | 0.31 | 0.05 | 1 | 1.5 | | (5.) | pH | | | NA | | 7.92 | 7.12 | 6.5 | 8.5 | | (6.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | | (7.) | Heavy Metals | | NA | mg/l | | 0 | 0 | 0 | 0 | |
| 14.3. No. of Surface Water Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | pH | | NA | | 8.33 | 7.21 | A | | (2.) | DO | | mg/l | | 5.5 | 4.7 | A | | (3.) | BOD | | mg/l | | 18 | 2 | A | | (4.) | COD | | mg/l | | 0 | 0 | A | |
| 14.4. No. of Ambient Noise Monitoring Locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 62.2 | 51.2 | 75 | | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.5 | 42.9 | 70 | |
| 14.5. No. of Soil Sample Monitored Locations : 8 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | N(Nitrogen) | Others | PERCENTAGE | 0.057 | 0.039 | | (2.) | P(Phosphorus) | Others | KH/HA | 72.6 | 20.8 | | (3.) | K(Potassium) | Others | G/KG | 232 | 80.6 | | (4.) | Electric Conductivity | Others | µmohs/cm | 394 | 120 | | (5.) | pH | | | 8.32 | 6.82 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.32 To 31.22 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.89 To 27.30 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | PSIEC | 1158 | 0.5 | Copy of Permission Letter | Pipeline | | Others | PIPELINE | PSIEC/EE1/1089-93 | 15 Sep 2021 | 1158 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | DOMESTIC | 23 | 25 | STP | Green Belt Renewal Plant | | 23 | | | (2.) | INDUSTRIAL | 119 | 150 | ETP RO MEE | Others | ZLD | 119 | 0 | |
|
| 16.1. | | (a)Total Waste Water Generation | 142 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 142 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | CONTAMINATED OIL WITH WASH WATER & SLUDGE | Industrial Waste | | 11 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (2.) | SLUDGE AND FILTER CONTAMINATED WITH OIL | Industrial Waste | | 11 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (3.) | WASTE RESIDUE SUCH AS FILTER AID | Industrial Waste | | 68 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (4.) | DISCARDED CONTAINER/ BARREL/LINER | Industrial Waste | | 90 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (5.) | SPENT TON EXCHANGE RESIN CONTAINING TOXIC MATERIAL | Industrial Waste | | 15 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (6.) | CHEMICAL SLUDGE FROM WASTE WATER | Industrial Waste | | 150 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (7.) | LEAD ACID BATTERY IN NUMBERS | Industrial Waste | | 375 | Tons | 100 | Road | | Authorized Recyclers | | | (8.) | SPENT CARBON | Industrial Waste | | 7.5 | Tons | 0 | Road | | Co-Processing | | | (9.) | CONTAMINATED NAPTHENIC SOLVENT | Industrial Waste | | 128 | Tons | 100 | Road | | Authorized Recyclers | | | (10.) | PROCESS WASTE SLUDGE & RESIDUE | Industrial Waste | | 90 | Tons | 100 | Road | | Authorized Recyclers | | | (11.) | OIL AND GREASE SKIMMING RESIDUE | Industrial Waste | | 15 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (12.) | DISCARDED ASBESTOS | Industrial Waste | | 2 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (13.) | DISTILLATION RESIDUE | Industrial Waste | | 71 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (14.) | DISCARDED CONTAINER BARREL CARBOY DRUM IN NUMBERS | Industrial Waste | | 60000 | Tons | 100 | Road | | Authorized Recyclers | | | (15.) | FLUE GAS CLENING RESIDUE | Industrial Waste | | 15 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (16.) | USED /SPENT OIL | Industrial Waste | | 38 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | | (17.) | CHEMICAL CONTAINING RESIDUE | Industrial Waste | | 19 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | PM2.5 | | Microgram per Meter Cube | 66 | 0 | 0 | 66 | 60 | | (2.) | PM10 | | Microgram per Meter Cube | 94 | 0.750 | 0.006 | 94.006 | 100 | | (3.) | NOx | | Microgram per Meter Cube | 27 | 0.750 | 0.551 | 27.551 | 80 | | (4.) | SO2 | | Microgram per Meter Cube | 14 | 750 | 0.006 | 14.006 | 80 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | BOILER (2 TPH) | HSD | 30 | 0.5 | PM10,SO2,NOx | | | | (2.) | BOILER (2 TPH) | HSD | 30 | 0.5 | PM10,SO2,NOx | | | | (3.) | DG SET ENERGENCY BACK UP 2000 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (4.) | DG SET ENERGENCY BACK UP 1010 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (5.) | DG SET ENERGENCY BACK UP 2000 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (6.) | DG SET EMERGENCY BACK UP 2000 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (7.) | DG