Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Building Stone Mine ( Quarry, Minor Mineral Mining ) project of M/s Mattathil Mines and Developers (P) Ltd. at Re-Survey Nos. 898, 899/1, 899/2, 896/1, 896/2, 897/1 at Kodassery Village, Chalakudy T
(b)Name of the Company / Organisation M/S MATTATHIL MINES & DEVELOPERS PVT. LTD.
(c)Registered Address Chettikulam, Thrissur, Kerala,,Thrissur,Kerala-680721
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Arun Baby
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Chettikulam, Thrissur, Kerala,,Thrissur,Thrissur,Kerala-680721
(d)Pin code 680721
(e)E-mail mattathilminesanddevelopers@yahoo.com
(f)Telephone No. 480-2740519
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/KL/MIN/41465/2019
(e)Master Proposal Number(Single Window) SW/115107/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Re-Survey Nos. 898, 899/1, 899/2, 896/1, 896/2, 89
(b)Pincode 680721
(c)Bounded Latitudes (North)
From
Degree 102056.63
Minutes
Second
From
Degree 10211.93
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 762321.20
Minutes
Second
From
Degree 762328.45
Minutes
Second
(e)Survey of India Topo Sheet No. 58B/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 125
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 3.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaThrissurMukundapuramKodassery
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number NOT APPLICABLE
(b)Date of Apply of TOR 15 Jul 2019
(c)Date of Issue of TOR / Standard ToR 15 Aug 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason The proposed mine lease area is 3.9149 ha and there is no working quarry located within 500m radius from the mine lease boundary and hence the total mine lease area is 3.9149 ha which is less than 5 ha. Therefore as per the Office Memorandum vide No. L-11011/175/2018-IA-II(M) dt. 12/12/2018 by Ministry of Environment Forests & Climate Change (MoEF&CC) for mine lease area of less than 5 hectares no EIA / EMP is required. Therefore no Terms of Reference is proposed.
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Building stone Minor Mineral Quarry ProjectMine Lease for an area of 3.9149 HaProposed Area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Building Stone Minor Mineral135000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 4.3
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.9
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.1045
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.5
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel0.002Kilo Litre per DayOpen MartketRoad8 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 14 Jun 2019 To 21 Jun 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube42.239.640.9100
(2.)PM2.5Micro Gram per Meter Cube19.317.518.460
(3.)SO2Micro Gram per Meter Cube22280
(4.)NOxMicro Gram per Meter Cube22280
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l22.222.2200200
(2.)Heavy MetalsIronmg/l0.100.101.01.0
(3.)pHNA5.175.176.58.5
(4.)TSSmg/l4400
(5.)TDSmg/l57.057.0500500
(6.)Chloridesmg/l14.714.775.075.0
(7.)Fluoridemg/l0.100.1011
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l300B
(2.)CODmg/l2500B
(3.)pHNA11B
(4.)DOmg/l85B
    14.4.     No. of Ambient Noise Monitoring Locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))34.233.345
(2.)Leq(Day)A-weighted decibels(dB(A))46.245.355
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH5.185.18
(2.)N(Nitrogen)Percent0.250.25
(3.)P(Phosphorus)Percent0.120.12
(4.)Electric ConductivityMillisiemens per Centimetre47.047.0
(5.)K(Potassium)Percent0.210.21
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13 To 5.20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.10 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater40.050Copy of Permission LetterPipelineOpen WellN/A20 Aug 20194
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste from office and mine workers33soak pitOthersSoak Pit30
16.1.
(a)Total Waste Water Generation 3
(b)Total Discharged Water 0
(c)Total Reused Water 3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic Waste from office and mine workersMunicipal Solid Waste3Kilolitre0.5Otherssoak pitSanitary LandfillsUsed for Eco Restoration / Green belt
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube14.78.30.0114.7960
(2.)NOxMicrogram per Meter Cube2.30.012.0180
(3.)PM10Microgram per Meter Cube32.7.30.232.9100
(4.)SO2Microgram per Meter Cube2.30.012.0180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set of 300 kVAHSD80.15SO2,NOx0.01
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 75
(b)Source Diesel Engine and KSEB Supply
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG set of 300 kVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.9149
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.9149
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 3.9149
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : None 0
    Total 3.9149
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt.5946Buffer area along the lease area
Total 0.5946
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 Km radius10None
(2.)ESZsNone within 10 Km radius10None
(3.)CorridorsNone within 10 Km radius10None
(4.)NPANone within 10 Km radius10None
(5.)WLSNone within 10 Km radius10None
(6.)ESAsNone within 10 Km radius10None
(7.)Wildlife CorridorsNone within 10 Km radius10None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone within 10 Km radius10None
(2.)ForestAanapantham Forest4.3towards NE
(3.)Defence InstallationsNone within 10 Km radius10None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 139
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 3.9149
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chalakkudy River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 3.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 16
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 12
(e)No. of working days 300
(f)Total Manpower 28
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.5946
(b)Percentage of Total Project Area 15.19
(c)No. of Plants to be Planted 1700
(d)Funds Allocated for Plantation 1.0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental- Due to eco-restoration large numbers of native species would be planted
(2.)FinancialRevenue to the State Increase and increase the living index of the people.
(3.)Social1. Employment opportunities will be increase. 2. The quarry project would provide raw meaterial to construction and infrastructure projects and employment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Minor Mineral (Building Stone)Minor
2.
Mine Capacity in ROM (Run of Mine) 1179890
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 1758/C2/TDO/2019
(b)Date of Approval 15 Jul 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 3.9149
(f)Approved Capacity 1179890
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1848209
(b)Mineable Reserves (Million Ton) 1179890
(c)Extractable Reserves(Million Ton) 1179890
(d)Percent(%) of Extraction 64
(e)Grade of Coal /Ore /Mineral 4
(f)Stripping Ratio 1 : 0.0132
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 3.9149
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 22 May 2019
(iii)Validity of LOI 1
(iv)Reference No. of LOI 4491/M3/2019
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Lease deed will be executed after obtaining EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease deed will be executed after obtaining EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.0471
(iii)Height (in meter) 5
(iv)Quantity (in Million Cubic meter) 15660
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 25055
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 25055
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 3.3133
(b)Depth (in meter) 5
(c)Volume (in Million Cubic meter) 0.471956
12.
Details of Quarry:
(a)Final Void of 2.1850 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 3.3133
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumber/Tipper
(b)Surface to Siding/Loading Excavators/Tipper
(c)Transportation / Conveyor Details Truck/Tipper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)GRAZING LAND000
(3.)SETTLEMENTS000
(4.)WASTE LAND3.914903.9149
(5.)AGRICULTURE LAND000
(6.)SURFACE WATER BODIES000
TOTAL3.914903.9149
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY1.12832.185003.3133
(2.)INTERNAL OB DUMPS0000
(3.)BUILT UP AREA (COLONY/OFFICE)0000
(4.)VIRGIN AREA0000
(5.)ROADS0000
(6.)GREEN BELT0.59460.00700.6016
(7.)TOP SOIL STORAGE0000
(8.)EXTERNAL OB DUMPS0000
TOTAL1.72292.192003.9149
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0.0471
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 3.9149
(d)Safety Zone(in hectare) 0.5946
(e)Final Void of 2.1850 (hectare) at a Depth of 5 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 1.1283
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 92
(ii)Name of the EIA Consultant M/S Environmental Engineers and Consultants Pvt. l
(iii)Address A1/198, Janakpuri, New Delhi
(iv)Mobile No. 9350873385
(v)Landline No. 0112550719
(vi)Email Id eecnewdelhi@yahoo.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)29/10/2019The Processing Fee should be remitted to treasury directly in the Head of Account ‘1425-00-501-99-Processing Charge on Environment Clearance by the State Environment Impact Assessment Authority’ and upload the Chelan via PARIVESH.
(2.)29/10/2019The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)03/02/2020The Committee directed the proponent to submit the following documents/details: l.Garland canal through green belt. Needs to be revised 2.0B site not marked 3.Distance to nearest house not marked in survey map, survey map not legible 4.CER- Smart class room. treatment support, solar light, well recharge- Specific details with contact information and GP letter needed. Avoid treatment support component as it is difficult to monitor.ADS Letter
(2.)17/02/2020The Committee directed the proponent to submit the following documents/details: 1. Garland canal through green belt. Needs to be revised 2. OB site not marked 3. Distance to nearest house not marked in survey map, survey map not legible 4. CER- Smart class room, treatment support, solar light, well recharge- Specific details with contact information and GP letter needed. Avoid treatment support component as it is difficult to monitor.
(3.)21/02/2020This has reference to the clarifications sought by SEAC in its 108th meeting. The details are attached for your reference.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantArun Baby
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)M/S MATTATHIL MINES & DEVELOPERS PVT. LTD.
AddressChettikulam, Thrissur, Kerala
Print