Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Jackson Chemical Industries
(b)Name of the Company / Organisation JACKSON CHEMICAL INDUSTRIES
(c)Registered Address Plot No. 502/4, 5, 6, Nr. GIL, GIDC Ankleshwar, Dist. Bharuch,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Rajubhai Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 502/4, 5, 6, Nr. GIL, GIDC Ankleshwar, Dist. Bharuch,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail jackchem.ind@gmail.com
(f)Telephone No. 261-2460854
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/32663/2013
(e)Master Proposal Number(Single Window) SW/98698/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 501/2, 502/3, 4, 5, 6, Nr. GIL, G.I.D.C.,
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.619319
Minutes
Second
From
Degree 21.620128
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.016594
Minutes
Second
From
Degree 73.017903
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 85
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarGIDC-Ankleshwar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number GPCB/BRCH/CCA-4(2)/ID-15222/160363
(b)Date of Apply of EC 24 Jul 2013
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located inside of GIDC-Ankleshwar
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. AWH-56888
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)56050.5510.5560Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Manufacturing PlantDyes & Dyes IntermediatesDyes & Dyes IntermediatesDyes & Dyes Intermediates--
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Sep 2013
(iv)Valid Upto 24 Apr 2018
(v)File No. AWH-56888
(vi)Application No. 70759
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 7.34
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.3015
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 4.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 14.7
(e) Funds Allocated for Environment Management Capital(%) 14.29
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4500
(b)Existing quantity of raw material/fuel 500
(c)Total quantity of raw material/fuel 5000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulphuric Acid100Tons per AnnumLocal MarketRoad12 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube20.4216.422080
(2.)OthersNH3Micro Gram per Meter Cube000400
(3.)PM10Micro Gram per Meter Cube97.378.3597100
(4.)PM2.5Micro Gram per Meter Cube57.5143.985760
(5.)NOxMicro Gram per Meter Cube23.0518.162380
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.266.478.58.5
(2.)TDSmg/l200014621002100
(3.)Chloridesmg/l768.749.2710002000
(4.)Fluoridemg/l00100200
(5.)Heavy MetalsSodiummg/l246.453.745001000
(6.)OthersTotal Ironmg/l0.170.131010
(7.)Total Hardnessmg/l1251.990.215002000
(8.)TSSmg/l40280100
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.697.69A
(2.)DOmg/l5.465.46A
(3.)CODmg/l25.1325.13A
(4.)BODmg/l00A
(5.)Otherssulphatesmg/l47.1947.19A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.941.545
(2.)Leq(Day)A-weighted decibels(dB(A))54.646.755
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram988302
(2.)Electric ConductivityMillisiemens per Centimetre58.345.6
(3.)pH7.957.09
(4.)N(Nitrogen)Milligram per Kilogram156.496.22
(5.)P(Phosphorus)Milligram per Kilogram20.2512
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 150
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply405Copy of Permission LetterPipelineIntake WellNTA/ANK/DEE/WSI/208028 Dec 201740
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial26.430ETP-1 (Primary), ETP (Fully Fledge), MEEDischarge into Surface Water Body,Reuse within the Plant & Recycling22.074.33
16.1.
(a)Total Waste Water Generation 26.4
(b)Total Discharged Water 4.33
(c)Total Reused Water 22.07
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.015Kilolitre10RoadAuthorized Recyclers
(2.)Scrubbing MediaIndustrial Waste241.2Kilolitre0.2Pipe ConveyorOthersRecycled
(3.)Organic WasteIndustrial Waste12Tons15RoadCo-Processing
(4.)Discarded Containers/Barrels/Liners/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)50Tons10RoadAuthorized Recyclers
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)200Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spray Dryer SaltIndustrial Waste600Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube96.395.080.01196.401100
(2.)PM2.5Microgram per Meter Cube48.295.080.1148.30160
(3.)Others(Specify)Cl2Microgram per Meter Cube05.080.0010.001100
(4.)NOxMicrogram per Meter Cube20.565.080.00720.56780
(5.)SO2Microgram per Meter Cube18.315.080.0218.3380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HAG-1NG150.25PM10,SO2,NOx100,80,80
(2.)Boiler-2Coal/Briquette300.3PM10,SO2,NOx100,80,80
(3.)DG Set-1HSD90.1PM10,SO2,NOx100,80,80
(4.)DG Set-2HSD90.1PM10,SO2,NOx100,80,80
(5.)Boiler-1NG150.25PM10,SO2,NOx100,80,80
(6.)DG Set-3HSD90.1PM10,SO2,NOx100,80,80
(7.)HAG-2Coal/Briquette300.3PM10,SO2,NOx100,80,80
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 350
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG Set (125 KVA), DG Set (200 KVA) & DG Set (250 K
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.13153
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.13153
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 66.61
(b)Waste/Barren Land 40.89
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1.12
(e)Settlements 22.3
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Fallow, River , Other land 183.14
    Total 314.06
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant1580--
(2.)Green belt3500--
(3.)OthersStorage Area, ETP, Utility, Road, Open Area6235.3--
Total 11315.3
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area--0--
(2.)NPA--0--
(3.)ESAs--0--
(4.)ESZs--0--
(5.)Corridors--0--
(6.)Wildlife Corridors--0--
(7.)WLS--0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites--0--
(2.)Defence Installations--0--
(3.)Forest--0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.13153
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is already aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 10
(e)No. of working days 330
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt035003500
(2.)Percentage of Total Project Area03131
(3.)No. of Plants0850850
(4.)Funds Allocated025500002550000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCSR/CER
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. stay order against NABET/QCI
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Center Point, Nr. Kadiwala School, Ring Road, Surat– 395002, Gujarat, India.
(iv)Mobile No. 9898055574
(v)Landline No. 2460854
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 03 Mar 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)16/03/2019Documents not visible. Kindly apply again.
(2.)30/03/2019The correction have been made as per the instruction received
(3.)02/04/2019Documents not visible. Kindly apply again.
(4.)03/04/2019The correction have been made as per the instruction received
(5.)08/04/2019Documents not visible. Kindly apply again.
(6.)09/04/2019The correction have been made as per the instruction received
(7.)17/04/2019Documents not visible. Kindly apply again.
(8.)23/04/2019The correction have been made as per the instruction received
(9.)29/04/2019Documents not visible. Kindly apply again.
(10.)16/05/2019The correction have been made as per the instruction received
(11.)21/05/2019Documents not visible. Kindly apply again.
(12.)23/05/2019The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajubhai Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)JACKSON CHEMICAL INDUSTRIES
AddressPlot No. 502/4, 5, 6, Nr. GIL, GIDC Ankleshwar, Dist. Bharuch
Print