Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Genius Organics
(b)Name of the Company / Organisation GENIUS ORGANICS
(c)Registered Address Survey No:908/3, Ganesha Chokdi Road, Near Shahin Ice Factory street, GIDC Estate,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ghanshyam Kantibhai Barvalia
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address H-4137, Phase-4 GIDC colony, near vision school, GIDC Ankleshwar, G.i.d.c, Bharuch,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail genius_organic@yahoo.com
(f)Telephone No. 2646-222305
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/37972/2019
(e)Master Proposal Number(Single Window) SW/108614/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 908/3
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21.558136
Minutes
Second
From
Degree 21.558211
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.989052
Minutes
Second
From
Degree 72.989436
Minutes
Second
(e)Survey of India Topo Sheet No. F43M14, F43N2,F43N3, F43M15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 26
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarPanoli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/24302/2019
(b)Date of Apply of TOR 06 Mar 2019
(c)Date of Issue of TOR / Standard ToR 16 May 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project fall under industrial GIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Stainless Steel Reactor5 KL2 Nos.
(2.)Dryer3 Nos
(3.)Rubber Lining MS Vessel/ HDPE vessel15 KL2 Nos.
(4.)Filter Press48"/36" pp/ms4 Nos.
(5.)Storage Tank20 KL2 Nos.
(6.)Chilling Plant50 TR
(7.)Boiler2 TPH
(8.)DG Set63 KVA
(9.)Blender2 Nos.
(10.)Spiral Tank20 KL4 Nos
(11.)Rubber Lining MS Vessel/HDPE Vessel5 KL2 Nos.
(12.)Compressor1 Nos.
(13.)Glass Lined Reactor3 KL2 Nos.
(14.)Classifier2 Nos.
(15.)Spiral Tank20 KL4 Nos
(16.)Stainless Steel Reactor15 KL2 Nos.
(17.)Pulverizer4 Nos.
(18.)Hot Air Dryer1000 Unit
(19.)HDPE/PP/SS pump20 Nos.
(20.)Ball Mill2000 Kg
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)PIGMENT LAKE RED-C75OthersMT/MONTH/OrRoad
(2.)BETA BLUE75OthersMT/MONTH/OrRoad
(3.)PIGMENT RED F4R75OthersMT/MONTH/OrRoad
(4.)PIGMENT ORANGE-10G75OthersMT/MONTH/OrRoad
(5.)PIGMENT RED RC75OthersMT/MONTH/OrRoad
(6.)PIGMENT YELLOW-1275OthersMT/MONTH/OrRoad
(7.)PIGMENT RUBIN TONNER75OthersMT/MONTH/OrRoad
(8.)PIGMENT MAROON TONNER75OthersMT/MONTH/OrRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.3
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.005
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.011
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 25
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 25
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CPC900Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(2.)2B Acid417.6Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(3.)3A Acid540Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
(4.)4B Acid288Tons per AnnumAhmedabadRoad215 Open MarketCopy of Linkage
(5.)Ammonia183.6Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(6.)Beta Napthol234Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(7.)Caustic Lye468Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(8.)HCL900Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(9.)Napthol ASE450Tons per AnnumAhmedabadRoad215 Open MarketCopy of Linkage
(10.)PMP (1-Phenyl, 3-Methyl, 5- Pyrazolone)365.4Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
(11.)Sodium Sulphate135Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(12.)Sulphamic Acid45Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(13.)Caustic Flakes151.2Tons per AnnumAhmedabadRoad215 Open MarketCopy of Linkage
(14.)Sulphuric Acid90Tons per AnnumAhmedabadRoad214 Open MarketCopy of Linkage
(15.)Calcium Chloride360Tons per AnnumAhmedabadRoad215 Open MarketCopy of Linkage
(16.)NaNO2212.4Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
(17.)Bon Acid360Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(18.)Rosin75.6Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(19.)3’, 3’ DCB365.4Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
(20.)C Acid360Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
(21.)Fast Scarlet G Base598.8Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(22.)Sodium hydroxide9Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(23.)Acetic Acid306Tons per AnnumAnkleshwarRoad16 Open MarketCopy of Linkage
(24.)Sulphanilic Acid10.8Tons per AnnumVadodaraRoad102 Open MarketCopy of Linkage
