Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Varahi chemicals
(b)Name of the Company / Organisation VARAHI CHEMICALS
(c)Registered Address PLOT NO.C-1 91/5, Phase no. – I, Vatva, Ahmedabad,,Ahmedabad,Gujarat-382445
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Jagesh B Patel
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address PLOT NO.C-1 91/5, Phase no. – I, Vatva, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-382445
(d)Pin code 382445
(e)E-mail varahiec@rediffmail.com
(f)Telephone No. 79-40303022
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/38201/2019
(e)Master Proposal Number(Single Window) SW/109046/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. C-1 91/5
(b)Pincode 382445
(c)Bounded Latitudes (North)
From
Degree 22°58'5.53"
Minutes
Second
From
Degree 22°58'5.68"
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72°38'5.16"
Minutes
Second
From
Degree 72°38'6.71"
Minutes
Second
(e)Survey of India Topo Sheet No. 000
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 45
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 55
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmedabad CityGIDC VATVA
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/IND2/30836/2019
(b)Date of Apply of TOR 14 Feb 2019
(c)Date of Issue of TOR / Standard ToR 04 May 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is in notified industrial estate
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reaction Vessel35 KL2 No
(2.)Boiler1.0 TPH
(3.)Tray DryerNA
(4.)Spin Flash DryerNA
(5.)Blender2 MT
(6.)Reaction Vessel10 KL2 Nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Optical Whiting Agent1200Tons per AnnumRoad,Rail,OthersShipment
(2.)Dye Fixing Agent600Tons per AnnumRoad,Rail,OthersShipment
(3.)Textile Binder600Tons per AnnumRoad,Rail,OthersShipment
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Sep 2018
(iv)Valid Upto 01 Aug 2023
(v)File No. 000
(vi)Application No. 96032
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.25
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.05
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 100
(e) Funds Allocated for Environment Management Capital(%) 4.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Caustic Lye1200Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(2.)DASDA250Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(3.)DCDA250Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(4.)Formaldehyde180Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(5.)Emulsifier250Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(6.)Styrene200Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(7.)Sulphanilic Acid170Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(8.)Sulphite270Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(9.)Acrylamide480Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(10.)Butyl Acetate300Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(11.)Di ethyl aniline200Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(12.)Cynuric Chloride250Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2018 To 31 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube57.8432.9651.2060
(2.)SO2Micro Gram per Meter Cube17.799.1414.6280
(3.)NOxMicro Gram per Meter Cube24.9815.6424.1580
(4.)PM10Micro Gram per Meter Cube90.5262.4684.89100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0.40.111
(2.)Total Hardnessmg/l366292600600
(3.)Fluoridemg/l0.360.121.01.5
(4.)pHNA8.167.308.08.5
(5.)TDSmg/l1527104220002000
(6.)Chloridesmg/l3101986001000
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.24.2D
(2.)BODmg/l8.24.1D
(3.)CODmg/l3612.1D
(4.)pHNA8.157.26D
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.848.175
(2.)Leq(Night)A-weighted decibels(dB(A))66.234.170
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.267.14
(2.)P(Phosphorus)Milligram per Kilogram172106
(3.)Electric ConductivityMillisiemens per Centimetre0.630.36
(4.)N(Nitrogen)Milligram per Kilogram190160
(5.)K(Potassium)Milligram per Kilogram215120
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 7 To 9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Vatva11.301Copy of Permission LetterPipelineIntake Well00017 Feb 201050
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Plant Operation4.610PSOthersCommon Facility004.6
16.1.
(a)Total Waste Water Generation 4.6
(b)Total Discharged Water 4.6
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP WASTEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4.7Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons25RoadAuthorized Recyclers
(3.)Discarded Container and DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.521.050.0190.53100
(2.)SO2Microgram per Meter Cube17.790.750.00917.79980
(3.)NOxMicrogram per Meter Cube24.980.750.00524.98580
(4.)PM2.5Microgram per Meter Cube57.841.050.0157.8560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerPNG110.20PM10,SO2,NOx150,100,50
(2.)HAGPNG110.20PM10,SO2,NOx150,100,50
(3.)Spray DrierNA110.20PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Torrent Power Ltd
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 0.0697
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 00
    Total Land 0.0697
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 00
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : 0 00
    Total 0
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.069700
Total 0.0697
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA100Not is Study Area
(2.)ESAsNA100Not is Study Area
(3.)CorridorsNA100Not is Study Area
(4.)WLSNA100Not is Study Area
(5.)NPANA100Not is Study Area
(6.)ESZsNA100Not is Study Area
(7.)Wildlife CorridorsNA100Not is Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA100Not is Study Area
(2.)Archaeological SitesNA100Not is Study Area
(3.)Defence InstallationsGandhinagar35Not is Study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0697
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 10
(e)No. of working days 300
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.005
(b)Percentage of Total Project Area 7.17
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe proposed plant having adequate EMS
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 20606
(ii)Name of the EIA Consultant Satva Environ Consultancy
(iii)Address 14,15, Gopal Patel Estate, CTM, Ahmedabad
(iv)Mobile No. 9426347013
(v)Landline No. 0792585321
(vi)Email Id satvaenviron@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Jul 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)26/07/201938201
(2.)30/09/2019The correction have been made as per the instruction received
(3.)04/10/2019Verify your application inline with EIA Notification 2006 with applicability of General Condition.
(4.)08/01/2020The correction have been made as per the instruction received
(5.)15/01/2020Verify your application inline with EIA Notification 2006 with applicability of General Condition.
(6.)28/01/2020The correction have been made as per the instruction received
(7.)05/02/2020Verify your application inline with EIA Notification 2006 with applicability of General Condition.
(8.)19/03/2020The correction have been made as per the instruction received
(9.)14/04/2020Verify your application inline with EIA Notification 2006 with applicability of General Condition.
(10.)01/04/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJagesh B Patel
DesignationPartner
Name of Company (Applicant Name should not be given here)VARAHI CHEMICALS
AddressPLOT NO.C-1 91/5, Phase no. – I, Vatva, Ahmedabad
Print