Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Shraddha Chemicals – Unit II
(b)Name of the Company / Organisation SHRADDHA CHEMICALS UNIT II
(c)Registered Address Plot No 6802 Road No East 29 GIDC Ankleshwar,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Ashokbhai Rudani
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No 6802 Road No East 29 GIDC Ankleshwar,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail shraddha_chemii@yahoo.com
(f)Telephone No. 261-0000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/28597/2018
(e)Master Proposal Number(Single Window) SW/108805/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No: 6802, Road No: East 29 GIDC Ankleshwar
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.61792500
Minutes
Second
From
Degree 21.61820556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.04166667
Minutes
Second
From
Degree 73.04166667
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 38.25
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 100
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarGIDC Ankleshwar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/83809/2018
(b)Date of Apply of TOR 28 Aug 2018
(c)Date of Issue of TOR / Standard ToR 10 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located in notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Close Reactor M.S or Glass Line5 or 10 KL
(2.)Open / Drowning Reactor25 KL
(3.)Cooling Tower1 TR
(4.)Close Reactor (S.S)10 KL
(5.)Filter Press48*48
(6.)Ball Mill5 KL
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pigment Beta Blue (15:3 & 15:4)600Tons per AnnumRoad
(2.)Copper Phthalocyanine Blue – Powder600Tons per AnnumRoad
(3.)Pigment Alpha Blue (15:0 & 15:1)300Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Apr 2016
(iv)Valid Upto 01 Mar 2021
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.60
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.45
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.01
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.14
(e) Funds Allocated for Environment Management Capital(%) 75.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7094.40
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7094.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Xylene/IBA2520Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.413.218.280
(2.)NOxMicro Gram per Meter Cube29.421.129.180
(3.)PM2.5Micro Gram per Meter Cube36.4283660
(4.)PM10Micro Gram per Meter Cube90.97090100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.60.10.11.5
(2.)Chloridesmg/l2681262501000
(3.)Total Hardnessmg/l348198300600
(4.)pHNA86.878.5
(5.)TSSmg/l2112
(6.)TDSmg/l7124245002000
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l62D
(2.)pHNA7.47.1D
(3.)DOmg/l6.24.8D
(4.)CODmg/l2012D
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))653970
(2.)Leq(Day)A-weighted decibels(dB(A))714875
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.66.9
(2.)N(Nitrogen)Milligram per Kilogram319218
(3.)Electric ConductivityMillisiemens per Centimetre628428
(4.)P(Phosphorus)Milligram per Kilogram7652
(5.)K(Potassium)Milligram per Kilogram160109
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC29.053Copy of Permission LetterPipelineOthersGIDC Water Supply35407 Feb 201930
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process, Washing and Boiler4.6520Treated in Proposed ETPOthersTreated water reuse within premises4.650.00
(2.)Domestic0.960---Otherssoak pit/septic system00.96
16.1.
(a)Total Waste Water Generation 5.61
(b)Total Discharged Water 0.96
(c)Total Reused Water 4.65
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent H2SO4Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)850Tons5RoadAuthorized Recyclers
(2.)Evaporated SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.44Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.20Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded ContainersIndustrial Waste600Tons10RoadAuthorized Recyclers
(5.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube84.4500.0084.45100
(2.)SO2Microgram per Meter Cube40.7300.0040.7380
(3.)PM2.5Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube47.3300.0047.3380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBiofuel301.1PM10,SO2,NOxPM<150mg/Nm3, SOx<100ppm, NOx<50ppm
(2.)DG Set StandbyHSD100.3PM10,SO2,NOxPM<150m/NM3. SOx<100ppm, NOx<50ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 110
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 Nos.
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0.0704
    Total Land 0.0704
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4743.53
(b)Waste/Barren Land 5097.08
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1418.57
(e)Settlements 4562.30
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Scrub land/Follow land/Sandy Land 15607.22
    Total 31428.699999999997
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersTotal area0.0704
Total 0.0704
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnil100not within study area
(2.)Critically Polluted Areanil100not within study area
(3.)ESZsnil100not within study area
(4.)Corridorsnil100not within study area
(5.)ESAsnil100not within study area
(6.)Wildlife Corridorsnil100not within study area
(7.)NPAnil100not within study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnil100not within study area
(2.)Archaeological Sitesnil100not within study area
(3.)Defence Installationsnil100not within study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0704
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area GIDC Water Reservoir and Amravati River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8.90
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 00
(e)No. of working days 330
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.0146
(b)Percentage of Total Project Area 20.74
(c)No. of Plants to be Planted 45
(d)Funds Allocated for Plantation 25000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation, CSR activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc.
(iii)Address Green Empire (Anupushpam), Above Axis Bank, Near Yash Complex, Gotri Main Road, Vadodara- 390021
(iv)Mobile No. 9998036028
(v)Landline No. 2652371269
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 14 Jun 2029
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)26/07/2019Your proposal falls under Category A as per the EIA Notification 2006.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshokbhai Rudani
DesignationPartner
Name of Company (Applicant Name should not be given here)SHRADDHA CHEMICALS UNIT II
AddressPlot No 6802 Road No East 29 GIDC Ankleshwar
Print