|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Polymers India | (b)Name of the Company / Organisation | POLYMERS INDIA | (c)Registered Address | Plot No. C-1/355 GIDC Odhav, Ahmedabad,,Ahmedabad,Gujarat-382415 | (d)Legal Status of the Company | Others | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mukesh Patel | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. C-1/355 GIDC Odhav Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-382415 | (d)Pin code | 382415 | (e)E-mail | sagarmilan75@yahoo.in | (f)Telephone No. | 79-22870207 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/IND2/25618/2018 | (e)Master Proposal Number(Single Window) | SW/104959/2019 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Shed No. C-1/355, GIDC Odhav, Ahmedabad, Gujarat | (b)Pincode | 382415 | (c)Bounded Latitudes (North) | | From | | Degree | 23.01935 | Minutes | | Second | | From | | Degree | 23.01936 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.65813 | Minutes | | Second | | From | | Degree | 72.65834 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 47 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 00 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Ahmedabad | Ahmedabad City | Odhav | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SIA/GJ/42604/2018 | (b)Date of Apply of EC | 05 May 2018 | (c)Date of Issue of EC | 31 Dec 1899 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing is exempted in our case as our unit | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | AWH71517 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | N/A | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Polyester Resin | 6 | 150 | 156 | Others | MTPM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Thermic Fluid Heater | 1.0 Lac Kcal/hr. | 00 | 1.0 Lac Kcal/hr. | | (2.) | Blending Vessel | 00 | 1 KL – 1 no. | 1 KL – 1 no. | | (3.) | SS Reactor | 3.0 KL – 1 no. | 5.0 KL – 1 no. | 8.0 KL - 2 nos. | | (4.) | Cooling Tower | 50 TPH– 1 no. | 100 TPH– 1 no. | 50 TPH– 1 no., 100 TPH– 1 no. | | (5.) | DG Set | 00 | 65 KVA– 1 no. | 65 KVA– 1 no. | | (6.) | Premix Vessel | 1 KL– 1 no. | 3 KL– 1 no. | 4 KL - 2 nos. | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 03 Jul 2015 | (iv)Valid Upto | 18 May 2020 | (v)File No. | CCA/ABD/OD-124/ID13085 | (vi)Application No. | 71517 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 0.90 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.033 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.035 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.0705 | (e) Funds Allocated for Environment Management Capital(%) | NaN | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1947.4 | (b)Existing quantity of raw material/fuel | 75.3 | (c)Total quantity of raw material/fuel | 2022.7 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | file attached | 2022.7 | Tons per Annum | | Local Market | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 90.8 | 62.2 | 84.55 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 34.6 | 14.2 | 26.77 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 40.8 | 18.7 | 32.3 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 43.1 | 28.4 | 39.72 | 60 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | pH units | 7.82 | 7.28 | 8.5 | 8.5 | (2.) | TSS | | | mg/l | | 25 | 20 | 00 | 00 | (3.) | TDS | | | mg/l | | 1429 | 1095 | 500 | 2000 | (4.) | Fluoride | | | mg/l | | 0.55 | 0.48 | 1.0 | 1.5 | (5.) | Chlorides | | | mg/l | | 661 | 525 | 250 | 1000 | (6.) | Total Hardness | | | mg/l | | 378 | 271 | 300 | 600 | (7.) | Heavy Metals | | Copper | mg/l | | 0.05 | 0.05 | 0.05 | 1.5 | |
14.3. No. of Surface Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 2 | 1 | A | (2.) | DO | | mg/l | | 7.3 | 3.6 | A | (3.) | pH | | Others | pH unit | 7.65 | 7.29 | A | (4.) | COD | | mg/l | | 5 | 2 | A | (5.) | Others | Sodium | mg/l | | 295 | 119 | A | |
14.4. No. of Ambient Noise Monitoring Locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.2 | 51.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.9 | 39.8 | 70 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH Unit | 8.05 | 7.48 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 2.48 | 1.29 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 3.25 | 2.5 | (4.) | K(Potassium) | Milligram per Kilogram | | 236 | 151 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 126 | 30 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC water supply | 2.4 | 10 | Not Appliacble | Pipeline | | Others | GIDC water supply | GIDC/DMA/ODV/8760 | 23 Mar 2012 | 2.4 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 0.75 | 1 | Soak Pit | Others | Discharge in Soak pit | 00 | 0.75 | (2.) | Industrial | 0.28 | 0.5 | ETP and kettle type evaporator | Others | Evaporated in evaporator | 00 | 0.28 | |
