Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amendment in Existing Environment Clearance conditions for existing Polyester chips manufacturing plant for change in fuel for 9.9 MW captive power generation by JBF Industries Ltd.
(b)Name of the Company / Organisation JBF INDUSTRIES LIMITED
(c)Registered Address Plot No. 11, 12 & 215 to 231, GIDC, Sarigam, Dist.: Valsad,,Valsad,Gujarat-396155
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Yash Saran Gupta
(b)Designation (Owner/ Partner/ CEO) Joint President
(c)Address Plot No. 11, 12 & 215 to 231, GIDC, Sarigam, Dist.: Valsad,Valsad,Gujarat-396155
(d)Pin code 396155
(e)E-mail yash_gupta@jbfmail.com
(f)Telephone No. 260-2781200
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(d) Thermal Power Plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/THE/23979/2018
(e)Master Proposal Number(Single Window) SW/134003/2019
(f)EAC concerned (for category A Projects only) Thermal Projects
(g)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 11, 12, 215 to 231, Sarigam GIDC Estate
(b)Pincode 396155
(c)Bounded Latitudes (North)
From
Degree 20.290735
Minutes
Second
From
Degree 20.293799
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.852957
Minutes
Second
From
Degree 72.854265
Minutes
Second
(e)Survey of India Topo Sheet No. F43S11, F43S15, F43S16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 30
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratValsadUmbergaonSarigam
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SIA/GJ/Violation/33504/2018
(b)Date of Apply of EC 10 Apr 2018
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :1
Sarigam Industries Association (SIA) Hall, Shed No. C1-614, road no. 6, GIDC Sarigam-396155, Ta.: Umbergaon, Dist.: Valsad
State :Gujarat
District :Valsad
Tehsil :Umbergaon
Village :Sarigam
87A summarized table showing salient points highlighting issues raised by the participants & issues raised by the concerned persons having plausible stake in Environment and responded by the representatDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-54/2012(ENV)/352
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power Generation through coal fired CPP09.99.9Mega Watt(MW)OthersCaptive power for in-house use
(2.)Polyester Chips of Various Types & Grdaes49500049500OthersTonnes per Month (TPM)Road
(3.)Power Generation through captive power plants9.9-9.90Mega Watt(MW)OthersCaptive power for in-house use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Steam turbine - 9.9 MW with 11 kV Alternator011
(2.)Coal conveying system101
(3.)Ash Conveying system101
(4.)Air cooled condenser01 set1 set
(5.)ESP for AFBC-45 TPH Boiler011
(6.)Chimney - 63 meter for coal fired power plant011
(7.)AFBC Boiler - 45 TPH with auxiliaries011
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Jun 2016
(iv)Valid Upto 28 Mar 2021
(v)File No. AWH-78042
(vi)Application No. Application Inward No.-104021
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 42
(b) Funds Allocated for Environment Management (Capital) (in crores) 4.8
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.84
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 3.3
(e) Funds Allocated for Environment Management Capital(%) 11.43
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 132000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 132000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Imported/Indigenous106590Tons per AnnumAdani Enterprise Ltd.Road300 MoUCopy of Linkage
(2.)Indian Coal25410Tons per AnnumShri Hari Coal CorporationRoad100 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2018 To 28 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube25102580
(2.)PM2.5Micro Gram per Meter Cube43164360
(3.)OthersCOMili Gram per Meter Cube1.030.111.034
(4.)SO2Micro Gram per Meter Cube2192180
(5.)PM10Micro Gram per Meter Cube896189100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.827.516.58.50
(2.)TDSmg/l6174845002000
(3.)Total Hardnessmg/l296218200600
(4.)Fluoridemg/l0.60.111.5
(5.)Heavy MetalsIron (Fe)mg/l0.30.10.30
(6.)Chloridesmg/l95632501000
(7.)TSSNA0000
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.167.6E
(2.)DOmg/l6.31.3E
(3.)BODmg/l325E
(4.)CODmg/l11214E
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.142.875-50
(2.)Leq(Night)A-weighted decibels(dB(A))63.237.470-40
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram130127
(2.)P(Phosphorus)Milligram per Kilogram2822
(3.)K(Potassium)Milligram per Kilogram10390
(4.)pH7.887.25
(5.)Electric ConductivityMillisiemens per Centimetre1.321.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply Department10410Copy of Permission LetterPipelineOthersPipe Water SupplyGIDC/DEE/SRG/39018 Aug 20101215
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic50757ETPReuse within the Plant & Recycling50
(2.)Industrial707757ETPReuse within the Plant & Recycling,OthersDischarge in CETP drainage163544
16.1.
