Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed All India Institute of Medical Sciences 'AIIMS Awantipora Kashmir'
(b)Name of the Company / Organisation ALL INDIA INSTITUTE OF MEDICAL SCIENCES (AIIMS) RISHIKESH
(c)Registered Address Awantipora District - Pulwama Jammu & Kashmir,,Pulwama,Jammu and Kashmir-192122
(d)Legal Status of the Company Central Government
2.
Address for the correspondence:
(a)Name of the Applicant Anurag Singh
(b)Designation (Owner/ Partner/ CEO) Superintending Engineer
(c)Address AIIMS Virbhadra Road Shivaji Near Barrage Sturida Colony Rishikesh Uttarakhand,,Tehri,Tehri Garhwal,Uttarakhand-249203
(d)Pin code 249203
(e)E-mail aiimssrinagar20@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/Activity8(b) Townships and Area Development projects.
(c)Category B1
(d)Proposal Number SIA/JK/MIS/61119/2020
(e)Master Proposal Number(Single Window) SW/199725/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Awantipora District- Pulwama of the Indian Union T
(b)Pincode 192122
(c)Bounded Latitudes (North)
From
Degree 335615.6540
Minutes
Second
From
Degree 335652.7424
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 750051.3580
Minutes
Second
From
Degree 750146.0920
Minutes
Second
(e)Survey of India Topo Sheet No. Landsat8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1500
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirPulwamaawantiporaAwantipora
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number JKEIA/2020/368/1252-55
(c)Date of Apply of TOR 17 Sep 2020
(d)Date of Issue of TOR / Standard ToR 11 Nov 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Its is Building Construction Project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Landscape Area of the project350620.00 sqm46.14% of the plot area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built Up Area of the site234614OtherssqmOthersNo
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1577
(b) Funds Allocated for Environment Management (Capital) (in crores) 16.29
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.64
(e) Funds Allocated for Environment Management Capital(%) 1.03
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)*0OthersNA.Road1 OthersNoCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Sep 2020 To 15 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube724471.5100
(2.)PM2.5Micro Gram per Meter Cube362034.060
(3.)SO2Micro Gram per Meter Cube9.95.49.880
(4.)OthersCOMili Gram per Meter Cube0.560.230.544.0
(5.)NOxMicro Gram per Meter Cube25.87.125.280
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l9674100200
(2.)Total Hardnessmg/l174142300600
(3.)Heavy MetalsMgmg/l16.812.730100
(4.)OthersIronmg/l0.050.050.30
(5.)TDSmg/l2722245002000
(6.)Fluoridemg/l0.30.21.01.5
(7.)pHOthers-7.466.988.50
(8.)Chloridesmg/l22182501000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l118B
(2.)pHOthers-7.457.38B
(3.)DOmg/l7.67.5B
(4.)BODmg/l22B
(5.)OthersIronmg/l0.130.11B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))554145
(2.)Leq(Day)A-weighted decibels(dB(A))624655
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers-7.817.05
(2.)N(Nitrogen)Kilogram per hectare421317
(3.)K(Potassium)Kilogram per hectare298102
(4.)Electric ConductivityOthersdm/s0.330.19
(5.)P(Phosphorus)Kilogram per hectare28.621.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater19211Copy of Permission LetterPipelineTube Well4151-5502 Jan 20211276
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water817925STPReuse within the Plant & Recycling817
16.1.
(a)Total Waste Water Generation 817
(b)Total Discharged Water 0
(c)Total Reused Water 817
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio Medical Waste generationBio-Medical Waste3.205Tons1RoadAuthorized Recyclers
(2.)Municipal solid waste generationMunicipal Solid Waste7.06Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63.210.00763.207100
(2.)SO2Microgram per Meter Cube8.110.028.1280
(3.)PM2.5Microgram per Meter Cube2910.00729.00760
(4.)Others(Specify)CONA0.4210.00010.42014.0
(5.)NOxMicrogram per Meter Cube19.910.00119.90180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets 3*2000kVAdiesel60.06NOx0.001
(2.)DG Sets 3*2000kVADiesel60.06PM2.50.00001
(3.)DG Sets 2*1500kVADiesel60.03PM100.00033
(4.)DG Set 2*1500kVADiesel60.03SO20.0012
(5.)DG Sets 2*1500kVADiesel60.03NOx0.00015
(6.)DG Sets 3*2000kVADiesel60.06PM100.00033
(7.)DG Sets 3*2000kVADiesel60.06SO20.0013
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 14925
(b)Source JKPDD
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3*2000kVA 2*1500kVA 2*2000kVA 3*750kVA 3*750kVA fo
(e)Stack Height (in m) 66
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 75.99
(d)Revenue Land 0
(e)Other Land 0
    Total Land 75.99
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 17289.50
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 405.11
(e)Settlements 1508.20
(f)Industrial 0
(g)Forest 6623.98
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Agriculture fallowland-9624.19; Airforce station - 9775.93
    Total 35602.72
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt35.06Landscape Area
Total 35.06
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaAwantipora1.87*
(2.)WLSOver Aru Wildlife Sanctuary29.49*
(3.)NPABharat Kashmir National Park21.46NW
(4.)Wildlife CorridorsAchabal Wildlife Sanctuary37.15SE
(5.)ESZsDachigam National Park21.72NNW
(6.)CorridorsNo0*
(7.)ESAsJhelum River2.30SW
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestShankaracharya Rerserved Forest22.42NW
(2.)Archaeological SitesNo0*
(3.)Defence InstallationsNo0*
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1268
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 75.99
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jhelum River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2.30
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 250
(b)Permanent Employment-During Operation 400
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 1050
(e)No. of working days 270
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 35.06
(b)Percentage of Total Project Area 46.14
(c)No. of Plants to be Planted 9500
(d)Funds Allocated for Plantation 125
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSTP ETP Greenbelt Solar RWH
(2.)FinancialHospital Medical college Institute Residential Building
(3.)SocialAll India Institute of Medical Sciences
(4.)SocialAll India Institute of Medical Sciences
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 60
(b)Total No. of Flats to be Build 193
(c)No. of Buildings 10
(d)Total plot area (sqm) 759878.23
(e)Total built up area (sqm) 234614
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 20
    Capacity 1150.34
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 3434 ECS
5.
Energy Saving Measures:
(a)Source/Mode Solar Power
(b)Percentage 4.18
(c)Quantity 500
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA0063
(ii)Name of the EIA Consultant Atmos Sustainable Solutions Pvt. Ltd.
(iii)Address A-73, 3rd floor, Sector-65, Noida,Uttar Pradesh-201301
(iv)Mobile No. 9810085736
(v)Landline No. 0120435288
(vi)Email Id info@atmosorg.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Sep 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnurag Singh
DesignationSuperintending Engineer
Name of Company (Applicant Name should not be given here)ALL INDIA INSTITUTE OF MEDICAL SCIENCES (AIIMS) RISHIKESH
AddressAwantipora District - Pulwama Jammu & Kashmir
Print