Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Dalpahar Iron and Manganese Ore Mine of Shri D.C. Jain
(b)Name of the Company / Organisation DALPAHAR IRON AND MANGANESE ORE MINES
(c)Registered Address
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Samarendra Mohanty
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Sri Avin Jain, Dharam Villa, 12-A, Mahatma Gandhi Marg (Ring Road),Kendujhar,Orissa-758035
(d)Pin code 758035
(e)E-mail samarendra257@gmail.com
(f)Telephone No. 674-2937494
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/OR/MIN/55644/2007
(e)Master Proposal Number(Single Window) SW/165473/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 75,19
(b)Pincode 758034
(c)Bounded Latitudes (North)
From
Degree 2430153.88
Minutes
Second
From
Degree 2431324.60
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 333843.80
Minutes
Second
From
Degree 334770.64
Minutes
Second
(e)Survey of India Topo Sheet No. 73G/5, 73F/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 723
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKendujharBarbilBaitarani R.F
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 20/SEIAA Odisha
(b)Date of Apply of EC 13 Sep 2020
(c)Date of Issue of EC 31 Dec 1899
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Jul 2011
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Aug 2011
Distance of Public Hearing Venue from the Proposed Project :0.2
Dalpahar Village
State :Orissa
District :Kendujhar
Tehsil :Barbil
Village :Dalpahar
200School development, plantation, employment to locals, medical facility, ambulance, formation of village committee, etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. Not Applicable (as it is first EC)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manganese09400094000Tons per Annum(TPA)Road,Rail
(2.)Iron708309292310000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Crushing unit0150150Mobile Crushing Unit
(2.)Screening Unit0200200Mobile Screening Unit
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 18 Aug 2020
(iv)Valid Upto 18 Aug 2020
(v)File No. Will be obtained
(vi)Application No. Will be obtained
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 49
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.34
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.70
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.553
(e) Funds Allocated for Environment Management Capital(%) 2.73
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD6Kilo Litre per DayProcured LocallyRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 29 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube938.380
(2.)NOxMicro Gram per Meter Cube17.15.616.480
(3.)PM10Micro Gram per Meter Cube85.942.580.1100
(4.)PM2.5Micro Gram per Meter Cube41.819.538.960
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA6.826.526.58.5
(2.)TDSmg/l16957.85002000
(3.)Chloridesmg/l41.511.52501000
(4.)Fluoridemg/l0.340.1111.5
(5.)Heavy MetalsIronmg/l0.180.070.30.3
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l91.229.8200600
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l6.40C
(2.)CODmg/l27.30C
(3.)pHNA7.476.87C
(4.)DOmg/l6.36.0C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.237.645
(2.)Leq(Day)A-weighted decibels(dB(A))49.142.555
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.545.96
(2.)P(Phosphorus)Milligram per Kilogram1.30
(3.)K(Potassium)Milligram per Kilogram932765
(4.)Electric ConductivityOthersµmhos/cm39.713.8
(5.)N(Nitrogen)Milligram per Kilogram412112
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.5 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater950Copy of Permission LettermodeOthersBorewellOthersBorewellCGWA/NOC/MIN/ORIG/2021/1064602 Feb 202195
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop Effluent26Effluent Treatment PlantReuse within the Plant & Recycling2
16.1.
