Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Permanent Campus of IIT Jammu Phase1C
(b)Name of the Company / Organisation INDIAN INSTITUTE OF TECHNOLOGY JAMMU, JAMMU & KASHMIR
(c)Registered Address Village- Jagti, Block- Dansal, District- Jammu, Jammu Kashmir,,Jammu,Jammu and Kashmir-181221
(d)Legal Status of the Company Central Government
2.
Address for the correspondence:
(a)Name of the Applicant AC Patel
(b)Designation (Owner/ Partner/ CEO) AW
(c)Address Indian Institute of Technology Jammu, P.O Jagti, Nagrota, Jammu Jammu and Kashmir,,Jammu,Jammu,Jammu and Kashmir-181221
(d)Pin code 181221
(e)E-mail jammukashmir019@gmail.com
(f)Telephone No. 120-4352889
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/Activity8(b) Townships and Area Development projects.
(c)Category B1
(d)Proposal Number SIA/JK/MIS/55741/2019
(e)Master Proposal Number(Single Window) SW/168688/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village- Jagti, Tehsil- Nagrota, District- Jammu,
(b)Pincode 181221
(c)Bounded Latitudes (North)
From
Degree 324229.87
Minutes
Second
From
Degree 324813.90
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 745326.86
Minutes
Second
From
Degree 74536.99
Minutes
Second
(e)Survey of India Topo Sheet No. 1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 400
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirJammuJammuJagti
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SEAC/JK/20/164
(c)Date of Apply of TOR 20 Nov 2019
(d)Date of Issue of TOR / Standard ToR 25 Feb 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Building Construction Project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Landscape Area-1,00,050.25 sqmproposed tree 4400Green belt
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Water demand540Kilo Litre per DayPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 609
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.55
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.64
(e) Funds Allocated for Environment Management Capital(%) 0.42
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)..0Tons per Annum.Road1 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 01 Mar 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.030.043.160
(2.)SO2Micro Gram per Meter Cube14.98.714.180
(3.)NOxMicro Gram per Meter Cube24.313.224.280
(4.)PM10Micro Gram per Meter Cube84.36883.7100
(5.)OtherscoMili Gram per Meter Cube0.580.370.574
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.626.928.50
(2.)TDSmg/l2652285002000
(3.)Fluoridemg/l0.10.11.01.5
(4.)OthersCoppermg/l0.010.010.051.5
(5.)TSSmg/l76.57.530
(6.)Total Hardnessmg/l164136300600
(7.)Chloridesmg/l24192501000
(8.)Heavy MetalsIronNA0.050.050.30
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l22A
(2.)CODmg/l127A
(3.)DOmg/l7.87.2A
(4.)OthersZincmg/l0.280.23A
(5.)pHNA7.567.44A
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))675275
(2.)Leq(Night)A-weighted decibels(dB(A))623870
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.786.72
(2.)P(Phosphorus)Kilogram per hectare19.413.6
(3.)Electric ConductivityOthersdS/m0.580.32
(4.)K(Potassium)Kilogram per hectare382224
(5.)N(Nitrogen)Kilogram per hectare312198
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 8 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Authority5402Copy of Permission LetterPipelineOthersDiscretion of Municipal AuthorityCTP/JDA/BPC/41908 Jan 2020600
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water206250STPOthersto Nearby drain16541
16.1.
(a)Total Waste Water Generation 206
(b)Total Discharged Water 41
(c)Total Reused Water 165
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste4.247Kilolitre0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube44254960
(2.)PM10Microgram per Meter Cube84.32589.3100
(3.)SO2Microgram per Meter Cube14.92519.980
(4.)NOxMicrogram per Meter Cube24.32529.380
(5.)Others(Specify)COMicrogram per Meter Cube0.58255.584
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetsDiesel34.20.3PM101
(2.)DG SetsDiesel34.20.3PM101
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3400
(b)Source Jammu and Kashmir Power Development Corporation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) For Phase-1A-2*500 kVA, 415 v DG Set For Phase-1B-
(e)Stack Height (in m) 34.2
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 165.516
(d)Revenue Land 0
(e)Other Land 0
    Total Land 165.516
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4679.75
(b)Waste/Barren Land 3476.16
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 417.532
(e)Settlements 5568.93
(f)Industrial 0
(g)Forest 20466.5
(h)Mangroves 0
(i)Marine Area 0
(j)Others : River Bed-1321.24, Agriculture fallowland-1429.38 2750.62
    Total 37359.492000000006
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt10.005Landscape Area
Total 10.005
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsTawi River2.72*
(2.)ESAsChenab River15.61*
(3.)Critically Polluted AreaJagti2.58*
(4.)WLSJamboo Zoo1.25*
(5.)NPARamnagar Wild Life Sanctuary6.39*
(6.)Wildlife CorridorsManda Zoo Park6.45*
(7.)CorridorsNill0*
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestManda Zoo Park6.45*
(2.)Defence InstallationsDefense Estate Office13.47*
(3.)Archaeological SitesAmar Mahal Museum6.47*
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 350
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 165.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired No
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tawi River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2.72
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 150
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 400
(e)No. of working days 6
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 10.005
(b)Percentage of Total Project Area 6.04
(c)No. of Plants to be Planted 4400
(d)Funds Allocated for Plantation 5.5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt STP RWH Solar
(2.)SocialInstitutional Project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 28.2
(b)Total No. of Flats to be Build 682
(c)No. of Buildings 14
(d)Total plot area (sqm) 1655223
(e)Total built up area (sqm) 149855.98
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 5
    Capacity 7706.04
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1128
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 10
(c)Quantity 340
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/IA0017
(ii)Name of the EIA Consultant M/s Amaltas Enviro Industrial Consultants
(iii)Address B-1/1244,Vasant Kunj, New Delhi-110070
(iv)Mobile No. 9810085736
(v)Landline No. 0120435288
(vi)Email Id mervyn.atmos@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)03/09/2020pl upload all documents which you uploaded with your previous TOR Proposal No. 46755. EIA/EMP Report and NBC/prescribed norms in case the height of the building exceed permissible limits, clearance certificate form Airport Authority of India / or any other agencies may be obtained & furnished to this office.
(2.)25/09/2020The correction have been made as per the instruction received
(3.)29/09/2020pl upload all documents which you uploaded with your previous TOR Proposal No. 46755. EIA/EMP Report and NBC/prescribed norms in case the height of the building exceed permissible limits, clearance certificate form Airport Authority of India / or any other agencies may be obtained & furnished to this office. copy of additional file is not opening
(4.)29/09/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAC Patel
DesignationAW
Name of Company (Applicant Name should not be given here)INDIAN INSTITUTE OF TECHNOLOGY JAMMU, JAMMU & KASHMIR
AddressVillage- Jagti, Block- Dansal, District- Jammu, Jammu Kashmir