| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Nallah Bed Mining Project | | (b)Name of the Company / Organisation | KHURSHID AHMAD MIR | | (c)Registered Address | Minor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara,,Pulwama,Jammu and Kashmir-192301 | | (d)Legal Status of the Company | Others | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Khurshid Ahmad Mir | | (b)Designation (Owner/ Partner/ CEO) | Owner | | (c)Address | Minor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara,Pulwama,Jammu and Kashmir-192301 | | (d)Pin code | 192301 | | (e)E-mail | pulwamariver3@gmail.com | | (f)Telephone No. | 0- | | (g)Fax No. | | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 1(a) Mining of minerals
| | (b)Minor Project/Activity | NIL | | (c)Category | B1 | | (d)Proposal Number | SIA/JK/MIN/63796/2020 | | (e)Master Proposal Number(Single Window) | SW/195533/2021 | | (f)EAC concerned (for category A Projects only) | Non-Coal Mining | | (g)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | Block No. 03 | | (b)Pincode | 192301 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 33 | | Minutes | 47 | | Second | 43.46 | | From | | | Degree | 33 | | Minutes | 47 | | Second | 47.78 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 74 | | Minutes | 56 | | Second | 41.02 | | From | | | Degree | 74 | | Minutes | 56 | | Second | 43.46 | | (e)Survey of India Topo Sheet No. | 43 K/13 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1655 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 5 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Jammu and Kashmir | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Jammu and Kashmir | Pulwama | litter | Lassipora | |
|
| 6. | | Details of Terms of Reference (ToR): | | (a)MoEF&CC / SEIAA File Number | SEAC/JK/20/309 | | (b)Date of Apply of TOR | 24 Sep 2020 | | (c)Date of Issue of TOR / Standard ToR | 21 Nov 2020 | | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 10 May 2021 | | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Village Lassipora, Tehsil - Litter, District Pulwama, Jammu & Kashmir | | State : | Jammu and Kashmir | | District : | Pulwama | | Tehsil : | litter | | Village : | Lassipora |
| 14 | Ecological balance should be maintained while mining of the mineral | Others | Additional District Magistrate | |
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Water Tankers | 2000 liters | 1 | | (2.) | Tippers\Trucks | 5 | 5 | | (3.) | Light Vehicles | - | 1 | | (4.) | Excavator | 0.9 to 1.2 m | 1 | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Average Production | 85019.5 | Tons per Annum | | Road | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in crores) | 1.3 | | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.127500 | | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.38600 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.18 | | (e) Funds Allocated for Environment Management Capital(%) | 9.81 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 126 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 126 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Diesel | 31500 | Others | Liter per Annum | Near by petrol | Road | | 1 | Open Market | | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 07 Oct 2020 To 04 Jan 2021 | | (b)Season | Post-Monsoon | |
|
| 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | NOx | | Micro Gram per Meter Cube | 12.8 | 6.1 | 12.4 | 80 | | (2.) | Others | CO | Micro Gram per Meter Cube | 0.63 | 0.18 | 0.62 | 04 | | (3.) | PM10 | | Micro Gram per Meter Cube | 81.9 | 54.8 | 80.9 | 100 | | (4.) | SO2 | | Micro Gram per Meter Cube | 7.3 | 4.6 | 7.2 | 80 | | (5.) | PM2.5 | | Micro Gram per Meter Cube | 43.4 | 26.9 | 42.8 | 60 | |
| 14.2. No. of Ground Water Monitoring Locations : 5 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | Fluoride | | | mg/l | | 0.01 | 0.01 | 1 | 1.5 | | (2.) | Total Hardness | | | mg/l | | 204.3 | 108 | 200 | 600 | | (3.) | pH | | | NA | | 7.49 | 7.13 | 6.5 | 8.5 | | (4.) | TDS | | | mg/l | | 329.5 | 218.8 | 500 | 2000 | | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | | (6.) | Chlorides | | | mg/l | | 56 | 33.6 | 250 | 1000 | |
