|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Darshan Dye Chem | (b)Name of the Company / Organisation | DARSHAN DYE CHEM | (c)Registered Address | Plot No- I-147/ A & B, Phase-II GIDC Estate, Vatva, Ahmedabad 382445,,Ahmedabad,Gujarat-382445 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Girishkumar H Patel | (b)Designation (Owner/ Partner/ CEO) | Proprietor | (c)Address | Plot No- I-147/ A & B, Phase-II GIDC Estate, Vatva, Ahmedabad 382445,,Ahmedabad City,Ahmedabad,Gujarat-382445 | (d)Pin code | 382445 | (e)E-mail | darshandyechemec@rediffmail.com | (f)Telephone No. | 79-25254545 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/IND2/36868/2018 | (e)Master Proposal Number(Single Window) | SW/106537/2019 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. I-147/ A & B | (b)Pincode | 382445 | (c)Bounded Latitudes (North) | | From | | Degree | 22°57'33.02" | Minutes | | Second | | From | | Degree | 22°57'33.42" | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72°38'19.85" | Minutes | | Second | | From | | Degree | 72°38'20.48" | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 000 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 55 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 55 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Ahmedabad | Ahmedabad City | GIDC Vatva | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/GJ/IND2/28121/2018 | (b)Date of Apply of TOR | 18 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 30 Oct 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The project is in GIDC Vatva | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Spray Dryer 1500 LPH | Process Stack | | (2.) | MSRL Vessel | 30 KL | 2 Nos | (3.) | MSRL Vessel | 25 KL | 2 Nos | (4.) | Blender | 500 Kg | 2 Nos | (5.) | MSRL Vessel | 7 KL | 2 Nos | (6.) | Boiler | 1 MT | | (7.) | MSRL Vessel | 15 KL | 5 Nos | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Various Types of Reactive Dyes | 3180 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 2.00 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.20 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.10 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.05 | (e) Funds Allocated for Environment Management Capital(%) | 10.00 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10500 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 10500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 4-NAPSA | 10 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (2.) | 2 Pyridone | 50 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (3.) | Acetic Anhydride | 100 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (4.) | Aniline Oil | 10 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (5.) | Basic Chromium Sulphate | 10 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (6.) | Caustic Flakes | 100 | Tons per Annum | | Open market | Road | | 25 | Open Market | | Copy of Linkage | (7.) | Cynuric Chloride | 50 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (8.) | DASA | 15 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (9.) | G Salt | 25 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (10.) | HCL | 100 | Tons per Annum | | Open Market | Road | | 50 | Open Market | | Copy of Linkage | (11.) | H acid | 150 | Tons per Annum | | Open Market | Road | | 50 | Open Market | | Copy of Linkage | (12.) | V.S. | 100 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (13.) | Various Type of Other Raw Materials | 1500 | Tons per Annum | | 25 | Road | | 50 | Open Market | | Copy of Linkage | (14.) | 4 NAP | 10 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (15.) | 5 Sulpho Hydrozone | 10 | Tons per Annum | | Open Market | Road | | 50 | Open Market | | Copy of Linkage | (16.) | MUA ((Meta Urido Aniline) | 25 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (17.) | DASDA | 10 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (18.) | MPD | 15 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (19.) | Benzoyl Chloride | 25 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (20.) | EBAMSA | 10 | Tons per Annum | | Open Market | Road | | 50 | Open Market | | Copy of Linkage | (21.) | Formaldehyde | 5 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (22.) | J Acid | 20 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | (23.) | Acetyl MPDSA | 25 | Tons per Annum | | OPen Market | Road | | 25 | Open Market | | Copy of Linkage | (24.) | K Acid | 10 | Tons per Annum | | Open Market | Road | | 50 | Open Market | | Copy of Linkage | (25.) | Soda Ash | 125 | Tons per Annum | | Open Market | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Nov 2018 To 31 Jan 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 20.59 | 9.14 | 17.93 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 27.36 | 14.59 | 25.64 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 95.53 | 62.46 | 94.83 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 57.75 | 45.13 | 53.16 | 60 | |
14.2. No. of Ground Water Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.96 | 7.12 | 7.5 | 7.5 | (2.) | TDS | | | mg/l | | 1365 | 1042 | 2000 | 2000 | (3.) | Chlorides | | | mg/l | | 335 | 178 | 600 | 600 | (4.) | Fluoride | | | mg/l | | 0.86 | 0.27 | 1 | 2 | (5.) | TSS | | | mg/l | | 75 | 55 | 100 | 100 | (6.) | Total Hardness | | | mg/l | | 384 | 210 | 600 | 600 | |
