Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) UMED NI MUVADI MINERAL BAUXITE MINE
(b)Name of the Company / Organisation PATEL JAYANTIBHAI DWARKADAS
(c)Registered Address opp G E B, Vallabhkunj society, At,Ta- Talod,Dist-Sabarkantha,,Sabar Kantha,Gujarat-383215
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Patel Jayantilal Dwarkadas J D Patel
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Opp G E B, Vallabhkunj society, At-Ta-Talod, Dist-Sabarkantha,,Talod,Sabar Kantha,Gujarat-383215
(d)Pin code 383215
(e)E-mail ghml5002@gmail.com
(f)Telephone No. 2772-243570
(g)Fax No. 243570
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/MIN/34744/2016
(e)Master Proposal Number(Single Window) SW/102269/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 42(p)
(b)Pincode 383215
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 21
Second 41
From
Degree 23
Minutes 21
Second 05
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 59
Second 18.7
From
Degree 72
Minutes 59
Second 24.6
(e)Survey of India Topo Sheet No. 46A15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 117
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 105
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratSabar KanthaPrantijUmed Ni Muvadi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/TOR/1(a)/147/2017
(b)Date of Apply of TOR 21 Dec 2016
(c)Date of Issue of TOR / Standard ToR 15 Mar 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :0.2
Project Site
State :Gujarat
District :Sabar Kantha
Tehsil :Prantij
Village :Umed Ni Muvadi
25Related to Environment and water, asked to help nagar palika locallyOthersAdditional District Magistrate
(2.)
Date of Advertisement :16 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :0.50
Patel Jayantibhai Dwarkadas Survey No. 42 P Umed Ni Muvadi Ta : Talod Dist : Sabarkantha
State :Gujarat
District :Sabar Kantha
Tehsil :Talod
Village :Umed Ni Muvadi
43UploadDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Trucks, JCB8 ton capacity truck
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2 ha11500Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.25
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.25
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.24
(e) Funds Allocated for Environment Management Capital(%) 100.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)N/A00Tons per AnnumN/ARoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube49.724.733.760
(2.)SO2Micro Gram per Meter Cube26.611.617.680
(3.)NOxMicro Gram per Meter Cube35.318.424.780
(4.)PM10Micro Gram per Meter Cube96.757.473.1100
(5.)OtherscoMili Gram per Meter Cube0.860.250.611HR=04
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.487.1478.5
(2.)TDSmg/l516.1450.85002000
(3.)TSSmg/l00000000
(4.)Heavy MetalsIronmg/l0.050.050.30.3
(5.)OthersMagnesiummg/l21.615.430100
(6.)Total Hardnessmg/l249.9177.4200600
(7.)Fluoridemg/l0.90.711.5
(8.)Chloridesmg/l71.147.3200600
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.467.26A
(2.)DOmg/l64.6C
(3.)BODmg/l6.95.3D
(4.)CODmg/l31.021.1D
(5.)OthersTDSmg/l883647.9C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))48.344.955
(2.)Leq(Night)A-weighted decibels(dB(A))39.938.445
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH11.167.31
(2.)N(Nitrogen)Percent11
(3.)Electric ConductivityMillisiemens per Centimetre647.3380
(4.)P(Phosphorus)Milligram per Kilogram11
(5.)K(Potassium)Milligram per Kilogram2.011.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 33 To 38
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers103Copy of Permission LettermodeOtherstankersOthersTankers nearby villages00001 Jan 190010
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.30.3septic tankGreen Belt Renewal Plant0.3
16.1.
(a)Total Waste Water Generation 0.3
(b)Total Discharged Water 0
(c)Total Reused Water 0.3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mineralized wasteOthersOB dump and mineralized2001Tons0OthersHaul roadOthersback filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000000000
(2.)SO2Microgram per Meter Cube0000000000
(3.)NOxMicrogram per Meter Cube0000000000
(4.)Others(Specify)coMicrogram per Meter Cube0000000000
(5.)PM10Microgram per Meter Cube96.71.572298.7100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000000PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1
(b)Source Electricity department
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 00
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 2
(d)Revenue Land 0
(e)Other Land 0
    Total Land 2.00
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 2
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : SC/ST 0
    Total 2
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area1.1012
(2.)OB Dump Area0.1277
(3.)Green belt0.030
(4.)Othersundisturbed0.7411
Total 2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanil0No
(2.)WLSnil0No
(3.)NPAnil0No
(4.)ESAsnil0No
(5.)ESZsnil0No
(6.)Corridorsnil0No
(7.)Wildlife Corridorsnil0No
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnil0no
(2.)Archaeological Sitesnil0no
(3.)OthersR&Rnil0no
(4.)Defence Installationsnil0no
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Upstream, Downstream, Project site of Khari river, Near Umed ni muvadi
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 2
(d)Temporary Employment- During Operation 7
(e)No. of working days 300
(f)Total Manpower 19
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.66
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 1640
(d)Funds Allocated for Plantation 70000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAt the end of mining water reservoir shall made and greed area shall be developed
(2.)SocialIt provided direct employment to approx. 19 people due to capacity expansion project. Further, it may also provide indirect employment to 45 persons
(3.)Otherslivelihood shall be improved in near by area
(4.)FinancialIt will provide employment to people and funds shall be released in CSR for need basis assessment in nearby villages
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)bauxiteMajor
2.