| 14.3. No. of Surface Water Monitoring Locations : 3 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | DO | | mg/l | | 7.2 | 6.0 | C | | (2.) | BOD | | mg/l | | 4.0 | 3.2 | C | | (3.) | pH | | NA | | 7.8 | 7.8 | C | | (4.) | COD | | mg/l | | 7.5 | 6.0 | C | |
| 14.4. No. of Ambient Noise Monitoring Locations : 8 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 51.2 | 42.2 | 55 | | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.7 | 35.9 | 45 | |
| 14.5. No. of Soil Sample Monitored Locations : 5 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | N(Nitrogen) | Milligram per Kilogram | | 14.1 | 9.8 | | (2.) | K(Potassium) | Milligram per Kilogram | | 95.5 | 87 | | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 63.4 | 35 | | (4.) | pH | | | 7.7 | 7.05 | | (5.) | P(Phosphorus) | Parts per Million | | 64.7 | 37.1 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 35 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 45 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | PHED SUPPLY | 7.65 | 3.04 | Not Appliacble | modeOthers | PHED SUPPLY | Others | PHED SUPPLY | NA | 03 Jun 2021 | 7.65 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Sewage Waste | 0 | 0 | Discharge through tankers | Others | Discharge through tankers | 0 | 0 | |
|
| 16.1. | | (a)Total Waste Water Generation | 0 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 0 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Over burden | Others | Mine Waste | 0 | Tons | 0 | Road | | Others | Backfill | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | SO2 | | Microgram per Meter Cube | 7.3 | 3.04 | 3.2 | 10.5 | 80 | | (2.) | NOx | | Microgram per Meter Cube | 12.8 | 3.04 | 19.9 | 32.7 | 80 | | (3.) | PM2.5 | | Microgram per Meter Cube | 43.4 | 0.45 | 0.54 | 43.94 | 60 | | (4.) | PM10 | | Microgram per Meter Cube | 81.9 | 3.04 | 1.08 | 82.98 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | DG Set | 126 | 6 | 0.620 | PM10 | | 1.08 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | | (b)Source | 0 | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | 0 | | (e)Stack Height (in m) | 0 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land | 0 | | (b)Private Land | 0 | | (c)Government Land | 4.37 | | (d)Revenue Land | 0 | | (e)Other Land | 0 | | Total Land | 4.37 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area | 0 | | (b)Waste/Barren Land | 0 | | (c)Grazing/ Community Land | 0 | | (d)Surface Water Bodies | 0 | | (e)Settlements | 0 | | (f)Industrial | 0 | | (g)Forest | 0 | | (h)Mangroves | 0 | | (i)Marine Area | 0 | | (j)Others : Government land | 4.37 | | Total | 4.37 | |
|
| 22. Land Requirement for Various Activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
|---|
| (1.) | Quarry Area | | 3.6 | | | (2.) | Others | Berm Area | 0.77 | | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | NPA | NA | 0 | 0 | | (2.) | ESAs | NA | 0 | 0 | | (3.) | WLS | NA | 0 | 0 | | (4.) | Wildlife Corridors | NA | 0 | 0 | | (5.) | Critically Polluted Area | NA | 0 | 0 | | (6.) | ESZs | NA | 0 | 0 | | (7.) | Corridors | NA | 0 | 0 | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Forest | | NA | 0 | 0 | | (2.) | Archaeological Sites | | NA | 0 | 0 | | (3.) | Defence Installations | | Koil Airforce Station | 9.17 | NNE | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
| 25. | | Tree Cutting: | | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 4.37 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | Whole Land Acquired | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in Rs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | No | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | No | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | No | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 0 | | (b)Permanent Employment-During Operation | 0 | | (c)Temporary Employment- During Construction | 9 | | (d)Temporary Employment- During Operation | 10 | | (e)No. of working days | 250 | | (f)Total Manpower | 19 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt (in hectare) | 0 | | (b)Percentage of Total Project Area | 0.00 | | (c)No. of Plants to be Planted | 100 | | (d)Funds Allocated for Plantation | 7500 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Financial | Enhance the revenue of state government | | (2.) | Financial | Enhance the revenue of state government | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For Non-Coal Mining |
