Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Nallah Bed Mining Project
(b)Name of the Company / Organisation KHURSHID AHMAD MIR
(c)Registered Address Minor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara,,Pulwama,Jammu and Kashmir-192301
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Khurshid Ahmad Mir
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Minor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara,Pulwama,Jammu and Kashmir-192301
(d)Pin code 192301
(e)E-mail pulwamariver3@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/JK/MIN/63796/2020
(e)Master Proposal Number(Single Window) SW/195533/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Block No. 03
(b)Pincode 192301
(c)Bounded Latitudes (North)
From
Degree 33
Minutes 47
Second 43.46
From
Degree 33
Minutes 47
Second 47.78
(d)Bounded Longitudes (East)
From
Degree 74
Minutes 56
Second 41.02
From
Degree 74
Minutes 56
Second 43.46
(e)Survey of India Topo Sheet No. 43 K/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1655
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirPulwamalitterLassipora
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEAC/JK/20/309
(b)Date of Apply of TOR 24 Sep 2020
(c)Date of Issue of TOR / Standard ToR 21 Nov 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Apr 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 May 2021
Distance of Public Hearing Venue from the Proposed Project :1
Village Lassipora, Tehsil - Litter, District Pulwama, Jammu & Kashmir
State :Jammu and Kashmir
District :Pulwama
Tehsil :litter
Village :Lassipora
14Ecological balance should be maintained while mining of the mineralOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Water Tankers2000 liters1
(2.)Tippers\Trucks55
(3.)Light Vehicles-1
(4.)Excavator0.9 to 1.2 m1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Average Production85019.5Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.3
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.127500
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.38600
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.18
(e) Funds Allocated for Environment Management Capital(%) 9.81
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 126
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 126
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel31500OthersLiter per AnnumNear by petrolRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 07 Oct 2020 To 04 Jan 2021
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube12.86.112.480
(2.)OthersCOMicro Gram per Meter Cube0.630.180.6204
(3.)PM10Micro Gram per Meter Cube81.954.880.9100
(4.)SO2Micro Gram per Meter Cube7.34.67.280
(5.)PM2.5Micro Gram per Meter Cube43.426.942.860
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.010.0111.5
(2.)Total Hardnessmg/l204.3108200600
(3.)pHNA7.497.136.58.5
(4.)TDSmg/l329.5218.85002000
(5.)TSSmg/l0000
(6.)Chloridesmg/l5633.62501000
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.26.0C
(2.)BODmg/l4.03.2C
(3.)pHNA7.87.8C
(4.)CODmg/l7.56.0C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.242.255
(2.)Leq(Night)A-weighted decibels(dB(A))41.735.945
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram14.19.8
(2.)K(Potassium)Milligram per Kilogram95.587
(3.)Electric ConductivityMillisiemens per Centimetre63.435
(4.)pH7.77.05
(5.)P(Phosphorus)Parts per Million64.737.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPHED SUPPLY7.653.04 Not Appliacble modeOthersPHED SUPPLYOthersPHED SUPPLYNA03 Jun 20217.65
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage Waste00Discharge through tankersOthersDischarge through tankers00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over burdenOthersMine Waste0Tons0RoadOthersBackfill
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube7.33.043.210.580
(2.)NOxMicrogram per Meter Cube12.83.0419.932.780
(3.)PM2.5Microgram per Meter Cube43.40.450.5443.9460
(4.)PM10Microgram per Meter Cube81.93.041.0882.98100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set12660.620PM101.08
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 4.37
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.37
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Government land 4.37
    Total 4.37
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area3.6
(2.)OthersBerm Area0.77
Total 4.37
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA00
(2.)ESAsNA00
(3.)WLSNA00
(4.)Wildlife CorridorsNA00
(5.)Critically Polluted AreaNA00
(6.)ESZsNA00
(7.)CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Archaeological SitesNA00
(3.)Defence InstallationsKoil Airforce Station9.17NNE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.37
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Whole Land Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 9
(d)Temporary Employment- During Operation 10
(e)No. of working days 250
(f)Total Manpower 19
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 7500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEnhance the revenue of state government
(2.)FinancialEnhance the revenue of state government
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Nallah Bed MiningMinor
2.