(a)Total Waste Water Generation 2
(b)Total Discharged Water 0
(c)Total Reused Water 2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersOverburden409506Tons0RoadOthersPlan: Road maint,Dump.Concep: Backfill
(2.)Mineral RejectOthersMineral Reject56583Tons0RoadOthersSubgrade stack,Sold,blend with high grade ore
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube17.10017.180
(2.)PM2.5Microgram per Meter Cube24.501.025.560
(3.)PM10Microgram per Meter Cube52.304.656.9100
(4.)SO2Microgram per Meter Cube900980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD100.30PM10,SO2,NOx75mg/Nm3, 50mg/kg in fuel, 710ppmv
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Transformer and Emergency DG set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 89.961
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 89.961
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Nil 0
    Total 89.961
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.391Will be under plantation
(2.)Green belt3.082Greenbelt/Safety Zone
(3.)Quarry Area81.648Out of this 4.79Ha backfilling & plantation
(4.)Area for Solid Waste Management0.975Mineral Reject Storage
(5.)OthersRoad0.865Road
Total 89.961
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10km radius
(2.)WLSNil0Nil within 10km radius
(3.)NPANil0Nil within 10km radius
(4.)ESAsNil0Nil within 10km radius
(5.)ESZsNil0Nil within 10km radius
(6.)Wildlife CorridorsKaro Karampada Elephant Corridor16Nil within 10km radius
(7.)CorridorsNil0Nil within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Nil within 10km radius
(2.)Defence InstallationsNil0Nil within 10km radius
(3.)ForestSidhamath R.F2.1Lease area lies in Baitarani R.F, Chamakpur R.F (5.1Km)
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Entire area is forest land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant, Sloth bear and Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs.25025400
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 9070/1WL(C)SSP-442/2014
(iii)Date of issue 27 Nov 2014
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Baitarani River. Besides, Kunduru Nala(2.5), Kakarpani Nala(5.3), Kundra or Suna Nadi (0.8), Topadihi Nala(9.2) and Dalka Nala (3.0) also lie in buffer zone
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 4.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 82
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 182
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.08203
(2.)Percentage of Total Project Area3.4203
(3.)No. of Plants012001200
(4.)Funds Allocated0816000816000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalmgcmgmhvmh
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ManganeseMajor
(2.)IronMajor
2.
Mine Capacity in ROM (Run of Mine) 404000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. RMP/A/53-ORI/BHU/2019-20
(b)Date of Approval 01 Apr 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 89.961
(f)Approved Capacity 404000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 4.224
(b)Mineable Reserves (Million Ton) 1.889
(c)Extractable Reserves(Million Ton) 1.889
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 45
(f)Stripping Ratio 1 : 0.21
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 37.5
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 2
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1150 Proposed: 150TPHx1 Crushing unit
(2.)1200 Proposed: 200TPHx1 screening plant
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 89.961
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 09 Jun 1986
(iii)Validity of LOI 08.06.2036
(iv)Reference No. of LOI
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 89.961
(iii)Validity of the lease deed From : 09 Jun 1986 To : 08 Jun 2036
(iv)Date of Execution of Mining Lese 09 Jun 1986
(v)Reference Number
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Deemed to be extended
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 4.418
(iii)Height (in meter) 15
(iv)Quantity (in Million Cubic meter) 0.062
(v)No. of year back fill up 4
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 4.79
(iii)Height (in meter) 12
(iv)Quantity (in Million Cubic meter) 0.511
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 81.648
(b)Depth (in meter) 70
(c)Volume (in Million Cubic meter) 1.318
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 81.648
13.
Details of Transportation:
(a)In Pit/Underground to Surface By road
(b)Surface to Siding/Loading By road
(c)Transportation / Conveyor Details Tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)FOREST LAND89.961089.961
(5.)SETTLEMENTS000
(6.)WASTE LAND000
TOTAL89.961089.961
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS000.8650.865
(2.)OtherMineral storage+Crushing & Screening unit4.366004.366
(3.)TOP SOIL STORAGE0000
(4.)EXTERNAL OB DUMPS0000
(5.)INTERNAL OB DUMPS4.79004.79
(6.)EXCAVATION/QUARRY76.8580076.858
(7.)VIRGIN AREA0000
(8.)GREEN BELT3.082003.082
(9.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL89.09600.865089.961
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 4.79
(c)Quarry(in hectare) 76.858
(d)Safety Zone(in hectare) 3.082
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 4.366
(h)Total afforestation plant (in hectare) 89.096
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan Not envisaged
Total Area Excavated (in hectare) 81.648
Total Area Backfilled after Excavation (in hectare) 4.79
Total Area Reclaimed (in hectare) 81.648
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)1993000708.5000
(2.)1995000512.7500
(3.)1994000268.0000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/0423
(ii)Name of the EIA Consultant Creative Engineers & Consultants
(iii)Address 9B/4, Bharathwajar Street, East Tambaram, Chennai-600059.
(iv)Mobile No. 9444133619
(v)Landline No. 22395170
(vi)Email Id cecgiri@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 23 Mar 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)08/06/2021please complyADS Letter
(2.)10/06/2021Dalpahar Final ADS Compliance submittedADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSamarendra Mohanty
DesignationGM
Name of Company (Applicant Name should not be given here)DALPAHAR IRON AND MANGANESE ORE MINES
AddressSri Avin Jain, Dharam Villa, 12-A, Mahatma Gandhi Marg (Ring Road)