(25.)X-100 Oil50.4Tons per AnnumMumbaiRoad314 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 31 Mar 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube48.926.548.560
(2.)SO2Micro Gram per Meter Cube32.617.5231.1280
(3.)NOxMicro Gram per Meter Cube38.321.537.680
(4.)PM10Micro Gram per Meter Cube8265.881.6100
    14.2.     No. of Ground Water Monitoring Locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.676.666.58.5
(2.)Chloridesmg/l8942872501000
(3.)Fluoridemg/l0.420.0111.5
(4.)Total Hardnessmg/l480200200600
(5.)TDSmg/l28208905002000
(6.)TSSmg/l00000
(7.)Heavy MetalsIronmg/l0.20.010.30
    14.3.     No. of Surface Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.766.98A
(2.)BODmg/l00A
(3.)DOmg/l00A
(4.)OthersChloridemg/l810105A
(5.)CODmg/l404A
    14.4.     No. of Ambient Noise Monitoring Locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.746.575
(2.)Leq(Night)A-weighted decibels(dB(A))44.236.270
    14.5.     No. of Soil Sample Monitored Locations : 11
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.786.48
(2.)P(Phosphorus)Milligram per Kilogram162.4746.2
(3.)K(Potassium)Milligram per Kilogram0.910.03
(4.)Electric ConductivityMillisiemens per Centimetre00
(5.)N(Nitrogen)Milligram per Kilogram144.698.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply62.52Copy of Permission LetterPipelineOthersPipe Line43916 Sep 201534.4
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)industrial3030primaryOthersCMEE (Bharuch Enviro Infrastructure Limited)030
(2.)Domestic1.51.5Biological TreatmentOthersDischarge to Soak pit Via Septic Tank01.5
16.1.
(a)Total Waste Water Generation 31.5
(b)Total Discharged Water 31.5
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.404Tons50RoadAuthorized Recyclers
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Discarded ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)81Tons50RoadAuthorized Recyclers
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons20RoadOthersReuse OR sold to registered recycler.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube21.5640.7822.3480
(2.)PM2.5Microgram per Meter Cube00000
(3.)PM10Microgram per Meter Cube80.6243.1083.72100
(4.)SO2Microgram per Meter Cube17.5240.05417.57480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerNatural Gas/Bio Coal110.6PM10,SO2,NOxPM: 0.04 gm/sec, SOx: 0.00069, NOx: 0.01
(2.)Hot Air DryerNatural Gas/Bio Coal110.6PM10,SO2,NOxPM: 0.05, SOx: 0.00088, NOx: 0.11
(3.)DG SetHSD60.25SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 13.33
(b)Source Dakshin Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 123 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.099
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.099
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 0.00321
(c)Grazing/ Community Land 0.00608
(d)Surface Water Bodies 0.00027
(e)Settlements 0.00176
(f)Industrial 0.00159
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Miscellaneous 0.01847
    Total 0.03138
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.0099
(2.)Main Plant0.025
(3.)Area for Solid Waste Management0.0270
(4.)Built Up Area0.0119
(5.)OthersOpen area, roads0.0252
Total 0.099
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA00
(2.)CorridorsNA00
(3.)NPANA00
(4.)Wildlife CorridorsNA00
(5.)ESAsNA00
(6.)Critically Polluted AreaNA00
(7.)WLSNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Archaeological SitesNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.099
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Amlakhadi Nadi 2.5 km towards W
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 9
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 0
(e)No. of working days 320
(f)Total Manpower 19
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.0099
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 50
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEmployment Generation and Government Revenue
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court Stay Order 4055 of 2018
(ii)Name of the EIA Consultant Yuva Enviro Experts
(iii)Address 231/A,302 Platinum Plaza, Opp.IOC petrol pump, Nr.Judges bunglow road, Bodakdev 380054
(iv)Mobile No. 9825044681
(v)Landline No. 0794002566
(vi)Email Id yuvaenviro11@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGhanshyam Kantibhai Barvalia
DesignationProprietor
Name of Company (Applicant Name should not be given here)GENIUS ORGANICS
AddressSurvey No:908/3, Ganesha Chokdi Road, Near Shahin Ice Factory street, GIDC Estate
Print