Mine Capacity in ROM (Run of Mine) 369650
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 116-120
(b)Date of Approval 08 Jun 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 4.37
(f)Approved Capacity 425097.5
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 437000
(b)Mineable Reserves (Million Ton) 369650
(c)Extractable Reserves(Million Ton) 369650
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.37
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 27 Mar 2020
(iii)Validity of LOI 5
(iv)Reference No. of LOI 522/MCC/DGM/EAP/20/B-3/2979-86
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NA
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 4.37
(b)Depth (in meter) 1
(c)Volume (in Million Cubic meter) 0.036965
12.
Details of Quarry:
(a)Final Void of 3.6 (hectare) at a Depth of 1 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 4.37
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)SETTLEMENTS000
(3.)WASTE LAND000
(4.)GRAZING LAND000
(5.)OTHERS(Specify)Government Land4.3704.37
(6.)FOREST LAND000
(7.)SURFACE WATER BODIES000
TOTAL4.3704.37
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)VIRGIN AREA0000
(2.)OtherBerm area000.770.77
(3.)GREEN BELT0000
(4.)EXTERNAL OB DUMPS0000
(5.)INTERNAL OB DUMPS0000
(6.)ROADS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)EXCAVATION/QUARRY003.63.6
(9.)TOP SOIL STORAGE0000
TOTAL004.3704.37
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA0063
(ii)Name of the EIA Consultant Atmos Sustainable Solution Pvt. Ltd.
(iii)Address Noida
(iv)Mobile No. 9810085736
(v)Landline No. 9810085736
(vi)Email Id mervyn.atmos@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 08 Sep 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)14/06/2021Pl upload all the document as per check list.
(2.)08/08/2021The correction have been made as per the instruction received
(3.)09/08/2021pl upload F2, Appreciation note, Buffer map 10 Kms, Cremation Map, Monitoring Pictures, Rectify Total Project cost (include processing fee, Public haring fee, surveillance, consultancy fee etc), EMP is 5% and CER 2% of total project cost should be mentioned in EIA/PFR, lab text report is not readable pl upload readable. kindly read minutes of 50th JKEAC meeting and upload the desirable documents accordingly.
(4.)16/08/2021The correction have been made as per the instruction received
(5.)16/08/2021upload and rectify documents as per previous EDS.
(6.)23/08/2021The correction have been made as per the instruction received
(7.)01/09/2021Appreciation note is not correct kindly rectify the cost, EC processing fee, consultancy fee and other cost should be included in total project cost. uploaded lab test reports are not readable pl upload readable. every page of the whole document is stamped and signed by Consultant and PP.
(8.)22/09/2021The correction have been made as per the instruction received
(9.)24/09/2021Pl upload Monitoring Photos, Public hearing report is incomplete, Test report is not stamp and signed by concerned authority, Include various costs in total project cost table i.e. consultancy/Public hearing/Processing fee etc in EIA report, revised specific gravity (2) for total mineral production calculation in EIA report. Revised EMP cost and other cost should be rectified in PFR/EIA/other document on basis of which your appreciation note should be formulated.
(10.)11/10/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)08/11/2021details are in pdf attachedADS Letter
(2.)08/11/2021Please Sir find the reply as per MOM.ADS Letter
(3.)09/11/2021Kindly make proper compliances as per ADS letter already enclosed.
(4.)09/11/2021Please sir find the reply as per MOM.ADS Letter
(5.)29/11/2021Details are in pdf attached.ADS Letter
(6.)30/11/2021Please sir find the report as per MOM.ADS Letter
(7.)13/12/2021Pl upload Revised LOI.
(8.)29/12/2021Please find the attachment Extension of Letter of Intent.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKhurshid Ahmad Mir
DesignationOwner
Name of Company (Applicant Name should not be given here)KHURSHID AHMAD MIR
AddressMinor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara
Print