Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Prasad International Pvt. Ltd
(b)Name of the Company / Organisation PRASAD INTERNATIONAL PRIVATE LIMITED
(c)Registered Address Plot No. 3430, Phase IV, GIDC-Vatva,,Ahmedabad,Gujarat-382445
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Bhagyesh Parikh
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 3430, Phase IV, GIDC-Vatva,,Ahmedabad City,Ahmedabad,Gujarat-382445
(d)Pin code 382445
(e)E-mail bhagyesh@prasadinternational.com
(f)Telephone No. 79-40258800
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/29771/2018
(e)Master Proposal Number(Single Window) SW/107229/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 3430, Phase No. IV, GIDC-Vatva, Ahmedabad
(b)Pincode 382445
(c)Bounded Latitudes (North)
From
Degree 22.960
Minutes
Second
From
Degree 22.961
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.644
Minutes
Second
From
Degree 72.645
Minutes
Second
(e)Survey of India Topo Sheet No. F43G9A12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 45
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 274.97
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmedabad CityVatva
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/108911/2018
(b)Date of Apply of TOR 02 Nov 2018
(c)Date of Issue of TOR / Standard ToR 10 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason part of notified GIDC Estate
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Dyes & Pigments70TPM
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Solvent Dyes20OthersTPMRoad
(2.)Azo Pigment50OthersTPMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Dec 2018
(iv)Valid Upto 30 Sep 2023
(v)File No. AWH-98080
(vi)Application No. GPCB/ABD/VT/CCA-61/ID-13135
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 6
(b) Funds Allocated for Environment Management (Capital) (in crores) 1
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.84
(e) Funds Allocated for Environment Management Capital(%) 16.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 15
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 15
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Butanol1.20OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(2.)Di Chloro Benzene20.30OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(3.)Sodium hydroxide34.25OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(4.)Sodium nitrite25.30OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(5.)HCL71.40OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(6.)Methanol1.20OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(7.)Acetic Acid18.50OthersTPMDomesticRoad30 Open MarketCopy of Linkage
(8.)Aniline8OthersTPMDomesticRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2018 To 29 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube11068108100
(2.)PM2.5Micro Gram per Meter Cube46.528.146.260
(3.)SO2Micro Gram per Meter Cube28.513.427.480
(4.)NOxMicro Gram per Meter Cube33.117.632.180
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH unit7.87.18.50
(2.)TDSmg/l150411535002000
(3.)Fluoridemg/l0.580.5111.5
(4.)TSSmg/l0000
(5.)Heavy Metals0mg/l0000
(6.)Chloridesmg/l6964812501000
(7.)OthersAlkalinitymg/l318285200600
(8.)Total Hardnessmg/l399286200600
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherspH Unit7.597.37E
(2.)DOmg/l5.83.5E
(3.)OthersTurbiditymg/l2416E
(4.)CODmg/l00E
(5.)BODAlkalinitymg/l00E
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.952.875
(2.)Leq(Night)A-weighted decibels(dB(A))53.239.870
    14.5.     No. of Soil Sample Monitored Locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram193123
(2.)pHOtherspH unit7.917.16
(3.)N(Nitrogen)Milligram per Kilogram146115
(4.)P(Phosphorus)Milligram per Kilogram7139
(5.)Electric ConductivityOthersµs/cm00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC70.501 Not Appliacble PipelineOthersGIDCVIA/2018-19/12-E/42619 Feb 201970.50
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial98.5125ETP (Primary, Secondary and tertiary followed by RO and MEE)Reuse within the Plant & Recycling,OthersDischarge to CETP79.5019.0
(2.)Domestic3.000OthersSoak Pit / Septic Tank03
16.1.
(a)Total Waste Water Generation 101.5
(b)Total Discharged Water 22
(c)Total Reused Water 79.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Chemical SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Evaporation SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)160Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.5Tons0RoadOthersCo-Processing or incineration at CHWIF site
(4.)Process ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons0RoadOthersCo-Processing or incineration at CHWIF site
(5.)Bleed Liquor from scrubberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)160Tons0Others-OthersTreatment along with effluent in ETP
(6.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3000Tons0RoadOthersDisposal by selling to scrap dealers
(7.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)290Tons0RoadOthersreuse in process or send to authorize end users
(8.)Spent Oil/Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube1030.20.196103.20100
(2.)SO2Microgram per Meter Cube28.50.2028.580
(3.)Others(Specify)HClMicrogram per Meter Cube00.10.0020200
(4.)PM2.5Microgram per Meter Cube00000
(5.)NOxMicrogram per Meter Cube33.10.20.04933.1580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerBiofuel (Agrowaste) &/OR Coal )220.38SO2100
(2.)Hot Air GeneratorBiofuel (Agrowaste) &/OR Coal220.3NOx50
(3.)AutoclaveBiofuel (Agrowaste) &/OR Coal220.3PM10150
(4.)All Reactor of process plant0150.1HCL20
(5.)Steam BoilerBiofuel (Agrowaste)&OR coal220.38PM10150
(6.)DG setDiesel120.15PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 219
(b)Source Torrent power Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 150 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0.4133
(d)Revenue Land 0
(e)Other Land 0.0
    Total Land 0.4133
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 16134.26
(b)Waste/Barren Land 1218.32
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 325.08
(e)Settlements 10253.66
(f)Industrial 3484.17
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : none 0
    Total 31415.490000000005
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.4133Total Plot area of the plant is 0.4133 ha
(2.)Othersnone0
Total 0.4133
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZs000
(2.)NPA000
(3.)WLS000
(4.)ESAsNone10None within 10 km radius from the plant site.
(5.)Wildlife Corridors000
(6.)Critically Polluted Area000
(7.)Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersLakesChandola Lake6.50
(2.)Defence Installations000
(3.)Forest000
(4.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.4133
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sabarmati River stream
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 9.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 34
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 34
(e)No. of working days 26
(f)Total Manpower 68
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.1365
(b)Percentage of Total Project Area 33.03
(c)No. of Plants to be Planted 120
(d)Funds Allocated for Plantation 1.22
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA053
(ii)Name of the EIA Consultant Envisafe Environment Consultants
(iii)Address 3rd Floor Akash Ganda Complex, B/s Suvidha Shopping Centre, Nr. Parimal Underpass, Paldi, Ahemdabad-38007
(iv)Mobile No. 9328961241
(v)Landline No. 0792665087
(vi)Email Id envisafe@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 22 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhagyesh Parikh
DesignationDirector
Name of Company (Applicant Name should not be given here)PRASAD INTERNATIONAL PRIVATE LIMITED
AddressPlot No. 3430, Phase IV, GIDC-Vatva