Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Expansion of group Housing Project “Raheja Residential Complex” Company/Organisation Name MESSRS RAHEJA DESIGN & CONTRACTS LTD
Registered Address A-201, Okhla Industrial Area, Phase-I, New Delhi Delhi 110020 Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant SAVITA RAHEJA
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address A-201, Okhla Industrial Area, Phase-I, New Delhi,South,Delhi-110020
(d)Pin code 110020
(e)E-mail rahejadesigncontracts@gmail.com
(f)Telephone No. 120-4044630
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/Activity8(a) Building and Construction projects
(c)Category B2
(d)Proposal Number SIA/RJ/MIS/34279/2017
(e)Master Proposal Number(Single Window) SW/101452/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJaipurSanganerDholai
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Patrakar Colony Mansarovar, Vill.-Dholai, Tehsil- Sanganer, Jaipur, and Rajasthan
Town / Village
(Name of more than one town may be entered by separating with)
Dholai Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Patrakar Colony Mansarovar, Vill.-Dholai, Tehsil- Sanganer, Jaipur, and Rajasthan
State Rajasthan District Jaipur
Tehshil Sanganer Pincode 302029
Nearest railway station Sanganer Railway Station Distance from the project site 4.5
Nearest airport Jaipur Airport Distance from the project site 7
Nearest Town/City/District Headquarters Jaipur Distance from the project site 0
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Village –Dholai, Tehsil - Sanganer , District Jaipur, Rajasthan. Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 25,368.49 Existing Built Up Area(In Meter /Sqr) 19,110.85
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 00
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Land was allotted for Expansion of Group Housing Project in Jaipur, Rajasthan 302020.
1.2 Clearance of existing land, vegetation and buildings? No The construction of project does not require any clearance of existing Land, Vegetation & Building.
1.3 Creation of new land uses? No Land had been earmarked for Expansion of Group Housing Project in Jaipur, Rajasthan 302020, so there has been no creation of a new land use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigation was carried out and the results were found satisfactory.
1.5 Construction works? Yes We had acquired land area of 7100 Sq. m for developing Group Housing Project at Patrakar Colony Mansarovar, Village – Dholai, Tehsil - Sanganer Distt.- Jaipur (Rajasthan) of M/s Raheja Design & Contract Limited. The drawings for 25,368.49 sq.m. of the built up area was approved by JDA and RPCB granted the exemption from Environment Clearance vide letter no. RPCB/RO, JPR(s)/GEN./17/224 and the construction started for the same. Now, the project planning has expanded and we propose to add 6,257.
1.6 Demolition works? No No demolition work was required for proposed project.
1.7 Temporary sites used for construction works or housing of construction workers? Yes All the construction activity including stocking of raw materials had been confined within the project site. No labour hutments are proposed as local labors had been hired from nearby area. Sanitation and other requisite facilities had been developed at site for labour.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No The total 12466.0 cum excavated earth material generate during construction utilized at the site for leveling, backfilling and green area development.
1.9 Underground works including mining or tunneling? No No underground works including mining/ tunneling is required except excavation of earth.
1.10 Reclamation works? No No reclamation work was required.
1.11 Dredging? No No dredging was required.
1.12 Offshore structures? No No offshore structures involved.
1.13 Production and manufacturing processes? No No production/manufacturing process was involved as the project is Construction project.
1.14 Facilities for storage of goods or materials? Yes Raw material had been stored at site in a covered area. Cement was separately stored under cover in bales. Sand was stacked neatly under tarpaulin cover. Bricks and steel were laid in open.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste Solid wastes which are likely to be generated in project were domestic in nature. Domestic wastes: Approximately, 425 kg/day domestic solid waste (Residential Population: & Floating Population) is estimated to be generated from the project activity; this has been collected from designated locations and segregated into inorganic and organic wastes. The bio degradable waste has been composted by vendors outside the project premises. Liquid Effluent: During construction phase, sewa
1.16 Facilities for long term housing of operational workers? Yes The housing facility for residential people has been be provided in proposed project.
1.17 New road, rail or sea traffic during construction or operation? No The project site is well connected to NH-11by service road leading to various parts of city. There is no need to construct new roads except internal roads
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The proposed site is well connected by roads to whole of the city, so there is no alteration of routes or lying down of new routes done due to project activity. Internal roads within the project site has been be constructed for smooth movement of traffic.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable, Since the site is connected to NH-11 by service road so there has been be no need for closure or diversion of transport routes or infrastructure.
1.20 New or diverted transmission lines or pipelines? No There has been not be any new/diverted transmission lines or pipelines around the project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses is proposed.
