Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Establishment of Pilot Plant for Synthetic Organic Chemicals (Specialty chemicals, API & its formulation) by Aarti Industries Limited at Plot No. A-94/1 & A-94/1/1, Khairane MIDC, TTC Industr
(b)Name of the Company / Organisation AARTI INDUSTRIES LIMITED
(c)Registered Address Plot No. 801, 801/23, G.I.D.C. Estate,Phase - III, Vapi, District Valsad Gujarat,,Bharuch,Gujarat-396195
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Premnath PremnathR
(b)Designation (Owner/ Partner/ CEO) SeniorManager
(c)Address Plot No 94/1 & 94/1/1, Khairane MIDC, TTC Industrial area, Navi Mumbai,,Thane,Thane,Maharashtra-400709
(d)Pin code 400709
(e)E-mail nitul.kabrawala@aarti-industries.com
(f)Telephone No. 22-67976666
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(c)Category B1
(d)Proposal Number SIA/MH/IND2/45329/2019
(e)Master Proposal Number(Single Window) SW/122819/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. A-94/1 & A-94/1/1, Khairane MIDC
(b)Pincode 400705
(c)Bounded Latitudes (North)
From
Degree 19.5
Minutes
Second
From
Degree 19.5
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.1
Minutes
Second
From
Degree 73.1
Minutes
Second
(e)Survey of India Topo Sheet No. E43A16 E43B4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 11
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraThaneThaneKhairane
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEAC-MINUTES-0000004337
(b)Date of Apply of TOR 05 Feb 2019
(c)Date of Issue of TOR / Standard ToR 15 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is in notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor, Scrubber, Columns, Condensersrefer EIA reportrefer EIA report
(2.)Pumps, Filter Press, Vacuum Systemsrefer EIA reportrefer EIA report
(3.)Cooling Towers, Chilling Unitsrefer EIA reportrefer EIA report
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pilot Plant for synthetic organic chemicals5OthersTon per monthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 27.8
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.27
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.556
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.62
(e) Funds Allocated for Environment Management Capital(%) 7.41
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Refer EIA report0Tons per Annumnearby sourceRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Mar 2019 To 28 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube46.722.546.480
(2.)OthersCOMili Gram per Meter Cube0.510.270.5104
(3.)PM2.5Micro Gram per Meter Cube40.624.438.160
(4.)SO2Micro Gram per Meter Cube36.214.535.780
(5.)PM10Micro Gram per Meter Cube79.260.878.7100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l80805002000
(2.)Heavy MetalsCadmiummg/l000.0030.003
(3.)Otherscoppermg/l000.051.5
(4.)Total Hardnessmg/l4646200600
(5.)Chloridesmg/l4242250250
(6.)pHNA7.627.628.58.5
(7.)TSSmg/l0000
(8.)Fluoridemg/l0011.5
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA6.856.85E
(2.)DOmg/l6.26.2E
(3.)CODmg/l00E
(4.)OthersCadmiummg/l00E
(5.)BODmg/l22E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))66.266.270
(2.)Leq(Day)A-weighted decibels(dB(A))68.568.575
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare56.3056.30
(2.)K(Potassium)Kilogram per hectare9090
(3.)Electric ConductivityMillisiemens per Centimetre300.2300.2
(4.)N(Nitrogen)Kilogram per hectare890890
(5.)pH6.986.98
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 14.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 6.9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Othersfrom MIDC980 Not Appliacble PipelineOthersfrom MIDC pipelineEE/PA-I/IFMS-C29522/201919 Aug 201998
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Process, Cooling tower & Boiler blowdown3535ETP for trade effluent & STP for sewageOthersPartly recycle and balance discharge1520
16.1.
(a)Total Waste Water Generation 35
(b)Total Discharged Water 20
(c)Total Reused Water 15
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Paper wasteMunicipal Solid Waste0.6Tons0RoadOthersLandfill/ recycler
(2.)Process residue & wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadAuthorized Recyclers
(4.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons0RoadAuthorized Recyclers
(5.)Off specification productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)E wasteE Waste2Tons0RoadOthersAuthorized E waste handler
(7.)Spent Carbon and filter mediumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Spent AcidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons0RoadAuthorized Recyclers
(9.)Inorganic SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(10.)Cotton wasteMunicipal Solid Waste0.5Tons0RoadOthersLandfill
(11.)CaCl2 SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadAuthorized Recyclers
(12.)Glass wasteMunicipal Solid Waste6Tons0RoadOthersLandfill/ recycler
(13.)ETP WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(14.)ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)30% HClHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons0RoadAuthorized Recyclers
(16.)Empty barrels, Carboys, containers, liners etcHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1000Tons0RoadAuthorized Recyclers
(17.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons0RoadOthersTSDF/ recycler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.80.80.0470.85100
(2.)PM2.5Microgram per Meter Cube29.50.8029.660
(3.)Others(Specify)COMicrogram per Meter Cube0.380.800.394
(4.)NOxMicrogram per Meter Cube36.70.80.0336.7480
(5.)SO2Microgram per Meter Cube24.90.81.5326.4480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1 TPH BOilerFO 1600 kg per Day or NG 1700 nm3 per day300.25PM10150
(2.)750 KVA DG setHSD 225 Lit per Hr5.50.2PM10150
(3.)Alkaline gas scrubber vent-110.2Othersalkaline gas-
(4.)750 KVA DG setHSD 225 Lit per Hr5.50.2PM10150
(5.)Acidic gas scrubber vent-110.2Othersacidic gas-
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source from MIDC
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 nos of 750 KVA
(e)Stack Height (in m) 5.5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.61106
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.61106
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 3926
(b)Waste/Barren Land 872
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 5003
(e)Settlements 4532
(f)Industrial 6368
(g)Forest 4148
(h)Mangroves 6619
(i)Marine Area 0
(j)Others : NA 0
    Total 31468
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.611066total plot area
(2.)Green belt0.21998
(3.)OthersParking area0.062971
Total 0.894017
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)Critically Polluted AreaNA0NA
(3.)WLSNA0NA
(4.)ESAsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNANA0NA
(2.)ForestReserve forest1.5NA
(3.)Archaeological SitesNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Thane creek
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.21998
(b)Percentage of Total Project Area 36.00
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 10
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSocial upliftment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1720/ RA 0117 rev 01
(ii)Name of the EIA Consultant Aditya Environmental Services Pvt. Ltd.
(iii)Address 107, Hiren Light Industrial estate, Mogul Lane, Mahim- west, Mumbai
(iv)Mobile No. 9821513367
(v)Landline No. 0224212750
(vi)Email Id rajiv@aespl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPremnath PremnathR
DesignationSeniorManager
Name of Company (Applicant Name should not be given here)AARTI INDUSTRIES LIMITED
AddressPlot No. 801, 801/23, G.I.D.C. Estate,Phase - III, Vapi, District Valsad Gujarat
Print