SET EMERGENCY BACK UP 2000 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (8.) | BOILER (2 TPH) | HSD | 30 | 0.5 | PM10,SO2,NOx | | | | (9.) | BOILER (0.5 TPH) | HSD | 30 | 0.18 | PM10,SO2,NOx | | | | (10.) | BOILER (2 TPH) | HSD | 30 | 0.5 | PM10,SO2,NOx | | | | (11.) | DG SET EMERGENCY BACK UP 1010 KVA | HSD | 30 | 0.3 | PM10,SO2,NOx | | | | (12.) | TFH 20 LAC KCAL | HSD | 30 | 0.55 | PM10,SO2,NOx | | | | (13.) | TFH 20LAC KCAL | HSD | 30 | 0.55 | PM10,SO2,NOx | | | | (14.) | TFH 20LAC KCAL | HSD | 30 | 0.55 | PM10,SO2,NOx | | | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 8200 | | (b)Source | PSIEC NEAREST SUBSTATION | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | 6 (4 X 2000 KVA + 2 X 1010 KVA) | | (e)Stack Height (in m) | 30 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land | 0 | | (b)Private Land | 0 | | (c)Government Land | 24.83 | | (d)Revenue Land | 0 | | (e)Other Land | 0 | | Total Land | 24.83 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area | 23813 | | (b)Waste/Barren Land | 1642 | | (c)Grazing/ Community Land | 2261 | | (d)Surface Water Bodies | 322 | | (e)Settlements | 2884 | | (f)Industrial | 1434 | | (g)Forest | 1195 | | (h)Mangroves | 0 | | (i)Marine Area | 0 | | (j)Others : WASTE LAND | 1642 | | Total | 35193 | |
|
| 22. Land Requirement for Various Activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
|---|
| (1.) | Main Plant | | 0.9 | ADMIN BUILDING | | (2.) | Township | | 0 | 0 | | (3.) | Green belt | | 8.19 | | | (4.) | Ash Pond | | 0 | | | (5.) | Quarry Area | | 0 | | | (6.) | OB Dump Area | | 0 | | | (7.) | Safety Zone | | 0 | | | (8.) | Tailing Pond | | 0 | | | (9.) | LandFill | | 0 | | | (10.) | Water Reservoir | | 0 | | | (11.) | Desalination Plant | | 0 | | | (12.) | Area for Solid Waste Management | | 0.09 | | | (13.) | Built Up Area | | 1.10 | PROCESS AREA | | (14.) | Others | storage area and utilities | 14.55 | DETAILS GIVEN IN EIA | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | NPA | NA | 100 | NA | | (2.) | ESZs | NA | 100 | NOT PRESENT | | (3.) | Wildlife Corridors | NA | 100 | NOT PRESENT | | (4.) | Critically Polluted Area | LUDHIANA | 6.9 | NA | | (5.) | WLS | NA | 100 | NA | | (6.) | ESAs | NA | 100 | NOT PRESENT | | (7.) | Corridors | NA | 100 | NOT PRESENT | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Archaeological Sites | | NA | 100 | NOT PRESENT | | (2.) | Forest | | MATTEWARA RF | 3.66 | RESERVE FOREST | | (3.) | Defence Installations | | NA | 100 | NOT PRESENT | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 24.83 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | 0 | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in Rs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | COMMON PEAFOWL | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | | (i)Uploaded copy of conservation plan | Copy of conservation plan | | (ii)Fund Provision made | 350000 | | (iii)Period of Implementation | 5 YEARS | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | VILLAGE WATER BODY | | (ii)Direction of Water Bodies in Buffer Area | South West | | (iii)Distance of Water Bodies in Buffer Area | 0.41 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 500 | | (c)Temporary Employment- During Construction | 800 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 330 | | (f)Total Manpower | 1300 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt (in hectare) | 8.1981 | | (b)Percentage of Total Project Area | 33.02 | | (c)No. of Plants to be Planted | 12300 | | (d)Funds Allocated for Plantation | 35000000 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Environmental | GREENBELT DEVELOPMENT | | (2.) | Social | EMPLOYMENT GENERATION | | (3.) | Financial | REVENUE TO GOVERNMENT | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For Industrial Projects - 3 |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/1922/RA 0138 | | (ii)Name of the EIA Consultant | Kadam Environmental Consultants | | (iii)Address | 871/B/3, GIDC Makarpura, Vadodara, India – 390 010 | | (iv)Mobile No. | 9510027571 | | (v)Landline No. | 0265613100 | | (vi)Email Id | kadam@kadamenviro.com | | (vii)Category of Accreditation | B | | (viii)Sector of Accreditation | Industrial Projects - 3 | | (ix)Validity of Accreditation | 25 May 2022 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | |
| Addtional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |