Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. CS Specialty Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation M/S. CS PERFORMANCE CHEMICALS PVT. LTD.
(c)Registered Address plot no-Z-33,Dahej SEZ Ltd., Dahej,,Bharuch,Gujarat-392130
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Parimal Desai
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address plot no-Z-33, Dahej Sez lTD.,Dahej,,Vagra,Bharuch,Gujarat-392130
(d)Pin code 392130
(e)E-mail parimal.desai@chemiesynth.com
(f)Telephone No. 0-00000000
(g)Fax No. 00000000
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/30713/2019
(e)Master Proposal Number(Single Window) SW/111598/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. Z-81, Z- 82, Dahej SEZ 1, Dahej, Bharuch
(b)Pincode 392130
(c)Bounded Latitudes (North)
From
Degree 2401746.03
Minutes
Second
From
Degree 2401831.24
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 255299.06
Minutes
Second
From
Degree 255396.90
Minutes
Second
(e)Survey of India Topo Sheet No. F43M10,F43M9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.33
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagraDahej
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/10301/2019
(b)Date of Apply of TOR 11 Jan 2019
(c)Date of Issue of TOR / Standard ToR 10 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site within notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Agitated Reactor1 KL x3 Nos
(2.)Agitated Reactor3 KL x2 Nos
(3.)Agitated Reactor4 KL x3 Nos
(4.)Hydrogenator5KL x1 No
(5.)Agitated Nutche Filter Dryer3 KL x1 Nos
(6.)Distillation Columns4
(7.)Filter Press2
(8.)Thermopack1
(9.)Hydrogenator3 KL x1 Nos
(10.)Agitated Nutche Filter Dryer5KL x1 Nos
(11.)Agitated Reactor2 KL x3 Nos
(12.)Intermediate Storage Tanks0.1 KLto 5 KL
(13.)D.G Set1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Catalyst Support (Magnesium ethoxide)300Tons per AnnumRoad
(2.)U - Donor (Diethyl Amino-TriethoxySilane)100Tons per AnnumRoad
(3.)Donor B (IPIA) (3,3-BIS(methoxymethyl)-2,6-DMH)100Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 15
(b) Funds Allocated for Environment Management (Capital) (in crores) 1
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.95
(e) Funds Allocated for Environment Management Capital(%) 6.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5951.64
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5951.64
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)isovaleradehyde192.72Tons per AnnumManufacturerRoad375 Open MarketCopy of Linkage
(2.)Amberjet14.16Tons per AnnumManufacturerRoad1110 Open MarketCopy of Linkage
(3.)Palladium3.24Tons per AnnumManufacturerRoad385 Open MarketCopy of Linkage
(4.)Methyl Chloride144.6Tons per AnnumManufacturerRoad20 Open MarketCopy of Linkage
(5.)Iodine7.68Tons per AnnumManufacturerRoad70 Open MarketCopy of Linkage
(6.)Absolute alcohol (moisture free)6.24Tons per AnnumManufacturerRoad120 Open MarketCopy of Linkage
(7.)Silicon tetra chloride32.64Tons per AnnumManufacturerRoad530 Open MarketCopy of Linkage
(8.)n-Heptane151.32Tons per AnnumManufacturerRoad375 Open MarketCopy of Linkage
(9.)Formaldehyde277.08Tons per AnnumManufacturerRoad375 Open MarketCopy of Linkage
(10.)Caustic Flakes118.08Tons per AnnumManufacturerRoad120 Open MarketCopy of Linkage
(11.)Diethyl amine117324Tons per AnnumManufacturerRoad375 Open MarketCopy of Linkage
(12.)Hexane1030.08Tons per AnnumManufacturerRoad290 Open MarketCopy of Linkage
(13.)Sodium hydroxide7.2Tons per AnnumManufacturerRoad20 Open MarketCopy of Linkage
(14.)Ethanol3117.84Tons per AnnumManufacturerRoad125 Open MarketCopy of Linkage
(15.)Sodium bicarbonate24.12Tons per AnnumManufacturerRoad210 Open MarketCopy of Linkage
(16.)Potassium bicarbonate69.84Tons per AnnumManufacturerRoad20 Open MarketCopy of Linkage
(17.)Dimethylsulphoxide400.56Tons per AnnumManufacturerRoad375 Open MarketCopy of Linkage
(18.)Methanol76.32Tons per AnnumManufacturerRoad60 Open MarketCopy of Linkage
(19.)Magnesium63.72Tons per AnnumManufacturerRoad440 LinkageCopy of Linkage
(20.)Tetra ethoxysilane (TEOS)96.96Tons per AnnumManufacturerRoad390 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube28.7522.2928.4980 per 24 Hr
(2.)PM10Micro Gram per Meter Cube92.9273.7192.73100 per 24 Hr
(3.)PM2.5Micro Gram per Meter Cube37.2524.7936.8460 per 24 Hr
(4.)SO2Micro Gram per Meter Cube24.9218.7524.6480 per 24 Hr
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l2085.488.82501000
(2.)Total Hardnessmg/l2352201.6200600
(3.)Fluoridemg/l1.40.411.5
(4.)pHNA8.17.76.58.5
(5.)TDSmg/l74106625002000
(6.)TSSOthersNTU0.1015
    14.3.     No. of Surface Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l68.75D
(2.)pHNA8.487.56A
(3.)BODmg/l7.22.3D
(4.)DOmg/l5.14.1C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.138.170
(2.)Leq(Day)A-weighted decibels(dB(A))63.241.575
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.767.8
(2.)P(Phosphorus)Milligram per Kilogram2774.324
(3.)N(Nitrogen)Milligram per Kilogram189.0620.2
(4.)K(Potassium)Milligram per Kilogram378.332
(5.)Electric ConductivityMillisiemens per Centimetre0.45850.1089
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDahej SEZ, water supply dept.510.0 Not Appliacble PipelineOthersPipelineDSL/CSSPECIALTY/ALT/2018/134817 Nov 2018150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial1410ETPOthersTo CMEE4.509.5
(2.)Domestic10.8015STPGreen Belt Renewal Plant10.8
16.1.
(a)Total Waste Water Generation 24.8
(b)Total Discharged Water 9.5
(c)Total Reused Water 15.3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre38RoadAuthorized Recyclers
(2.)Discarded materials drum,Liners/bags/carboysHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons38RoadAuthorized Recyclers
(3.)Diethyl amine HCl saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)155Tons44RoadCo-Processing
(4.)Waste from scrubberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons43.7RoadOthersTo CMEE after treated in ETP
(5.)Distillation Residue/Organic bottom residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)160Tons44RoadCo-Processing
(6.)spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7000Tons38RoadAuthorized Recyclers
(7.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons44RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube24.880.07.40932.28980 /24hr
(2.)PM2.5Microgram per Meter Cube26.500.00.0026.5060 /24hr
(3.)PM10Microgram per Meter Cube81.130.00.87382100 /24hr
(4.)SO2Microgram per Meter Cube20.670.00.83921.5180 /24hr
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel70.2OthersCO0.2256
(2.)ThermopackBriquettes150.2PM100.0001
(3.)DG setDiesel70.2NOx0.5757
(4.)DG setDiesel70.2SO20.0692
(5.)ThermopackBriquettes150.2NOx0.0762
(6.)DG setDiesel70.2PM100.0743
(7.)Process-110.1HCL0.11
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Torrent Power Ltd, Dahej SEZ
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 x 250 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.9886
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.9886
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 27178
(b)Waste/Barren Land 3283
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 22165
(e)Settlements 419
(f)Industrial 3280
(g)Forest 592
(h)Mangroves 2.7
(i)Marine Area 0
(j)Others : mudflat, Saltpans 5874
    Total 62793.7
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area0.312434
(2.)Green belt0.200024
(3.)OthersOpen Land & Road0.476154
Total 0.988612
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot within the study area..
(2.)WLSNot within the study area..
(3.)NPANot within the study area..
(4.)ESZsNot within the study area..
(5.)Wildlife CorridorsNot within the study area..
(6.)CorridorsNot within the study area..
(7.)ESAsNot within the study area..
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNear Lakhigam7West
(2.)Defence InstallationsNot within the study area..
(3.)Archaeological SitesNot within the study area..
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.988612
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Flapshell Turtle and Common Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 0
(iii)Period of Implementation 0
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jolva Lake
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.23
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 70
(d)Temporary Employment- During Operation 0
(e)No. of working days 340
(f)Total Manpower 130
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.269024
(b)Percentage of Total Project Area 27.21
(c)No. of Plants to be Planted 404
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialCompany will pay the taxes & other levies, which will be considerably beneficial to the Government Exchequer.
(2.)SocialCompany has planned to spend Rs.30 Lakhs for 5 years for CSR activities. Which will result in development or improvement of many public amenities/facilities of the area. This CSR activities will also
(3.)EnvironmentalGreenbelt will be developed at the periphery of plant premises as well as within the premises
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 151
(ii)Name of the EIA Consultant Unistar Environment & Research Labs Pvt. Ltd.
(iii)Address C-4, White House, Near GIDC Office, Vapi-396195
(iv)Mobile No. 9909946373
(v)Landline No. 2435610
(vi)Email Id unistar@uerl.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParimal Desai
DesignationManager
Name of Company (Applicant Name should not be given here)M/S. CS PERFORMANCE CHEMICALS PVT. LTD.
Addressplot no-Z-33,Dahej SEZ Ltd., Dahej
Print