|
| 1. No. of Mineral(s) to be Mined : 1 |
|---|
| S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
|---|
| (1.) | Nallah Bed Mining | Minor | |
|
| 2. | | Mine Capacity in ROM (Run of Mine) | 369650 | |
|
|
| 4. | | Mining Plan: | | (a)Approval Letter No. | 116-120 | | (b)Date of Approval | 08 Jun 2020 | | (c)Approved Letter | Copy of Approved Letter | | (d)Approved By State Mining and Geology Department | State | | (e)Approved Mining Lease Area | 4.37 | | (f)Approved Capacity | 425097.5 | |
|
| 5. | | Technical Details: | | (a)Total Geological Reserves (Million Ton) | 437000 | | (b)Mineable Reserves (Million Ton) | 369650 | | (c)Extractable Reserves(Million Ton) | 369650 | | (d)Percent(%) of Extraction | 100 | | (e)Grade of Coal /Ore /Mineral | 1 | | (f)Stripping Ratio | 0 : 0 | | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | | (h)Average Gradient(Degree) | 45 | | (i)Mining Method | Opencast | | (j)Life of Mine (Years) | 5 | |
|
| 6. | | Details of Beneficiations: | | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
| 7. | | Details of Seams: | | (a)Whether details of seam applicable | No | |
|
| 8. | | Details of Mining Lease: | | (a)Mining Lease Area (in Hectare) | 4.37 | | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | | (i)Copy of Letter of Intent | Copy of Letter of Intent | | (ii)Date of issue of LOI | 27 Mar 2020 | | (iii)Validity of LOI | 5 | | (iv)Reference No. of LOI | 522/MCC/DGM/EAP/20/B-3/2979-86 | | (c)Whether Lease Deed Executed ? | No | | (i)Reason thereof | NA | | (d)Whether Lease Deed Renewed ? | No | | (i)Reason thereof | NA | |
|
| 9. | | OB (Over Burden) Management: | | (a) Details of External Dumps: | | (i)No. of OB Dumps | 0 | | (ii)Total Area (in Hectare) | 0 | | (iii)Height (in meter) | 0 | | (iv)Quantity (in Million Cubic meter) | 0 | | (v)No. of year back fill up | 0 | | (b) Details of Internal Dumps: | | (i)No. of Internal Dumps | 0 | | (ii)Total Area (in Hectare) | 0 | | (iii)Height (in meter) | 0 | | (iv)Quantity (in Million Cubic meter) | 0 | |
|
| 10. | | Details of Topsoil Management: | | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
| 11. | | Details of Final Mine Void: | | (a)Area (in Hectare) | 4.37 | | (b)Depth (in meter) | 1 | | (c)Volume (in Million Cubic meter) | 0.036965 | |
|
| 12. | | Details of Quarry: | | (a)Final Void of 3.6 (hectare) at a Depth of 1 meter which is Proposed to be Converted into a Water Body. | | (b)Total Quarry Area (ha) | 4.37 | |
|
| 13. | | Details of Transportation: | | (a)In Pit/Underground to Surface | 0 | | (b)Surface to Siding/Loading | 0 | | (c)Transportation / Conveyor Details | 0 | |
|
|
| 14. Details of Land Usage (Pre-Mining) |
|---|
| S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
|---|
| (1.) | AGRICULTURE LAND | | 0 | 0 | 0 | | (2.) | SETTLEMENTS | | 0 | 0 | 0 | | (3.) | WASTE LAND | | 0 | 0 | 0 | | (4.) | GRAZING LAND | | 0 | 0 | 0 | | (5.) | OTHERS(Specify) | Government Land | 4.37 | 0 | 4.37 | | (6.) | FOREST LAND | | 0 | 0 | 0 | | (7.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 4.37 | 0 | 4.37 | |
|
| 15. Details of Land Usage (Post-Mining) |
|---|
| S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
|---|
| (1.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | | (2.) | Other | Berm area | 0 | 0 | 0.77 | | 0.77 | | (3.) | GREEN BELT | | 0 | 0 | 0 | | 0 | | (4.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | | (5.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | | (6.) | ROADS | | 0 | 0 | 0 | | 0 | | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | | (8.) | EXCAVATION/QUARRY | | 0 | 0 | 3.6 | | 3.6 | | (9.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 0 | 0 | 4.37 | 0 | 4.37 | |