Mine Capacity in ROM (Run of Mine) 11500
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 682(23)(832)/2016-MDR(?)???
(b)Date of Approval 07 Jun 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 2
(f)Approved Capacity 11500
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.149166
(b)Mineable Reserves (Million Ton) 0.149166
(c)Extractable Reserves(Million Ton) 0.1342494
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral 111
(f)Stripping Ratio 1 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 11
(i)Mining Method Opencast
(j)Life of Mine (Years) 20
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 2
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof lease deed
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 2
(iii)Validity of the lease deed From : 03 Sep 1985 To : 02 Sep 2025
(iv)Date of Execution of Mining Lese 03 Sep 2005
(v)Reference Number No.MDR1584 (P-74) 1833-JHH
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 11 Jul 2005 From : 03 Sep 2005 To : 02 Sep 2025 Copy of Earlier LeaseNo.MDR1584 (P-74) 1833-JHH 2
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.1277
(iii)Height (in meter) 5
(iv)Quantity (in Million Cubic meter) 7846
(v)No. of year back fill up 10
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.1277
(iii)Height (in meter) 5
(iv)Quantity (in Million Cubic meter) 7846
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 3139
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 3139
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 3139
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.1012
(b)Depth (in meter) 5
(c)Volume (in Million Cubic meter) 55060
12.
Details of Quarry:
(a)Final Void of 1.1012 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.1012
13.
Details of Transportation:
(a)In Pit/Underground to Surface dumpers
(b)Surface to Siding/Loading trucks
(c)Transportation / Conveyor Details road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND002069563.8462069563.846
(2.)FOREST LAND00000
(3.)WASTE LAND2978407.205978409.205
(4.)GRAZING LAND00000
(5.)SURFACE WATER BODIES0019456.50919456.509
(6.)SETTLEMENTS00154825.534154825.534
(7.)OTHERS(Specify)river0046555.41546555.415
TOTAL23268808.5093268810.509
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000000
(2.)GREEN BELT0.6600000.66
(3.)BUILT UP AREA (COLONY/OFFICE)0000000
(4.)ROADS00000.6910.691
(5.)TOP SOIL STORAGE0000000
(6.)EXTERNAL OB DUMPS0000000
(7.)VIRGIN AREA0000000
(8.)Otherunused0000000
(9.)EXCAVATION/QUARRY001.1012001.1012
TOTAL0.661.10120.69102.4522
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.1277
(c)Quarry(in hectare) 1.1012
(d)Safety Zone(in hectare) 0.15
(e)Final Void of 1.1012 (hectare) at a Depth of 5 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 10000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 00
(h)Total afforestation plant (in hectare) 00
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)001150000115000000
(2.)001150000115000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/I821/IA0036
(ii)Name of the EIA Consultant Earthood Services Pvt. Ltd
(iii)Address 424A, Tower B3, Spaze I-Tech Park, Gurgaon, Haryana
(iv)Mobile No. 9716173106
(v)Landline No. 9015858112
(vi)Email Id sv.prashant@earthoodd.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 11 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)04/10/20191.Kindly upload valid extended lease document in favour of applicant. 2.Kindly address revised TOR compliance status in final EIA report. 3.Kindly submit details of written complaints and its reply during and after public hearing
(2.)04/10/20191.Kindly upload valid extended lease document in favour of applicant. 2.Kindly address revised TOR compliance status in final EIA report. 3.Kindly submit details of written complaints and its reply during and after public hearing
(3.)03/02/2020The correction have been made as per the instruction received
(4.)03/02/2020Kindly upload valid extended lease document in favour of applicant.
(5.)28/09/2022The correction have been made as per the instruction received
(6.)29/09/20221. Kindly clarify the date of ToR issued and give justification regarding the validity of ToR 2. One of image (500 m radius) shows signs of excavation, Kindly clearly state whether it is a case of Violation (especially from production point) or not. 3. Kindly Upload Project details validated by the district geologist including distance from the nearest human habitation, PF/RF, and applicable category of the Project – including cluster applicability. 4. Give detailed list of all environmental sensitivity criteria (distance criteria) and clearly state whether proposal satisfies the distance criteria as per the requirements. 5. Clearly state the validity of Approved Mining Plan. 6. The lease documents are not legible. Kindly upload clear legible Lease document also mention the completer reference of Lease document with clear mention of its validity 7. The PP/Consultant has uploaded Executive Summary of EIA prepared by Cognizance Research India Pvt Ltd. (NABET & QCI Accredited) GT-20, Sector-117, Noida, U.P. kindly clarify the involvement of two NABET Consultant and upload the Work order/ agreement between the two NABET accredited agencies. 8. Kindly upload undertaking regarding information submitted in Form-1, Approved Mine plan, Prefeasibility report and Project details validated by the district geologist are identical and does not differ. 9. Uploaded a copy of authorization duly SIGNED by the project proponent in support of the person making this application (on behalf of the User Agency) along with complete contact details - including mobile number(s) / office ADDRESS of the consultant as well as completer contact details of the PP. 10. Ensure that all required documents are uploaded.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPatel Jayantilal Dwarkadas J D Patel
DesignationOwner
Name of Company (Applicant Name should not be given here)PATEL JAYANTIBHAI DWARKADAS
Addressopp G E B, Vallabhkunj society, At,Ta- Talod,Dist-Sabarkantha
Print