Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Praful Overseas Pvt. Ltd
(b)Name of the Company / Organisation PRAFFUL OVERSEAS PRIVATE LTD.
(c)Registered Address Praful Overseas Pvt. Ltd. Plot No. 9C,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Narain Agrawal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Praful Overseas Pvt. Ltd. Plot No. 9C,,Bharuch,Gujarat-394116
(d)Pin code 394116
(e)E-mail praffuloverseas@gmail.com
(f)Telephone No. 2646-123456
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(d) Manmade fibres manufacturing
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/33583/2014
(e)Master Proposal Number(Single Window) SW/100226/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 9C, GIDC Estate, Panoli, Tal: Ankleshwar,
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21.548605
Minutes
Second
From
Degree 21.548799
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.003981
Minutes
Second
From
Degree 73.006243
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 32
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 18
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarpanoli
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number AWH-65175
(b)Date of Apply of EC 19 May 2014
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Unit is located in industrial estate panoli
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. GPCB/ANK-CCA-1243(2)/ID-11182/233276
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)360150210360Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Manufacturing plantNylon yarn and CPP (2.83 MW)Polymer ChipsNylon yarn and CPP (2.83 MW) and Polymer Chips
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Sep 2014
(iv)Valid Upto 06 Apr 2019
(v)File No. GPCB/ANK-CCA-1243(2)/ID-11182/233276
(vi)Application No. AWH-65175
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 600
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.74
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 2.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 7.74
(e) Funds Allocated for Environment Management Capital(%) 0.33
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1479
(b)Existing quantity of raw material/fuel 1080
(c)Total quantity of raw material/fuel 2559
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Natural gas10000Kilo Litre per Daynot applicablePipe Conveyor22 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 01 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube26.7215.752680
(2.)NOxMicro Gram per Meter Cube28.5318.632880
(3.)OthersO3Micro Gram per Meter Cube11.7310.5111100
(4.)PM10Micro Gram per Meter Cube95.9474.9195100
(5.)PM2.5Micro Gram per Meter Cube57.5143.555760
    14.2.     No. of Ground Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l34783725002000
(2.)Total Hardnessmg/l909.2165.3300600
(3.)Chloridesmg/l768.798.552501000
(4.)Heavy MetalsFemg/l22.080.290.31
(5.)Fluoridemg/l0011.5
(6.)TSSmg/l68250100
(7.)pHNA8.027.156.58.5
    14.3.     No. of Surface Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.336.5A
(2.)DOmg/l5.425.42A
(3.)OthersAlkanitymg/l375375A
(4.)BODmg/l00A
(5.)CODmg/l124.3124.3A
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))453745
(2.)Leq(Day)A-weighted decibels(dB(A))554655
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.167.32
(2.)K(Potassium)Milligram per Kilogram1082260
(3.)Electric ConductivityMillisiemens per Centimetre5542
(4.)N(Nitrogen)Milligram per Kilogram2112
(5.)P(Phosphorus)Milligram per Kilogram1813
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 120
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC WATER96815Copy of Permission LetterPipelineIntake WellNO/GIDC/DEE/PNL/166930 Jun 2017968
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 27575ETPOthersREUSE IN LAND IRRIGATION AND COOLING TOWER750
(2.)Domestic1515Septic tank/Soak pitOthersDisposed to septic tank and soak pit015
16.1.
(a)Total Waste Water Generation 90
(b)Total Discharged Water 15
(c)Total Reused Water 75
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste12Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Containers/barrels /liners /bagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons15RoadAuthorized Recyclers
(3.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons15RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube57.510.760.0983357.608360
(2.)NOxMicrogram per Meter Cube28.530.760.0325028.562580
(3.)PM10Microgram per Meter Cube95.940.760.0983396.083100
(4.)SO2Microgram per Meter Cube26.720.760.0656026.78580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boilercoal360.5PM10,SO2,NOx150,100,50
(2.)Thermic Fluid Heatercoal360.2PM10,SO2,NOx150,100,50
(3.)DG SetLDO80.2PM10,SO2,NOx150,100,50
(4.)CPPNatural Gas200.3PM10,SO2,NOx150,100,50
(5.)Boilercoal360.5PM10,SO2,NOx150,100,50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 16000
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 6.777
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.777
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 80.32
(b)Waste/Barren Land 33.37
(c)Grazing/ Community Land 1.98
(d)Surface Water Bodies 2.36
(e)Settlements 31.34
(f)Industrial 0.20
(g)Forest 135.48
(h)Mangroves 28.44
(i)Marine Area 0.54
(j)Others : marshy land 0.20
    Total 314.22999999999996
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant1.8122
(2.)Green belt2.8836
(3.)Area for Solid Waste Management0.3971
(4.)OthersETP,Tank farm,Parking1.6845
Total 6.7774
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0--
(2.)ESAsNA0--
(3.)ESZsNA0--
(4.)CorridorsNA0--
(5.)Wildlife CorridorsNA0--
(6.)WLSNA0--
(7.)Critically Polluted AreaNA0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Others--NA0--
(2.)Defence InstallationsNA0--
(3.)ForestNA0--
(4.)Archaeological SitesNA0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.777
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired LAND IS ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 60
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 65
(d)Temporary Employment- During Operation 65
(e)No. of working days 325
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt28836.10028836
(2.)Percentage of Total Project Area33033
(3.)No. of Plants576705767
(4.)Funds Allocated18000000018000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialLOCAL EMPLOYMENT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay order against QCI Nabet
(ii)Name of the EIA Consultant Aqua air environmental pvt ltd
(iii)Address 403,Center Point,Nr Kadiwala school, ringroad , surat
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aquaair_surat@hotmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)30/03/2019Documents not visible, Kindly apply again.
(2.)06/04/2019The correction have been made as per the instruction received
(3.)17/04/2019Documents not visible, Kindly apply again.
(4.)18/04/2019The correction have been made as per the instruction received
(5.)19/04/2019Documents not visible, Kindly apply again.
(6.)29/04/2019The correction have been made as per the instruction received
(7.)07/05/2019Documents not visible, Kindly apply again.
(8.)08/05/2019The correction have been made as per the instruction received
(9.)17/05/2019Documents not visible, Kindly apply again.
(10.)20/05/2019The correction have been made as per the instruction received
(11.)27/05/2019Kindly upload standard format of project details & Checklist for industrial projects. Kindly update the details of applicable category and state for the project. Kindly update data of Form 2 in accordance to EIA report.
(12.)29/05/2019The correction have been made as per the instruction received
(13.)06/06/2019Documents not visible in portal, kindly rectify the issue.
(14.)10/06/2019The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarain Agrawal
DesignationDirector
Name of Company (Applicant Name should not be given here)PRAFFUL OVERSEAS PRIVATE LTD.
AddressPraful Overseas Pvt. Ltd. Plot No. 9C,