| 16. | | Details of Reclamation: | | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | | (a)External OB Dump(in hectare) | 0 | | (b)Internal Dump(in hectare) | 0 | | (c)Quarry(in hectare) | 0 | | (d)Safety Zone(in hectare) | 0 | | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | | (f)Density of Tree Plantation per ha (in no.) | 0 | | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | | (h)Total afforestation plant (in hectare) | 0 | |
|
| 17. | | Status of progressive Mining Closure Plan: | | Details Not Applicable | |
|
| 18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
|---|
| S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
|---|
| (1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/2023/IA0063 | | (ii)Name of the EIA Consultant | Atmos Sustainable Solution Pvt. Ltd. | | (iii)Address | Noida | | (iv)Mobile No. | 9810085736 | | (v)Landline No. | 9810085736 | | (vi)Email Id | mervyn.atmos@gmail.com | | (vii)Category of Accreditation | B | | (viii)Sector of Accreditation | Non-Coal Mining | | (ix)Validity of Accreditation | 08 Sep 2023 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| (1.) | 14/06/2021 | Pl upload all the document as per check list. | | | (2.) | 08/08/2021 | The correction have been made as per the instruction received | | | (3.) | 09/08/2021 | pl upload F2, Appreciation note, Buffer map 10 Kms, Cremation Map, Monitoring Pictures, Rectify Total Project cost (include processing fee, Public haring fee, surveillance, consultancy fee etc), EMP is 5% and CER 2% of total project cost should be mentioned in EIA/PFR, lab text report is not readable pl upload readable. kindly read minutes of 50th JKEAC meeting and upload the desirable documents accordingly. | | | (4.) | 16/08/2021 | The correction have been made as per the instruction received | | | (5.) | 16/08/2021 | upload and rectify documents as per previous EDS. | | | (6.) | 23/08/2021 | The correction have been made as per the instruction received | | | (7.) | 01/09/2021 | Appreciation note is not correct kindly rectify the cost, EC processing fee, consultancy fee and other cost should be included in total project cost. uploaded lab test reports are not readable pl upload readable. every page of the whole document is stamped and signed by Consultant and PP. | | | (8.) | 22/09/2021 | The correction have been made as per the instruction received | | | (9.) | 24/09/2021 | Pl upload Monitoring Photos, Public hearing report is incomplete, Test report is not stamp and signed by concerned authority, Include various costs in total project cost table i.e. consultancy/Public hearing/Processing fee etc in EIA report, revised specific gravity (2) for total mineral production calculation in EIA report. Revised EMP cost and other cost should be rectified in PFR/EIA/other document on basis of which your appreciation note should be formulated. | | | (10.) | 11/10/2021 | The correction have been made as per the instruction received | | |
| Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| (1.) | 08/11/2021 | details are in pdf attached | ADS Letter | | (2.) | 08/11/2021 | Please Sir find the reply as per MOM. | ADS Letter | | (3.) | 09/11/2021 | Kindly make proper compliances as per ADS letter already enclosed. | | | (4.) | 09/11/2021 | Please sir find the reply as per MOM. | ADS Letter | | (5.) | 29/11/2021 | Details are in pdf attached. | ADS Letter | | (6.) | 30/11/2021 | Please sir find the report as per MOM. | ADS Letter | | (7.) | 13/12/2021 | Pl upload Revised LOI. | | | (8.) | 29/12/2021 | Please find the attachment Extension of Letter of Intent. | ADS Letter | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Khurshid Ahmad Mir | | Designation | Owner | | Name of Company (Applicant Name should not be given here) | KHURSHID AHMAD MIR | | Address | Minor Mineral Block 03, C- Lassipora SIDCO Bridge D/Stream Nallah Rambiara |
|