1.22 Stream crossings? No There are no streams running across the site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water requirement is being met from PHED water Supply.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes There has been no effect on surface area drainage / Runoff as the land area involved in the project is flat land. Apart from this for collecting storm water, storm water drainage network had been design & provided, as per the guidelines. Adequate measure had taken to collect runoff of rain water and suitable drain system along with recharging system had been provided. Drainage system is design as per the existing contours of site to easy accumulations of rain water during rainy days. Thus surfa
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The construction material transported to site by trucks and manpower had reached the site with their own conveyance.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning or restoration works involved.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None
1.28 Influx of people to an area in either temporarily or permanently? No Local laborers from nearby area had been employed during the construction phase. In the operation phase, most of the expected occupants have been be from the surrounding areas. Hence, the project has been lead to a redistribution of occupants within the city. Thus, no significant influx of people was envisaged.
1.29 Introduction of alien species? No No, alien species are reported yet.
1.30 Loss of native species or genetic diversity? No There is no significant impact on the native species or genetic diversity.
1.31 Any other actions? No Not Applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Land had been earmarked for developing Group Housing Project as per Master Plan of Jaipur, Rajasthan 2020.
2.2 Water (expected source & competing users) unit: KLD Yes During construction phase, and operation phase the Water supply has been be provided by PHED. About 77 KLD of fresh water has been be required during operation phase of the project.
2.3 Minerals (MT) Yes Minerals such as sand and aggregates were required during the construction phase.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All materials for construction had been arranged through local suppliers.
2.5 Forests and timber (source – MT) No Steel frames etc was used to minimize the use of timber.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power requirement is 1348 KW and it was sourced from Jaipur Vidyut Vitaran Nigam Ltd. (JVVNL).
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Diesel for DG sets had been stored in drums in earmarked locations. It is being handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures (with frequent spray of insecticides etc.) had been and has been be adopted in both the construction and operational phase such that there is no stagnation of water or accumulation of waste. This has been effectively restrict the reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Socio-economic standard of people has been improve due to increased employment opportunities provided by this project. This has been lead to better quality of life and has been also set a standard for future developments in the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not anticipated.
3.5 Any other causes No Not anticipated.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine waste had been generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal waste has been be generated during operational phase from various places, which has been be collected in bins.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous waste from the project has been be used oil from DG sets, which is classified as per The Hazardous Waste Category 5.1 as per The Hazardous Wastes (Management & Handling) Rules, 1989. Used oil from DG sets has been be stored in HDPE drums in isolated covered facility. This used oil has been be disposed of through authorized recyclers. Suitable care has been be taken so that spills/leaks of used oil from storage is avoided.
4.4 Other industrial process wastes No No other waste has been be generated.
4.5 Surplus product No No other surplus product
4.6 Sewage sludge or other sludge from effluent treatment Yes The mechanism of sludge drying has been be centrifugation and the dewatered/ dried sludge from STP has been be converted to cakes and has been be used as manures in horticulture after proper digestion or has been be disposed at designated place identified.
4.7 Construction or demolition wastes Yes The construction waste has consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc. Recyclable waste construction materials have been be sold to recyclers. Unusable and excess construction debris had been disposed at designated places in tune with the local norms.
4.8 Redundant machinery or equipment Yes Redundant machinery is being disposed as per applicable norms through authorized e-waste recycling agencies.
4.9 Contaminated soils or other materials No Contaminated soils or other material is not anticipated to be generated.
4.10 Agricultural wastes Yes Landscape waste approx. 0.053kg/day is being generated.
4.11 Other solid wastes No --
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The project does not envisage any major air pollution sources except operation of DG sets during power failure, factory machines and vehicular traffic.
5.2 Emissions from production processes No No significant emissions are anticipated from the process.
5.3 Emissions from materials handling including storage or transport Yes Small quantities of fugitive emissions are envisaged during transport and handling of construction materials. Such emissions were temporary and controlled by the use of sprinkling and other viable techniques like covering of loose material.
5.4 Emissions from construction activities including plant and equipment Yes This was restricted to the construction phase and the construction site only.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust was anticipated during loading and unloading of construction material and excavation of upper earth surface. These were temporary in nature, which were controlled by providing water sprinklers. Tarpaulin cover was provided on stored loose materials to reduce the dust emission.
5.6 Emissions from incineration of waste No No incineration of wastes is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Open burning of biomass/other material has been be prohibited on site.
5.8 Emissions from any other sources No Not anticipated.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise during operational phase has been DG sets (which has been in operation only during power failure), factory machines, pumps & motors and vehicles. All the machinery has been be of highest standard of reputed make and has been comply with standard i.e. The DG set room has been be provided with acoustic enclosure to have minimum 25 dB(A) insertion loss or for meeting the ambient noise standard whichever is on higher side as per E (P) Act, GSR 371 (E) and its amendments. Therefore, n
6.2 From industrial or similar processes Yes No major noise and vibration generating activities were involve in the Project, except due to running of various equipments / machinery & D.G. Sets during construction phase of the project. Proper maintenance of machineries reduced the generation of noise and vibration. All the workers had been equipped with PPE’s during construction / operation phase of project. Noise & Vibration generating equipments, machinery and D.G. Sets are installed in acoustic enclos
6.3 From construction or demolition Yes Due to various construction activities, there were short-term noise impacts in the immediate vicinity of the project site. The construction activities include the following noise generating activities: • Concreting, mixing & operation of DG sets. • Construction plant and heavy vehicle movement.