14.3. No. of Surface Water Monitoring Locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.84 | 7.62 | D | (2.) | BOD | | mg/l | | 8.5 | 4.5 | D | (3.) | DO | | mg/l | | 5.7 | 4.1 | D | (4.) | COD | | mg/l | | 35 | 20 | D | |
14.4. No. of Ambient Noise Monitoring Locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 71.8 | 43.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 65.78 | 35.45 | 70 | |
14.5. No. of Soil Sample Monitored Locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.89 | 7.47 | (2.) | P(Phosphorus) | Others | gm/KG | 0.54 | 0.26 | (3.) | N(Nitrogen) | Others | gm/KG | 0.89 | 0.67 | (4.) | K(Potassium) | Others | gm/KG | 0.78 | 0.41 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.21 | 0.19 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 11 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 7 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC | 54.50 | 1.00 | Copy of Permission Letter | Pipeline | | Intake Well | | 000 | 14 Jun 2017 | 100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Operation | 3.70 | 4.00 | PS | Others | Spray Drier | 0 | 3.70 | |
|
16.1. | (a)Total Waste Water Generation | 3.7 | (b)Total Discharged Water | 3.7 | (c)Total Reused Water | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.50 | Kilolitre | 50 | Road | | Authorized Recyclers | | (3.) | Discarded Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 27.76 | 1.30 | 0.002 | 27.762 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 57.75 | 1.15 | 0.01 | 57.76 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 95.53 | 1.14 | 0.01 | 95.54 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 20.59 | 0.75 | 0.005 | 20.59 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler | NG | 11 | 0.20 | PM10,SO2,NOx | | 150,100,50 | (2.) | HAG | NG | 11 | 0.200 | PM10,SO2,NOx | | 150,100,50 | (3.) | Spray Drier | NA | 11 | 0.100 | PM10 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | Torrent Power Ltd | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 00 | (b)Private Land | 0.720 | (c)Government Land | 00 | (d)Revenue Land | 00 | (e)Other Land | 00 | Total Land | 0.720 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 00 | (b)Waste/Barren Land | 00 | (c)Grazing/ Community Land | 00 | (d)Surface Water Bodies | 00 | (e)Settlements | 00 | (f)Industrial | 0 | (g)Forest | 0 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : 0 | 0 | Total | 0 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Main Plant | | 0.720 | 00 | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 100 | Not in study area | (2.) | NPA | NA | 100 | Not in study area | (3.) | Critically Polluted Area | NA | 100 | Not in study area | (4.) | WLS | NA | 100 | Not in study area | (5.) | Corridors | NA | 100 | Not in study area | (6.) | ESZs | NA | 100 | Not in study area | (7.) | Wildlife Corridors | NA | 100 | Not in study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Lothal | 60 | Not in study area | (2.) | Defence Installations | | Gandhinagar | 40 | Not in study area | (3.) | Forest | | NA | 100 | Not in study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.720 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in Rs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 10 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 300 | (f)Total Manpower | 40 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 0.002 | (b)Percentage of Total Project Area | 0.28 | (c)No. of Plants to be Planted | 200 | (d)Funds Allocated for Plantation | 2.00 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The project proposed with adequate EMS | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 20606 | (ii)Name of the EIA Consultant | Satva Environ Consultancy | (iii)Address | 14,15, Gopal Patel Estate, CTM,Ahmedabad | (iv)Mobile No. | 9426347013 | (v)Landline No. | 0792585321 | (vi)Email Id | satvaneviron@gmail.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 10 Jul 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 31/05/2019 | Kindly upload standard format of project details & Checklist for industrial projects. Kindly update data of Form 2 in accordance to EIA report. | | (2.) | 19/03/2020 | The correction have been made as per the instruction received | | (3.) | 31/03/2020 | Your project falls under category A of EIA Notification, 2006. | | (4.) | 06/02/2021 | The correction have been made as per the instruction received | | (5.) | 10/02/2021 | YOU ARE REQUESTED TO COMPLY WITH OM DATED 28-01-2021 PUBLISHED BY MOEF&CC IN LETTER AND SPIRIT. | | (6.) | 07/06/2021 | The correction have been made as per the instruction received | | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 08/12/2021 | reply as per minutes | | (2.) | 23/02/2022 | We have already Withdrawal Of EC Application and we have also attached here with online generated Withdrawal letter please consider our Withdrawal application | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Girishkumar H Patel | Designation | Proprietor | Name of Company (Applicant Name should not be given here) | DARSHAN DYE CHEM | Address | Plot No- I-147/ A & B, Phase-II GIDC Estate, Vatva, Ahmedabad 382445 |
|