|
16.1. | (a)Total Waste Water Generation | 1.03 | (b)Total Discharged Water | 1.03 | (c)Total Reused Water | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.6 | Tons | 25 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Evaporation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.9 | Tons | 25 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Discarded Drums/Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 52.8 | Tons | 25 | Road | | Authorized Recyclers | | (4.) | Liners/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3.85 | Tons | 25 | Road | | Authorized Recyclers | | (5.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.3 | Kilolitre | 25 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 75.46 | 1.41 | 62.2 | 1.323 | 100 | (2.) | NOx | | Microgram per Meter Cube | 25.55 | 1.41 | 18.7 | 1.184 | 19.884 | (3.) | SO2 | | Microgram per Meter Cube | 20.58 | 1.41 | 14.2 | 0.618 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 34.78 | 1.41 | 28.4 | 1.323 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D G Set | Diesel | 7 | 0.225 | Others | SPM, SO2 NOX | 85 mg/Nm3, 25 ppm, 30 ppm | (2.) | Thermic Fluid Heater | Natural gas | 12 | 0.45 | Others | SPM, SO2 & NOx | 10 mg/Nm3, 12 ppm, 32 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60 | (b)Source | Torrent Power Limited | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D G Set of 65 kVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 00 | (b)Private Land | 0.0696 | (c)Government Land | 00 | (d)Revenue Land | 00 | (e)Other Land | 00 | Total Land | 0.0696 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 5721 | (b)Waste/Barren Land | 2609 | (c)Grazing/ Community Land | 00 | (d)Surface Water Bodies | 2452 | (e)Settlements | 10000 | (f)Industrial | 10653 | (g)Forest | 00 | (h)Mangroves | 00 | (i)Marine Area | 00 | (j)Others : NA | 00 | Total | 31435 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Green belt | | 0.021 | | (2.) | Main Plant | | 0.0185 | | (3.) | Built Up Area | | 0.0080 | | (4.) | Others | Road, open margin | 0.0221 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None within 10 km radius | 00 | None within 10 km | (2.) | WLS | None within 10 km radius | 00 | None within 10 km | (3.) | NPA | None within 10 km radius | 00 | None within 10 km | (4.) | ESZs | None within 10 km radius | 00 | None within 10 km | (5.) | Corridors | None within 10 km radius | 00 | None within 10 km | (6.) | ESAs | None within 10 km radius | 00 | None within 10 km | (7.) | Wildlife Corridors | None within 10 km radius | 00 | None within 10 km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None within 10 km | 00 | None within 10 km | (2.) | Defence Installations | | None within 10 km | 00 | None within 10 km | (3.) | Archaeological Sites | | None within 10 km | 00 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.0696 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in Rs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Odhav pond | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 16 | (c)Temporary Employment- During Construction | 15 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 26 | (f)Total Manpower | 31 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 25 | 185 | 210 | (2.) | Percentage of Total Project Area | 3.5 | 26.5 | 29 | (3.) | No. of Plants | 7 | 47 | 54 | (4.) | Funds Allocated | 0.3 | 0.7 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Contributing to nation via paying various taxes | (2.) | Social | Employment generation, CSR activities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd., Ahmedabad | (iii)Address | 424, Medicine Market, Paldi Cross Road, Paldi, Ahmedabad | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | manhendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 23 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 29/05/2019 | Documents not visible, Kindly apply again. | | (2.) | 06/06/2019 | The correction have been made as per the instruction received | | (3.) | 15/06/2019 | Documents not visible, Kindly rectify the issue with the help of NIC, Delhi. | | (4.) | 26/06/2019 | The correction have been made as per the instruction received | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mukesh Patel | Designation | Partner | Name of Company (Applicant Name should not be given here) | POLYMERS INDIA | Address | Plot No. C-1/355 GIDC Odhav, Ahmedabad |
|