6.4 From blasting or piling No No blasting or mechanized piling had been done.
6.5 From construction or operational traffic Yes Some noise had been and has been be generated from vehicular movement during construction and operational phase but that has been minimized with green belt plantation.
6.6 From lighting or cooling systems No No significant noise impact results from lighting or cooling systems.
6.7 From any other sources No Not anticipated
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The used oil from DG sets has been carefully stored in HDPE drums at isolated storage, and periodically sold to authorized recyclers. All precautions has been taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 1989.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There has been no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage has been be carried out in onsite STP(s) of combined capacity 100KLD. The treated sewage has been be reused for toilet flushing and horticulture.
7.3 By deposition of pollutants emitted to air into the land or into water No The DG Sets has been provided with stack of adequate height. Hence adequate dispersion has been achieved to avoid deposition of pollutants in significant concentrations at any single location.
7.4 From any other sources No Not anticipated.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not anticipated.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes To minimize the risk of fire, firefighting facilities has been designed as per NBC norms.
8.2 From any other causes No Not anticipated.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The area is classified in Zone II (Low Damage Risk Zone) as per the BIS classification. Suitable seismic coefficients in horizontal and vertical directions respectively had been adopted while designing the structures.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes There is massive development in the area, which has been eventually increase economic status of the area through providing accommodation. The project would have positive impact on environment and scenic view.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not anticipated
9.3 Set a precedent for later developments Yes The project has been set a good example for later developments in the area.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not anticipated
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Nahargarh Wildlife Sancturay Approx. 13.17 km (NE)
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Govandpura RF Approx. 12.50 km (NW) Kilangarh RF Approx. 14.75 km (NE) Jhalana Bani RF Approx. 9.55 km (E) Amargahr RF Approx.13.65km (NE) Muhana RF Approx. 3.50 km (S) Amanishah Nala Approx. 4.37 km (E) Sadriya Nadi Approx. 13.15km (WNW)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Govandpura RF Approx. 12.50 km (NW) Kilangarh RF Approx. 14.75 km (NE) Jhalana Bani RF Approx. 9.55 km (E) Amargahr RF Approx.13.65km (NE) Muhana RF Approx. 3.50 km (S)
4 Inland, coastal, marine or underground waters Yes Amanishah Nala Approx. 4.37 km (E) Sadriya Nadi Approx. 13.15km (WNW)
5 State, National boundaries No There is no State or National boundary within 15 km of project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes NH-11 Approx. 3 km (ENE)
7 Defence installations No --
8 Densely populated or built-up area Yes Jaipur Approx.7 km (NNE)
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Saket Hospital Approx 3.3 km ENE ASG Hospital Approx 3.5 km ENE Sharda Hospital Approx 3.6 km E Turtles Pre-primary School Approx 3.2 km ENE Pearson School Jaipur Approx 2.4 km ESE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No There are no areas within 15 km containing important, high quality or scarce resources.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No There are no areas within 15 km which are subjected to pollution or environmental damage.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Earthquake The area is classified in Zone II (Low Damage Risk Zone) as per the BIS classification. Suitable seismic coefficients in horizontal and vertical directions respectively has been be adopted while designing the structures.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? Yes
6. Upload EIA Report Uploaded EIA Report.
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)28/05/2019the proposals/ application is found deficient /incomplete in respect to following:- a) Form 1. b) Form 1A. c) Affidavit regarding violation of EIA notification and regarding correctness of submitted data & document by consultant as well as project proponent. d) Duly filled environment sensitivity portion of Form I clearly showing distance from national/state boundary/protected areas / sanctuaries/National park and if area falls within 10 kms. from boundary of sanctuaries /National park a copy of application submitted to NBWL, New Delhi. e) Land Document. f) Partnership deed/Directors list. (if applicable)
(2.)02/08/2019The correction have been made as per the instruction received
(3.)15/10/2022The proposals/ application is found deficient /incomplete in respect to following: - 1. Location (maps showing general location / specific location /project boundaries and project site layout). 2. Project area and gross built-up area. 3. Affidavit regarding violation of EIA notification and regarding correctness of submitted data & document by consultant as well as project proponent. 4. Duly filled environment sensitivity portion of Form I clearly showing distance from national/state boundary/protected areas / sanctuaries/National Park and if area falls within 10 kms. from boundary of sanctuaries /National Park a copy of application submitted to NBWL, New Delhi. 5. Land Document. 6. Partnership deed/Directors list. (if applicable) 7. Disclosure of the consultant engaged including the sector and serial no. in the latest QCI/NABET list.
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSAVITA RAHEJA
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)MESSRS RAHEJA DESIGN & CONTRACTS LTD
AddressA-201, Okhla Industrial Area, Phase-I, New Delhi