(a)Total Waste Water Generation 757
(b)Total Discharged Water 544
(c)Total Reused Water 213
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process Waste (Lump Waste)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)990Tons100RoadOtherssale to actual users/ recyclers having valid CC&A
(2.)Discarded Bags/ LinersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)475Tons100RoadOtherssale to authorized decontamination facility
(3.)Ion Exchange ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded Containers (in number per Annum)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)abc13800Tons100RoadOtherssale to authorized decontamination facility
(5.)ETP WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)310Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Kilolitre100RoadAuthorized Recyclers
(7.)Fly AshFly Ash15100Tons300RoadOthersSent to the brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube430.10.0843.0880
(2.)Others(Specify)COMicrogram per Meter Cube10300.111.61041.64000
(3.)PM10Microgram per Meter Cube890.10.0889.08100
(4.)SO2Microgram per Meter Cube210.102180
(5.)NOxMicrogram per Meter Cube250.102580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TFH-10Lakh.kCal/hrCoal632.2PM10,SO2,NOx ,OthersCOPM-0.425,SO2-0.916,NOx-1.763,CO-0.227
(2.)Boiler-45TPHCoal632.2PM10,SO2,NOx ,OthersCOPM-0.3,SO2-2.138,NOx-3.474,CO-0.45
(3.)TFH-14 Lakh.kCal/hr - 2 Nos.coal632.2PM10,SO2,NOx ,OthersCOPM-1.189,SO2-2.566,NOx-1.97,CO-0.635
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10400
(b)Source DGVCL & CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) None
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 6.1257
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.1257
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 14686
(b)Waste/Barren Land 5750
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 873
(e)Settlements 1453
(f)Industrial 997
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 863
(j)Others : Tree clad, Mining, Mudflats, Open Land, Salt works 8063
    Total 32685
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.865889
(2.)Green belt0.656274
(3.)Othersother ground coverage area4.603537
Total 6.1257
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0none
(2.)CorridorsNone0none
(3.)Wildlife CorridorsNone0none
(4.)ESAsNone0none
(5.)WLSNone0none
(6.)NPANone0none
(7.)Critically Polluted AreaGIDC Vapi7.9none
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0No within study area
(2.)Defence InstallationsNone0No within study area
(3.)ForestPatches of reserved forest2None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.1257
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired none
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Panthera paradus, Pavo cristatus, Varnus bengalensis, Indirana leithii
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 0
(iii)Period of Implementation As per conservation plan
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Darotha
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3.74
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 70
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6562.7406562
(2.)Percentage of Total Project Area10010
(3.)Funds Allocated5000000500000
(4.)No. of Plants400004000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialGeneration of direct employment opportunities. Additionally 20 people will be employed from the proposed amendment project which will result growth in the economic conditions.
(2.)SocialDevelopment of the social structure & improvement of the quality of life in the surrounding area due to growth in the economic conditions and Rs. 84 Lakhs will be allocated for next 5 years for CER ac
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed AFBC
(b) Plant Load Factor(%) 89
(c) Station Heat Rate (Kcal/Kwh) 3220
(d) Steam Rate/Flow Rate 41.8
(e) Boiler Temperature 515
(f) Boiler Pressure 87
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)1632.212.5110
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)Imported/IndigenousMoU
Source of Linkage :Adani Enterprise Ltd.
Quantity of Linkage Granted :106590
Date of Linkage :06 Oct 2014
Duration of Linkage :0
Gross Calorific Value (Kcal/Kg) :5400
Ash Content (%) :5
Sulphur Content (%) :0.5
Moisture (%) :12.5
Mercury (mg/kg) :0
Fixed Carbon (%) :73.71
Volatile Matter (%) :40
(2.)Indian CoalMoU
Source of Linkage :Shri Hari Coal Corporation
Quantity of Linkage Granted :25410
Date of Linkage :13 Dec 2013
Duration of Linkage :0
Gross Calorific Value (Kcal/Kg) :4616
Ash Content (%) :34.18
Sulphur Content (%) :0.26
Moisture (%) :9.06
Mercury (mg/kg) :0
Fixed Carbon (%) :48.49
Volatile Matter (%) :40
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Imported/Indigenous
Distance :
Quantity :
Distance :300
Quantity :106590
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :
Quantity :
300106590
(2.)Indian Coal
Distance :
Quantity :
Distance :100
Quantity :25410
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :
Quantity :
10025410
TOTAL Distance : 0
Quantity : 0
Distance : 400
Quantity : 132000
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Natural Draft
(c) Type of Air Circulation Parallel Flow
(d) Cycle of Cooling (COC) 6
(e) Water Req. For Cooling (m3/day) 769
(f) Boiler Blow Down Temperature 5
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act show cause notice & reply
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/RA012
(ii)Name of the EIA Consultant M/s. Precitech Laboratories Pvt. Ltd.
(iii)Address C5/27, 1st floor, Bhanujyot complex,GIDC char rasta, Vapi, Gujarat.
(iv)Mobile No. 9925008673
(v)Landline No. 0260242554
(vi)Email Id rhb@precitechlab.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 05 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)21/01/2020Kindly upload standard format of project details & Checklist for industrial projects.
(2.)15/02/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantYash Saran Gupta
DesignationJoint President
Name of Company (Applicant Name should not be given here)JBF INDUSTRIES LIMITED
AddressPlot No. 11, 12 & 215 to 231, GIDC, Sarigam, Dist.: Valsad