APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Enhancement the production of Litariya China Clay, Ball Clay & Silica Sand Mining Project (M.L. No. 07/94) of Smt. Dariyav Kanwar
(b)Name of the Company / Organisation DARIYAV KANWAR
(c)Registered Address W/o Sh. Vishan Singh Village- Malpuria, P.O Birol, Teh- Jaitaran, Distt- Pali(Raj),,Barmer,Rajasthan-306302
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Dariyav kanwar
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Village- Malpuria, P.O Birol, Teh- Jaitaran, Distt- Pali(Raj),,Jaitaran,Pali,Rajasthan-306302
(d)Pin code 306302
(e)E-mail dariyakanwarmine@gmail.com
(f)Telephone No. 141-2223290
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/34309/2017
(e)Master Proposal Number(Single Window) SW/101319/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2022,2023,2024, 2025, 2026, 2027, 2028, 2029, 2030
(b)Pincode 306308
(c)Bounded Latitudes (North)
From
Degree 26°20’ 11.55”
Minutes
Second
From
Degree 26°20’ 59.65”
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73°52’57.76”
Minutes
Second
From
Degree 73°53’0.69”
Minutes
Second
(e)Survey of India Topo Sheet No. 15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 298
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanPaliJaitaranLitariya
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA/RJ/MIN/62995/2017
(b)Date of Apply of EC 06 Mar 2017
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :3.0
Atal Sewa Kendra, Village Kanecha, Tehsil-- Jaitaran, District- Pali
State :Rajasthan
District :Pali
Tehsil :Jaitaran
Village :Litariya
72Dust generation issue has raisedOthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/Mine-454/744/09/43
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Mining95000280000375000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Dumper224On Hire Basis
(2.)Water Tanker112On Hire Basis
(3.)Excavator112On Hire Basis
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 23 Jan 2017
(iv)Valid Upto 31 Dec 2021
(v)File No. F(Mines)/Pali(Jaitaran)/88(1)/2016-2017/9861-9865
(vi)Application No. Nil
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.10
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.004
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 50
(b)Existing quantity of raw material/fuel 150
(c)Total quantity of raw material/fuel 200
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel60000OthersLiterLocal MarketRoad1.0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 27 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube70.2141.6368.80100
(2.)PM2.5Micro Gram per Meter Cube42.7120.0541.8560
(3.)SO2Micro Gram per Meter Cube19.749.9919.3480
(4.)NOxMicro Gram per Meter Cube34.5018.6533.8180
(5.)OthersCOMili Gram per Meter Cube0.2810.2030.2752.0
    14.2.     No. of Ground Water Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.617.556.58.5
(2.)Total Hardnessmg/l374.26273.49200600
(3.)OthersCumg/l0.030.030.051.5
(4.)TDSmg/l1574.221272.885002000
(5.)Chloridesmg/l251.46113.952501000
(6.)TSSNA0000
(7.)Heavy MetalsAsmg/l000.010.05
(8.)Fluoridemg/l1.981.201.01.5
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.566.5E
(2.)DOmg/l4.804.80E
(3.)BODmg/l16.016.0E
(4.)CODmg/l20.020.0E
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.247.275
(2.)Leq(Night)A-weighted decibels(dB(A))49.536.670
    14.5.     No. of Soil Sample Monitored Locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.0350.03
(2.)P(Phosphorus)Milligram per Kilogram8.498.0
(3.)K(Potassium)Milligram per Kilogram85.071.14
(4.)Electric ConductivityMillisiemens per Centimetre281260
(5.)pH8.828.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 102
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 98
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Water8.03.0Copy of Permission LettermodeOthersTanker by RoadOthersTanker WaterNil02 Jan 19008.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3.50Septic TankOthersSeptic Tank03.5
16.1.
