Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Riverbed Material of Minor Mineral Block No.24 from Chenab River at village- Pandhal & Jerri, Tehsil & District Reasi, State J&K.
(b)Name of the Company / Organisation M/S UMESH KUMAR
(c)Registered Address Saroop Nagar,Ludhiana,,Ludhiana,Punjab-141001
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Umesh Kumar
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Saroop Nagar,Ludhiana,,Ludhiana (East),Ludhiana,Punjab-141001
(d)Pin code 141001
(e)E-mail umesh.kumar.ec1@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/JK/MIN/54791/2020
(e)Master Proposal Number(Single Window) SW/209273/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Block No. 24
(b)Pincode 182311
(c)Bounded Latitudes (North)
From
Degree 33
Minutes 1
Second 30.21
From
Degree 33
Minutes 1
Second 48.96
(d)Bounded Longitudes (East)
From
Degree 74
Minutes 47
Second 18.10
From
Degree 74
Minutes 47
Second 31.95
(e)Survey of India Topo Sheet No. 43K/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 356
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirReasiReasiPandhal and Jerri
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number JKEIAA/2020/216
(b)Date of Apply of TOR 16 Jul 2020
(c)Date of Issue of TOR / Standard ToR 17 Aug 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Feb 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Mar 2021
Distance of Public Hearing Venue from the Proposed Project :0.10
Village- Pandhal and Jerri
State :Jammu and Kashmir
District :Reasi
Tehsil :Reasi
Village :Pandhal and Jerri
150No major issues were raised. People were concerned about the employment opportunities.District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)sand/7.54169650Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto 02 Apr 2021
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 3.3014
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.0407
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0515
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.053
(e) Funds Allocated for Environment Management Capital(%) 1.23
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANARoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube8.64.58.5180
(2.)PM10Micro Gram per Meter Cube54.135.153.50100
(3.)NOxMicro Gram per Meter Cube15.27.114.6980
(4.)PM2.5Micro Gram per Meter Cube23.315.022.9360
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l55.8643.782501000
(2.)Fluoridemg/l0011.5
(3.)Heavy MetalsLeadmg/l000.010
(4.)TSSmg/l0000
(5.)TDSmg/l3692855002000
(6.)pHNA8.636.676.58.5
(7.)Total Hardnessmg/l183.65161.31200600
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00B
(2.)pHNA7.817.24B
(3.)CODmg/l00B
(4.)DOmg/l00B
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))50.2035.070
(2.)Leq(Day)A-weighted decibels(dB(A))65.240.6575
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.207.62
(2.)Electric ConductivityMillisiemens per Centimetre441403
(3.)P(Phosphorus)Milligram per Kilogram10.79.36
(4.)N(Nitrogen)Percent0.120.07
(5.)K(Potassium)Milligram per Kilogram99.1291.82
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.9 To 5.3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.2 To 3.2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPrivate water tanker4.50 Not Appliacble modeOtherswater tankerOthersNA001 Jan 20214.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000Others000
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)0Others00Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube53.50053.5100
(2.)NOxMicrogram per Meter Cube14.690014.6980
(3.)SO2Microgram per Meter Cube8.51008.5180
(4.)PM2.5Microgram per Meter Cube22.930022.9360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source from nearby village, if required
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 7.54
(d)Revenue Land 0
(e)Other Land 0
    Total Land 7.54
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 7.54
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Riverbed mining (unused land) 0
    Total 7.54
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersNone00
Total 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0Nil
(2.)ESZsNil0Nil
(3.)Wildlife CorridorsNil0Nil
(4.)WLSNil0Nil
(5.)Critically Polluted AreaNil0Nil
(6.)CorridorsNil0Nil
(7.)NPANil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0-
(2.)Defence InstallationsNil0-
(3.)Archaeological SitesNil0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.54
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Riverbed mining on Chenab river bed
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Anji Khad
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 10
(e)No. of working days 270
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.48
(b)Percentage of Total Project Area 32.89
(c)No. of Plants to be Planted 75
(d)Funds Allocated for Plantation 75000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialproject will provide employment opportunity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SandMinor
2.
