Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Phoenix IT City Pvt Ltd
(b)Name of the Company / Organisation PHOENIX GROUP
(c)Registered Address PLOT NO. # 1335, ROAD NO. # 45, JUBILEE HILLS, HYDERABAD,,Hyderabad,Telangana-500003
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant SRIKANTH BADIGA
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address PLOT NO. # 1335, ROAD NO. # 45, JUBILEE HILLS, HYDERABAD,,Shaikpet,Hyderabad,Telangana-500003
(d)Pin code 500003
(e)E-mail phoenixindianet@gmail.com
(f)Telephone No. 40-23553351
(g)Fax No. 23553351
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/TG/MIS/50331/2018
(e)Master Proposal Number(Single Window) SW/139438/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 53 paiki
(b)Pincode 500082
(c)Bounded Latitudes (North)
From
Degree 17.4352
Minutes
Second
From
Degree 17.438
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.37209
Minutes
Second
From
Degree 78.37387
Minutes
Second
(e)Survey of India Topo Sheet No. 56k/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 580
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaRangareddiSerilingampallegachibowli
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/TS/OL/RRD-276/2018
(b)Date of Apply of EC 02 Feb 2018
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason NOT APPLICABLE AS IT IS A CONSTRUCTION
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. 000
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)BUILT-UP AREA318612.814053.6322666.41OthersSQ.MOthersNONE
(2.)CAPTIVE BATCHING PLANT06060OthersCUM/HOUROthersNONE
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)CAPTIVE BATCHING PLANT06060NIL
(2.)BUILT-UP AREA318612.814053.6322666.41NONE
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2020
(iv)Valid Upto 31 Jan 2020
(v)File No. 000
(vi)Application No. 000
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 8.75
(b) Funds Allocated for Environment Management (Capital) (in crores) 0
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0875
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)00OthersnoneLOCALOthersnone0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.413.918.480
(2.)NOxMicro Gram per Meter Cube39.224.839.280
(3.)OthersCOMicro Gram per Meter Cube5904105902000
(4.)PM2.5Micro Gram per Meter Cube35.325.635.360
(5.)PM10Micro Gram per Meter Cube58.542.258.5100
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.46.58.5
(2.)TDSmg/l8747405002000
(3.)Total Hardnessmg/l525443300600
(4.)Chloridesmg/l1851582501000
(5.)Fluoridemg/l0.450.41.01.5
(6.)Heavy Metalsironmg/l0.20.10.31.0
(7.)TSSNA0000
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00B
(2.)BODNA00B
(3.)CODNA00B
(4.)DONA00B
    14.4.     No. of Ambient Noise Monitoring Locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))585265
(2.)Leq(Day)A-weighted decibels(dB(A))747075
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.07.4
(2.)N(Nitrogen)Kilogram per hectare243189
(3.)P(Phosphorus)Kilogram per hectare2419
(4.)K(Potassium)Kilogram per hectare148106
(5.)Electric ConductivityOthersmicro siemens/sec160125
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 42 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 39 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWS&SB9891Copy of Permission LetterPipelineOthersPIPELINE00002 Jan 2020989
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC8821000STPReuse within the Plant & Recycling,Green Belt Renewal Plant882
16.1.
(a)Total Waste Water Generation 882
(b)Total Discharged Water 0
(c)Total Reused Water 882
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MUNICIPAL SOLID WASTEMunicipal Solid Waste2263Tons1RoadOthersSEGREGRATION, BIOCOMPOSTING & DISPOSAL
(2.)WASTE OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1700Tons50RoadAuthorized Recyclers
(3.)WASTE OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1700Tons50RoadAuthorized Recyclers
(4.)STP SLUDGEOthersSTP SLUDGE32.2Tons0OthersNONEOthersUSED AS MANURE
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube35.31.635.960
(2.)NOxMicrogram per Meter Cube39.213.642.880
(3.)PM10Microgram per Meter Cube58.511.159.6100
(4.)SO2Microgram per Meter Cube18.40018.480
(5.)Others(Specify)coMicrogram per Meter Cube59012.8592.82000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SET 2000 KVADIESEL30.6PM100.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20000
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 12 X 2000
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 2.52
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 2.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 2.52
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NONE 0
    Total 2.52
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.262
(2.)OthersGROUND COVERAGE & OTHERS2.258
Total 2.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0NIL
(2.)ESZsNIL0NIL
(3.)ESAsNIL0NIL
(4.)WLSNIL0NIL
(5.)NPAKBR NATIONAL PARK4.3NIL
(6.)CorridorsNIL0NIL
(7.)Wildlife CorridorsNIL0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesQUTUB SHAH TOMBS4.9NIL
(2.)ForestNIL0NIL
(3.)Defence InstallationsLANGER HOUSE7NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area DURGAM CHERUVU
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.45
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 200
(e)No. of working days 330
(f)Total Manpower 1100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt02617.42617
(2.)Percentage of Total Project Area010.410
(3.)No. of Plants0315315
(4.)Funds Allocated0200000200000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialemplyment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 70
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 25173.88
(e)Total built up area (sqm) 322666.41
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 20
    Capacity 8
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2800/2800
5.
Energy Saving Measures:
(a)Source/Mode SOLAR
(b)Percentage 2
(c)Quantity 400
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NIL
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA / 1922 / RA0149
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT LTD
(iii)Address HYDERABAD
(iv)Mobile No. 9000380040
(v)Landline No. 0402311427
(vi)Email Id INFO@PIONEERENVIROLABS.COM
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSRIKANTH BADIGA
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)PHOENIX GROUP
AddressPLOT NO. # 1335, ROAD NO. # 45, JUBILEE HILLS, HYDERABAD
Print