(a)Total Waste Water Generation 3.5
(b)Total Discharged Water 3.5
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mine WasteOthersOverburden5008Tons0RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube57.54017.3674.90100
(2.)SO2Microgram per Meter Cube14.406.00.1214.5280
(3.)NOxMicrogram per Meter Cube25.256.00.2425.4980
(4.)PM2.5NA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 84.70
(c)Government Land 2.20
(d)Revenue Land 0
(e)Other Land 0
    Total Land 86.90
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 84.70
(b)Waste/Barren Land 2.20
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Nil 0
    Total 86.9
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersMining86.90Mining will be carried out in lease area
Total 86.9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None
(2.)NPANone0None
(3.)ESZsNone0None
(4.)CorridorsNone0None
(5.)Wildlife CorridorsNone0None
(6.)Critically Polluted AreaNone0None
(7.)ESAsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0None
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 86.90
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Luni Nadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 60
(e)No. of working days 330
(f)Total Manpower 65
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Funds Allocated2.04.06
(2.)Total Area of Green Belt1.412.8813
(3.)No. of Plants7301227013000
(4.)Percentage of Total Project Area1.6114.8215
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 3
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Ball ClayMinor
(2.)China ClayMinor
(3.)Silica SandMinor
2.
Mine Capacity in ROM (Run of Mine) 280000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/JO/CC/SOJAT/Minor/M.L./07/1994/7178
(b)Date of Approval 24 Jan 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 86.90
(f)Approved Capacity 280000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 314.11843
(b)Mineable Reserves (Million Ton) 143.80156
(c)Extractable Reserves(Million Ton) 143.80156
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 90
(f)Stripping Ratio 1 : 21
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 30
(i)Mining Method Opencast
(j)Life of Mine (Years) 51
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 86.90
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof lease has been granted and valid till 30.04.2047 v
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 93.245
(iii)Validity of the lease deed From : 30 Apr 1996 To : 07 May 2019
(iv)Date of Execution of Mining Lese 30 Apr 1996
(v)Reference Number 07/1994
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof lease has been granted and valid till 30.04.2047 v
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 09
(ii)Total Area (in Hectare) 7.8
(iii)Height (in meter) 13
(iv)Quantity (in Million Cubic meter) 0.352
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.050
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.050
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 38.102
(b)Depth (in meter) 50
(c)Volume (in Million Cubic meter) 143.80
12.
Details of Quarry:
(a)Final Void of 38.102 (hectare) at a Depth of 50 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 38.102
13.
Details of Transportation:
(a)In Pit/Underground to Surface Tractor
(b)Surface to Siding/Loading Excavtor
(c)Transportation / Conveyor Details Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)AGRICULTURE LAND84.70084.7
(3.)FOREST LAND000
(4.)SURFACE WATER BODIES000
(5.)WASTE LAND2.2002.2
(6.)SETTLEMENTS000
TOTAL86.9086.9
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY2.8819.57022.45
(2.)EXTERNAL OB DUMPS0000
(3.)INTERNAL OB DUMPS0000
(4.)BUILT UP AREA (COLONY/OFFICE)000.0020.002
(5.)VIRGIN AREA0000
(6.)GREEN BELT11.4000011.4
(7.)TOP SOIL STORAGE000.0200.02
(8.)ROADS0000
TOTAL14.2819.570.022033.872
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 2.88 (hectare) at a Depth of 50 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 625
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 14.28
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 7.130
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2017950009500095000754000
(2.)2018950009500095000938200
(3.)2016950009500095000258430
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 127
(ii)Name of the EIA Consultant M/s Ramji Mine Envirotech
(iii)Address Plot No. 21, I Floor, Aarana 2 Tower, Kartarpura Industrial Area, 22 Godam, Jaipur
(iv)Mobile No. 9829118043
(v)Landline No. 0141222329
(vi)Email Id ecipl2013@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 10 Jul 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)13/06/2019the proposals/ application is found deficient /incomplete in respect to following:- a) Form 1. b) Approved Modified Mining Plan along with validity and date of approval c) Certificate regarding mine lease area not falling in the Aravali Hills issued by the Mining Engineer/ Assistant Mining Engineer in the prescribed format. d) Affidavit regarding violation of EIA notification and regarding correctness of submitted data & document by consultant as well as project proponent. e) Duly filled environment sensitivity portion of Form I clearly showing distance from national / state boundary / protected areas / sanctuaries/National park and if area falls within 10 kms from boundary of sanctuaries /National park a copy of application submitted to NBWL,New Delhi. f) Partnership deed/Directors list(if applicable). g) Water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water
(2.)02/08/2019The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDariyav kanwar
DesignationOwner
Name of Company (Applicant Name should not be given here)DARIYAV KANWAR
AddressW/o Sh. Vishan Singh Village- Malpuria, P.O Birol, Teh- Jaitaran, Distt- Pali(Raj)