Mine Capacity in ROM (Run of Mine) 169650
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. DGM/DYDIV(MS)/RMP/155-58
(b)Date of Approval 14 Jun 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 7.54
(f)Approved Capacity 344845
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.508950
(b)Mineable Reserves (Million Ton) 0.344845
(c)Extractable Reserves(Million Ton) 0.169650
(d)Percent(%) of Extraction 50
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 0
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 7.54
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 27 Mar 2020
(iii)Validity of LOI 1
(iv)Reference No. of LOI 511/MCC/DGM/LOI/R/20/2875-81
(c)Whether Lease Deed Executed ? No
(i)Reason thereof New lease
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NEW LEASE
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 1 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 7.54
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading LOADING
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)SETTLEMENTS000
(3.)FOREST LAND000
(4.)GRAZING LAND000
(5.)SURFACE WATER BODIES000
(6.)WASTE LAND7.5407.54
TOTAL7.5407.54
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)VIRGIN AREA0000
(2.)ROADS0000
(3.)EXCAVATION/QUARRY007.547.54
(4.)EXTERNAL OB DUMPS0000
(5.)INTERNAL OB DUMPS0000
(6.)TOP SOIL STORAGE0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)GREEN BELT0000
TOTAL007.5407.54
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 7.54
(d)Safety Zone(in hectare) 0.58
(e)Final Void of 7.54 (hectare) at a Depth of 1 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2.45
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 10
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0053
(ii)Name of the EIA Consultant P and M Solution
(iii)Address 1st Floor, C-88, B Block, Sector 65, Noida, Uttar Pradesh 201301
(iv)Mobile No. 8826287364
(v)Landline No. 0120432172
(vi)Email Id pmsolutionbxr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 10 Dec 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)22/04/2021Pl upload NOC Forest Deptt., Cremation Ground Map, Form 2, Separate Mining Plan & LOI of each case, Flora and fauna with pictures.
(2.)22/04/2021The correction have been made as per the instruction received
(3.)24/04/2021Pl upload NOC Forest Deptt., Cremation Ground Map, Form 2, Separate Mining Plan & LOI of each case, Flora and fauna with pictures.
(4.)18/05/2021The correction have been made as per the instruction received
(5.)20/05/2021Pl upload NOC Forest Deptt., Cremation Ground Map, Separate Mining Plan & LOI of each case, some links are not opening (Copy of EIA/EMP(Annexures) & Copy of EIA/EMP(Maps/Plans/Figures only)
(6.)21/05/2021The correction have been made as per the instruction received
(7.)03/06/2021Each and every page of EIA/EMP report, F2, PFR should be signed and stamp by both PP and Consultant, Approved Mining Plan should be properly signed and stamp by concerned authority on each and every page, every page of Lab test report should be stamped and signed by both DMO and local sarpanch, Site photograph uploaded should be digital along with capture dates and must be attested and sampling photograph should be properly shown with reading (date wise sheets).
(8.)24/06/2021The correction have been made as per the instruction received
(9.)30/06/2021Pl upload Mining site photographs.
(10.)01/08/2021The correction have been made as per the instruction received
(11.)02/08/2021Upload Form 2, DSR, Monitoring Photos, CSR.
(12.)03/08/2021The correction have been made as per the instruction received
(13.)16/09/2021Pl rectify EIA Report (Land use table 100% with map, flora/Fauna, Monitoring tables, Surveillance budget table), Appreciation Note, digital Site photos with date and time, Route map, rectify GEO coordinate in PFR.
(14.)16/09/2021The correction have been made as per the instruction received
(15.)16/09/2021your additional link is not opening, uploaded Approved Mining plan is not readable.
(16.)17/09/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)18/10/2021Details are in pdf attachedADS Letter
(2.)23/10/2021The reply is being submittedADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUmesh Kumar
DesignationOwner
Name of Company (Applicant Name should not be given here)M/S UMESH KUMAR
AddressSaroop Nagar,Ludhiana
Print